Active Transportation Plan
The City of Langford’s strategic plan for improving walking, rolling, cycling, and micromobility through infrastructure, policies, programs, and implementation priorities. It sets out a long-term network and actions intended to support safer, more connected, and inclusive travel.
Key facts
- Dated July 2026
- The plan process ran from Fall 2024 to Summer 2026
- The Official Community Plan target is for 42% of trips to be made by walking, rolling, cycling, or public transit when Langford reaches 100,000 residents
- The future cycling and micromobility network includes more than 13 kilometres of new protected bike lanes
Active Transportation Plan
Page 1
Active Transportation Plan JULY 2026
Page 2
Land Acknowledgment The City of Langford acknowledges and honours the traditional territories of the Coast Salish, specifically Xwsepsum (Esquimalt), Lekwungen (Songhees), Sc’ianew (Beecher Bay), and the WSÁNEĆ Peoples represented by the Tsartlip, Pauquachin, Tsawout, Tseycum, and Malahat Nations. We thank them for sharing this beautiful land. The City of Langford acknowledges and honours the importance of listening, understanding, and engaging meaningfully and intentionally with local First Nations. The City is committed to building strong relationships with the local Nations and is committed to ensuring this work is a priority and approached in a good way. While there is much work to do, and will be an ongoing evolving process, the City is going to start by understanding the priorities of all local First Nations on a one-on-one basis. This Plan may be enhanced to honour what we learn and will keep the City accountable to our commitments. This approach to building relationships with local First Nations will be applied to all City projects and initiatives with the commitment of being accountable partners, and strong allies to the Indigenous community.
Page 3
Table of Contents PART 1 / Introduction
1.1 Plan Overview
3 1.2 What is Active Transportation?
3 1.3 Why does Langford Need an Active Transportation Plan?
5 1.4 Achieving Mobility Choice
5 1.5 The TMP and ATP as Communications and Advocacy Documents
5 1.6 Addressing the “5 Crises” Facing Cities Through More
6
Transportation Choices
1.7 Achieving Mobility Choice and Accessibility
7 1.8 Plan Process
9 PART 2 / Active Transportation Context
2.1 Location
11 2.2 Demographic and Household Summary
16 2.3 How We Move Today
16 2.4 Emerging Transportation Trends
19 2.5 Land Use and Key Destinations
23 2.6 Overview of Active Transportation Today
23 2.7 Summary of Key Barriers to Active Transportation
27 PART 3 / Community Engagement
31 3.1 Overview
32 3.2 How We Engaged
32 3.3 What We Learned
35 PART 4 / Plan Framework
35 PART 5 / Future Active Transportation Network
40 5.1 Overview
41 5.2 Walking and Rolling
41 5.3 Cycling and Micromobility
45 5.4 Multi-Use Pathways
50 5.5 Quick Build Cycling Infrastructure
50 5.6 Summary of Active Transportation Projects
52 5.7 Crossings and Accessibility
53 5.8 Maintenance of the Active Transportation Network
58 1 10 PART 6 / Supportive Policies + Programs
59 6.1 Programs to Promote Active Transportation
61 6.2 Shared Streets and Temporary Street Closures
64 6.3 User Separation on Regional Trails
65 6.4 Amenities
66 6.5 Incentive-based Programs
69 6.6 Bylaw and Policy Updates
71
Page 4
Figure 1: Project Timeline
9 Figure 2: City of Langford Location within the CRD
12 Figure 3: Langford Neighbourhoods
15 Figure 4: Langford Mode Split by Travel Mode (2022)
17 Figure 5: Langford Trip Generators
21 Figure 6: Long-Term Walking and Rolling Network
42 Figure 7: Rendering of the Galloping Goose Regional Trail Active Transportation 43
Overpass in Colwood, BC
Figure 8: Bicycle Lane Transitioning to Protected Corner
45 Figure 9: Long-Term Cycling and Micromobility Network
46 Figure 10: Example of Accessibility Challenges at Jacklin Road /
53
Dunford Avenue / Station Avenue
Figure 11: Recommended Rack Types
66 PART 7 / Implementation Strategy
72 7.1 Active Transportation Infrastructure Project Evaluation
73 7.2 Intersection Accessibility Prioritization
76 7.3 Timelines, Partnerships, and Project Cost
78 7.4 Funding Opportunities
83 7.5 Monitoring and Evaluation
85 PART 8 / Next Steps
88 A Future Walking and Rolling Network
90 B Future Cycling and Micromobility Network
91 FIGURES
SCHEDULES
Page 5
PART 1 Introduction
Page 6
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 2 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 2 PART 1 Introduction Introduction and Overview The City of Langford Active Transportation Plan (ATP) is a foundational document that provides a strategic, long-term roadmap for advancing active transportation infrastructure, policies, and programs. As Langford continues to be one of the fastest growing communities in Canada — with a dynamic mix of urban, urbanizing, and suburban neighbourhoods and a high proportion of young families — there is a pressing need to diversify and strengthen the active transportation network to better serve all users. Since incorporation in 1992, Langford has prioritized road infrastructure to support residential and commercial growth, as well as regional connectivity to Highways 1 and 14. As streets approach capacity and land use patterns continue to evolve with densification and increased commercial activity, the need for safe, comfortable, and connected walking and cycling infrastructure has become increasingly evident. Providing a variety of travel options is essential to support mobility choice and meet the diverse needs of the community. Recognizing these challenges and opportunities, the City of Langford developed its ATP to guide the planning, design, and development of a more inclusive and sustainable multimodal transportation system. The ATP, in conjunction with the Transportation Master Plan (TMP), are intended to address congestion, reduce car dependency, increase mode choice, and improve access to the transportation network for people of all ages and abilities. The TMP and ATP were developed in parallel, and they reflect Langford’s broader objectives under its new Official Community Plan (OCP). The OCP highlights the importance of aligning land use with transportation planning — particularly through the development of high- density, mixed-use nodes that encourage shorter trips and support modal shift toward active and sustainable transportation. The OCP also sets specific goals and targets for the transportation network, including a mode shift objective of 42%, meaning that 42% of all trips are to be made by walking, rolling, cycling, or public transit by the time Langford reaches 100,000 residents. The overarching goal of the ATP is to create a safer, more connected, and inclusive network that encourages walking, rolling, and cycling for all residents.
Page 7
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 3 PART 1 Introduction 1.1 Plan Overview To guide the development of the ATP, the City undertook a comprehensive and collaborative planning process that combined technical analysis, public engagement, and strategic visioning. The overarching goal of the ATP is to create a safer, more connected, and inclusive transportation network that encourages walking, rolling, and cycling for all residents. This Plan delivers: • A snapshot of current conditions for active transportation in Langford, including a summary of barriers and challenges that limit walking, rolling, and cycling today. • A strategic framework for expanding and improving the active transportation network to support current users and accommodate future growth. • A clear picture of Langford’s future active transportation network, including the infrastructure, design requirements, and policies / programs that are needed to support more trips using active modes. • An implementation strategy that provides a roadmap for the recommended active transportation infrastructure projects including phasing and prioritization. The ATP will serve as a guiding document for building a safe, equitable, and sustainable transportation system that promotes healthy lifestyles, environmental goals, and access for people of all ages and abilities. 1.2 What is Active Transportation? Active transportation refers to any form of human-powered travel, including walking, cycling, rolling (e.g., skateboards, scooters, wheelchairs), and other non-motorized modes such as skiing, kayaking, and horseback riding. These modes are used for commuting, recreation, errands, or out of necessity, and benefit a wide range of users — including children, seniors, people with disabilities, and those without access to a personal vehicle. The concept of “All Ages and Abilities” (“AAA”) is central to active transportation planning. It ensures that infrastructure is designed to be safe, comfortable, and accessible for everyone, especially those often underrepresented in transportation planning — such as young children, seniors, racialized communities, women, and people with mobility challenges. Active transportation delivers a broad range of benefits that can help achieve community goals. These benefits are outlined on the next page in Table 1.
Page 8
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 4 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 4 PART 1 Introduction Benefit Description Environmental Passenger vehicles are one of the largest contributors to greenhouse gas emissions (GHG) in Langford. Shifting to active transportation is key to achieving the City’s ambitious climate goals, including a 61% reduction in community-wide GHG emissions by 2038 and net-zero corporate emissions by 2050. Choosing human-powered travel modes reduces air pollution, lowers emissions, and helps Langford build a cleaner, more sustainable future. Health Encouraging walking, cycling, and rolling as everyday transportation choices promotes healthier lifestyles in Langford. Regular physical activity helps reduce the risk of chronic diseases such as heart disease, obesity, and diabetes. Physical activity also contributes to better mental health and overall well-being. By integrating active transportation options into daily routines, Langford can build a more active, resilient, and healthy community. Economic Active transportation supports Langford’s local economy by making neighbourhoods and urban centres more accessible and appealing, with one example of increasing walk scores for real estate. Areas that are walkable, bikeable, and well-connected to transit tend to attract more foot traffic, benefiting local shops, restaurants, and services. For residents, choosing to walk, roll, or cycle can significantly reduce transportation costs compared to owning and operating a private vehicle. Safety Designing safe and inclusive infrastructure for walking, cycling, and rolling can reduce the risk of collisions and make streets safer for everyone. Protected bike lanes, traffic calming, enhanced crossings, and accessible pathways improve visibility and reduce vehicle speeds — creating a safer environment for children, seniors, people with disabilities, and all road users. Social Active transportation fosters community connection and equity. By making it easier and safer for people of all ages, incomes, and abilities to move around by multiple modes, Langford supports social inclusion and fair economic access, while reducing barriers to mobility. Active streets encourage face-to-face interaction, support cultural expression, and contribute to a stronger sense of place and belonging. This aligns with the City’s commitment to working with Indigenous partners and ensuring all planning is grounded in truth and reconciliation, and environmental stewardship. Table 1: Benefits of Active Transportation
Page 9
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 5 PART 1 Introduction 1.3 Why Does Langford Need an
Active Transportation Plan? Langford needs an ATP to more rapidly and intentionally advance mobility choice for residents, and to provide a clear plan and purpose for the implementation of active transportation infrastructure and policies. Mobility choice means providing a network that is more comfortable and connected for all users. Currently, many Langford residents and visitors do not feel comfortable walking, rolling, or cycling around the city, as the available options are limited or do not feel safe. This ATP is essential to guide a strategic shift toward a fully connected multi-modal transportation system that leads in best practices and supports a growing population while reducing congestion, lowering emissions, and improving mobility choices for all ages and abilities. The ATP will help Langford create a livable, climate-resilient city that prioritizes mobility choice, reduces costs for residents, and enhances overall quality of life by meeting goals and targets set out in the OCP. 1.4 How the ATP and TMP are
Equal, and Work Together There is significant connection and overlap between the Transportation Master Plan and the Active Transportation Plan; hence they are best read together to achieve the complete picture of transportation-related policy and intentions for Langford. However, given that each plan is a stand-alone document and that any one person may be only reading one plan at a particular moment, it should be noted that there is unavoidable duplication of text across the two plans. To make it clear which text is the same across both plans, the identical text is highlighted with a line indicator, while text unique to each plan is presented in normal text. Both the TMP and ATP are of equal importance and authority as transportation-related City policy. Neither takes precedence over the other; instead, they work together to present Langford’s complete transportation policy. This is important to clarify given that the Transportation Master Plan addresses larger vehicle movement, and in some cities such plans have been positioned, intentionally or unintentionally, as ”the real transportation plan”, with an active transportation plan seen as “less serious policy”. That is specifically not the case in Langford – in fact, the Official Community Plan’s transportation policy, reflected in both the TMP and ATP, prioritizes active transportation modes including walking, rolling, cycling, and public transit. It is understood that such prioritization should not be interpreted as being opposed to driving. Rather, it reflects the understanding that providing people with more mobility choices helps the transportation network function more effectively. In a growing city, mobility choices that move more people using less space can improve mobility and safety for everyone – including those who drive. 1.5 The TMP and ATP as
Communications and Advocacy
Documents The Transportation Master Plan and Active Transportation Plan together represent Council-approved transportation planning and policy for the City of Langford. While they are first and foremost, planning documents, they are also specifically intended to serve as long-term communication tools for the broader community, landowners, rights- holders, and stakeholders, and future Council members and staff. As such, the plans are designed not only to outline the City’s transportation policies and actions, but also to explain the intentions, considerations, and aspirations to assist future readers in better understanding the policies and their contexts. In other words, they communicate not only what the City intends to do, but also why and how. Providing this context helps future readers understand the policies and their contexts, which supports the successful implementation of the plans over time. The plans are also intended to support public and community advocacy by clearly articulating the City’s long-term commitments and objectives. In doing so, they help future readers hold decision-makers accountable for progress toward the plans’ goals. They also provide Councillors and staff with a foundation to advocate for consistent support and action from other levels of government, partner organizations, the private sector, and the community itself, helping ensure that future decisions remain informed by the plans’ long-term vision and objectives.
Page 10
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 6 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 6 PART 1 Introduction 1.6 Addressing the “5 Crises” Facing
Cities Through More
Transportation Choices As should be expected with the word “crises”, there must be a clear intention around true urgency in the realization of all the City’s plans, including the Transportation Master Plan and the Active Transportation Plan. This is particularly true given that certain crises, such as the Climate Crisis, are subject to science and natural laws/consequences that aren’t governed by what we afford or what our usual approaches and timeframes might be. There are immovable deadlines and unavoidable consequences that we face, whether we are ready or not. The following are the Five Crises that are facing all cities and how they are related to transportation: 1 – The Climate Crisis: The way we plan and build our cities and suburbs, and the infrastructure that supports them, will determine much of our success or failure in mitigating the climate crisis. How far and fast we go with decisions and implementation relating to the interconnection between land-use and transportation, will be the most important step our community will take toward this goal. 2 - Housing and Affordability Crisis: Housing and transportation represent the two biggest costs in determining how affordable or unaffordable our city will be as we grow. How new land-use and transportation decisions align, and in particular decisions affecting better transportation choices rather than more car dependency, will dramatically affect our cost-of-living realities.
3 - Equity Crisis: The extent to which our city and its opportunities are equitable and accessible for all citizens, now and in the future, is strongly influenced by our transportation practices and policies. In particular, true support for more attractive mobility choices is a critical cornerstone for the achievement of a more equitable, accessible and fair city.
4 - Public Health Crisis: The way we build cities and suburbs dramatically affects our individual health, as well as the overall public health system and its associated public costs. This reality is driven by the significant health implications of designing opportunities for regular activity, as well as health- related environmental quality, into our communities. Better land-use and transportation policies and actions will be the foundation for a healthier city as we grow.
5 - Infrastructure Cost Crisis: Where and how we grow, and the choices we support in how to get around, have a powerful effect on overall urban economics, and particularly the infrastructure, services, amenities, and municipal taxes that residents can afford. Growth and infrastructure approaches that positively contribute to the local economy, as opposed to those that need to be heavily subsidized by better planned areas, will be emphasized. Photo credits to (1) Peter McCabe (2) City of Langford, (3) EveryPixel, (4) Adrian Lam, (5) Journal of Commerce.
Page 11
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 7 PART 1 Introduction The OCP envisions the City of Langford as a place where residents are provided with many attractive mobility choices and are significantly less reliant on cars. To achieve this vision, the OCP sets out a comprehensive vision for enhancing active transportation as a cornerstone of a sustainable, inclusive, and efficient mobility network to achieve mobility choice. A central component of this vision is the development of a multi-modal transportation system that reflects Langford’s Modal Hierarchy, which prioritizes pedestrians and mobility aid users first, followed by cyclists and micro-mobility users, public transit, shared vehicles, commercial vehicles, and single-occupant vehicles. By following this hierarchy, Langford aims to significantly reduce car dependency and support healthier, more environmentally friendly modes of transportation, while still accommodating the needs of single-occupant vehicles. Rather than being “anti-driver,” this approach is well established to improve safety and mobility for everyone, including drivers, by helping growing cities move more people efficiently within limited space. Another key priority is the creation of an integrated transportation network that serves all ages and abilities. This means building infrastructure that is accessible and intuitive for children, seniors, and people with disabilities. Roads, trails, and crossings will be designed or retrofitted to include All Ages and Abilities principles, as highlighted in the BC Active Transportation Design Guide (BCATDG), to ensure safety, comfort, and usability for everyone. Lastly, but very importantly, Langford seeks to ensure that all development-related policies and bylaws demonstrate a strong synergy between land use and mobility. Higher density development will be focused in the City Centre, Urban Centres, and along Corridors, where residents will have safe, direct access to walking, cycling, and public transit infrastructure, providing convenient connections to nearby amenities such as shops, services, parks, and community infrastructure. This integrated approach will reduce reliance on single occupied automobiles, lower emissions, and improve quality of life for current and future residents. In lower-density areas, the City aims to support practical car travel while strategically and progressively improving connections for walking, cycling, and transit. Public Transit Ridership Versus Coverage Shifting many more trips to public transit will also require challenging decisions to strategically prioritize ridership, given finite operational resources and equipment, rather than pursuing broad service coverage alone. Increasing transit ridership requires important service decisions, including prioritizing direct routes along corridors with strong demand and major destinations in both directions, while minimizing the number of required transfers. It also requires frequent service, generally with buses arriving every 15 minutes or less, so riders experience shorter and more reliable wait times. By comparison, prioritizing (or even “balancing”) coverage over ridership often results in long, more circuitous routes with infrequent service. While this approach aims to ensure that most people are within a short walk of a transit stop, it can require multiple transfers and indirect travel paths to reach common destinations. Although this model may appear equitable, the nearest stop is often not served by routes that directly connect to where people need to go. As a result, trips take longer, require more transfers, and tend to discourage use, leading to lower ridership. Bus service may be infrequent, with arrivals every 30 to 45 minutes or longer. In order to significantly increase ridership to meet mode shift targets, the public has indicated that they would only be willing to use public transit if the service was more frequent, direct, and reliable. If “equity” is defined as ensuring that everyone is reasonably close to a level of public transit service that they would only use if they had no other choice, then it would come at the expense of frequent, reliable service and potentially decreasing ridership percentages across the city, given the finite number of buses and drivers available. In practice, experience has shown that a thoughtful focus on ridership and service quality can also improve overall coverage too. In addition, providing effective first- and last-mile connections to transit routes may be better achieved through complementary, service-oriented solutions such as on- demand shuttles, conveniently located micromobility or car share programs, and other supportive end-user facilities throughout the city. 1.7 Achieving Mobility Choice and
Accessibility
Page 12
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 8 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 8 PART 1 Introduction Our Most Important Transportation Goal – Mode Shift – and How We Could Fail To Achieve It Langford’s recently adopted Official Community Plan carries forward a critically important goal from the previous OCP: achieving a significant “mode shift” by the time the city reaches 100,000 residents. Mode shift refers to a substantial increase in the number of trips made using lower-impact transportation options—including walking, rolling, cycling, and public transit—in place of private vehicle trips. The OCP’s target is for 42% of all trips to be made by walking, rolling, cycling, and public transit by the time the city reaches that population milestone, compared to 13% today. Achieving this target would require that 29% of current total trips shift from private vehicles to active transportation and public transit. This is understood to be a very ambitious target for Langford, and one that will only be achievable if it is made a high priority in all relevant decision-making. This includes capital budgets, project phasing and timing, allocation of public space, urban design, infrastructure design, construction scheduling and strategies, and perhaps most importantly, land-use decisions that influence how people move throughout the city. Although all of these elements are critically important, particular emphasis must be placed on the pace and timing of implementation in order to reflect the sense of urgency discussed earlier. Transportation plans such as these often succeed in identifying the right actions needed to achieve their goals, but those actions can be implemented too slowly to adequately respond to the science-based timelines associated with many of the crises we face. The slow implementation can often be justified by ordinary realities such as conflicting priorities on limited capital budgets, a desire to coordinate improvements with other infrastructure work to reduce costs, or efforts to minimize construction-related disruption. However, slow implementation is also one of the most common reasons transportation plans fall short of their intended outcomes. The issue is often not a lack of good solutions, but rather the pace at which those solutions are delivered relative to the urgency of the problems they are intended to address. Slow implementation also has the added challenge of delaying observable progress and tangible benefits, making it more difficult to sustain public and political support over time. As a result, initiatives may be criticized as ineffective or even cancelled before they have had sufficient opportunity to achieve their intended goals. Realization of the mode shift goal, particularly the significant increase in public transit ridership required to meet the 42% goal, will also depend on proactive action in areas outside the City’s direct control. This will require ambitious advocacy and partnerships with all levels of government, the private sector, and other relevant stakeholders. Without an equally ambitious approach from these external partners, the likelihood of achieving this mode shift target is slim. However, this dependency is not intended as an excuse for inaction or failure; rather, it serves as a call to action for the City to do everything within its influence to support and advance collective, multi- jurisdictional success. It was well understood that setting (or in this case, maintaining) the ambitious mode shift target is the easy part, as illustrated by the fact that the target existed in the previous OCP without serious enough prioritization of action and implementation. In carrying it forward into the new OCP, a clear decision was made to emphasize the importance of “making it real this time”. Achieving this will require new approaches that go beyond “business as usual”, along with a willingness to rethink traditional approaches and comfort levels. Langford Modal Hierarchy
Page 13
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 9 PART 1 Introduction 1.8 Plan Process The TMP and ATP were developed over a 20-month process that kicked-off in Fall 2024 and wrapped up in Summer 2026. They were developed in a parallel five-phase process, as shown below: Figure 1: Project Timeline PHASE 1 Project Initiation and Baseline Conditions September to December 2024 PHASE 3 Transportation Network Development April to September 2025 PHASE 4 Public Engagement and Consultation - Round 2 October to November 2025 PHASE 2 Public Engagement and Consultation - Round 1 March to April 2025 PHASE 5 Draft and Finalize the TMP and ATP September 2025 to July 2026
Page 14
PART 2 Active Transportation Context
Page 15
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 1111 PART 2 Active Transportation Context Active Transportation Context The City of Langford is situated on the traditional territories of the Coast Salish Peoples, specifically the Xwsepsum (Esquimalt), Lekwungen (Songhees), Sc’ianew (Beecher Bay) Nations, and the W̱SÁNEĆ Peoples represented by the Tsartlip, Pauquachin, Tsawout, Tseycum, and Malahat Nations. Per the 2021 census, the City of Langford is now home to over 46,000 people, a 31.8% increase from 2016, making it the fastest growing municipality in British Columbia. Langford is a 41.43 km2 community with access to nature, parks, and many natural amenities, and multiple major commercial hubs scattered throughout the city including the downtown, Millstream Village, and West Shore Town Centre. Langford is bordered by four municipalities, each with distinct transportation characteristics. To the north, the District of Highlands is a rural area with limited development and shared industrial zones with Langford. View Royal, to the northeast, is primarily residential near Langford, with most of its border consisting of Thetis Lake Park. Colwood, to the southeast, is the most comparable to Langford, facing similar challenges related to growth, congestion, and multi-modal integration. To the south, Metchosin remains rural with no plans for densification, relying mainly on Highway 14 (Sooke Road) for regional connectivity. Langford serves as a key active transportation gateway into the Capital Regional District (CRD), with major regional corridors including the Galloping Goose Regional Trail between Sooke and Victoria, and the E&N Rail Trail between Langford and Victoria. Together, these routes provide important active transportation connections through the city and to neighbouring communities. These corridors form part of a broader regional active transportation network that supports both recreational and commuter travel. The City of Langford plays a significant role in the wider regional transportation system, acting as both a major destination for tourism and commercial shopping in the region, and a key generator of commuter trips. Figure 2 illustrates the City of Langford’s location within the Capital Regional District (CRD). 2.1 Location
Page 16
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 12 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 12 PART 2 Active Transportation Context Figure 2: City of Langford Location within the CRD
Page 17
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 13 13 PART 2 Active Transportation Context Thetis and Millstream The Thetis and Millstream neighbourhood mirrors North Langford and is located on the east side of Millstream Road north of Highway 1, sharing similar transportation patterns, destinations, and land use characteristics. Millstream Village Shopping Centre is the area’s primary attraction, with Thetis Lake Regional Park located to the north and east. The northwest portion of this neighbourhood features an industrial area, along with a planned redevelopment on the former Western Speedway site. The residential area to the east consists mainly of single- family homes, which are connected to the commercial core through bike lanes and sidewalks. Both Thetis and Millstream and North Langford have limited BC Transit service. Residents generally have to travel south of Highway 1 to access service to the rest of the CRD. Mill Hill Mill Hill is the easternmost neighbourhood in the city, nestled between Highway 1 to the north, Veterans Memorial Parkway (VMP) to the west, Colwood to the south, and View Royal to the east. Mill Hill Regional Park stands at the heart of the neighbourhood, summiting above the single-family homes in the area. Small parks are sprinkled throughout the neighbourhood, with minimal commercial amenities nearby. Sidewalks are uncommon within residential areas, making local walking and biking difficult for users of all ages and abilities. Even though it is common for people walking to share the road with people driving, this may not be comfortable for all users. Additionally, connections to adjacent neighbourhoods and commercial attractions can be challenging. Goldstream Meadows The Goldstream Meadows neighbourhood is located between the western border of Langford and Highway 1 to the north. This neighbourhood is predominantly residential, including the new Kettle Creek neighbourhood, and is home to multiple recreational hiking trails south of the Goldstream Provincial Park, general light industrial, and minimal commercial destinations. The area consists of a mix of single-family homes, modular homes, townhome, and multi-family buildings. The older residential areas have a lack of dedicated walking and biking infrastructure, while the newer developments are more connected into the surrounding active transportation infrastructure. 2.1.2 Langford Neighbourhoods Langford is split into nine distinct neighbourhoods, all bringing their own unique contexts, challenges, and opportunities. While the uniqueness of each neighbourhood is recognized, these plans take a city- wide approach for equity and consistency, while creating space for placemaking policy implementation within the public road right-of-way as a separate City initiative. The following sections provide a high-level description of each neighbourhood (from northwest to southeast) as they relate to land-use, traffic destinations, and key connections or access characteristics. Figure 3 illustrates the location of each neighbourhood within Langford. Bear Mountain Located in northwest Langford, Bear Mountain is a master planned resort-style neighbourhood centred on a commercial ‘village’ at the top of the mountain which includes a hotel, two golf courses, a recreation centre, restaurants, and multi-family (condominium) housing. The remainder of the neighbourhood is a mixture of townhouse style multi-family and single-family lots. Most residents travel down the mountain to access groceries and other services daily. Skirt Mountain, located on the southern side of Bear Mountain, is another master planned neighborhood featuring major residential developments. The area currently includes a mix of condominiums, townhouses, and single-family homes. The street network in this area includes steep grades, which serve as a significant barrier to active transportation trips outside of the neighbourhood, although sidewalk and trail connectivity within the neighbourhood is strong. Goldstream Provincial Park is also located within the neighbourhood. North Langford North Langford is located north of Highway 1 and west of Millstream Road. The area is home to several key destinations, including Florence Lake, grocery stores, and multiple big box stores, including Costco and Home Depot, making it an important commercial hub for residents of Langford and the CRD. Most travel to/from this neighbourhood is by private vehicle, with noticeable congestion during peak periods along Millstream Road (off Highway 1) and McCallum Road. The neighbourhood features a large suburban residential area to the west. Painted bike lanes are found throughout the area, linking the residential and commercial areas.
Page 18
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 14 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 14 PART 2 Active Transportation Context Langford Lake and Glen Lake Situated north and east of Westhills, the Langford and Glen Lake neighbourhood provides easy access to major recreational attractions at both lakes and City Centre Park, featuring a bowling alley, mini-golf course, ice rink, and Starlight Stadium with adjacent fields for soccer, football, and rugby. The area also features a variety of commercial businesses, grocery stores, and light industrial buildings along Langford Parkway, one of the major roads through the neighbourhood. Also in this neighbourhood, east of Jacklin Road, are Belmont Market and the West Shore Town Centre, both of which are major shopping centres, plus surrounding big box stores (Superstore, Canadian Tire, etc.) and mid- rise condominiums. While active travel options are available along the major roadways, much of the residential communities have limited access to walk and bike infrastructure. South Langford Located along the south border of Langford, adjacent to Westhills and Glen Lake, South Langford showcases the more rural character of the city. The main roadways in the area are Sooke Road (Highway 14) and Happy Valley Road, which connect into Sooke and Metchosin, respectively. Latoria Roads serves as an east-west connection into Colwood, and acts as the primary access to Olympic View, a master planned resort-style development. General industrial and agricultural land uses are common in the area, with the neighbourhood having the potential to become a major industrial centre through planned business parks. Other areas within South Langford feature large areas of undeveloped land, that are situated between suburban single-family homes and some pockets of more closely spaced homes. The area is also planned for higher-density development through the Sooke Road Revitalization Area. The Galloping Goose Regional Trail is the primary active transportation corridor within the neighbourhood, providing connections to Sooke, Langford, and the rest of the CRD. City Centre Langford’s City Centre is a denser residential area, with a high proportion of apartment and condominium buildings, townhouses, and single-family homes along with ground floor commercial and stand-alone businesses which are easily accessible on foot or by bicycle or transit. There are numerous north-south roads through the City Centre with more limited east-west roads. Key attractions in the area include the John Horgan Campus, the Langford Station Cultural District, and Goldstream Village, plus surrounding big box stores (Walmart, Rona, etc.). The area showcases strong pedestrian infrastructure and connectivity, with bicycle infrastructure provided along most major roadways. The Langford transit exchange is located within the City Centre on Station Avenue and the E&N Rail Trail travels through the middle of the neighbourhood. Westhills Westhills is another master planned neighbourhood with a large mixture of housing types and a planned mixed-use high-rise area that will provide residents access to amenities as well as housing. The high-rise area currently features a transit exchange, the YMCA- YWCA, commercial uses, and access to Langford Lake for swimming. Recreational attractions in the area include Mount Wells Regional Park and the Jordie Lunn Bike Park. One of the major potential corridors serving the neighbourhood is the Island Corridor Foundation (ICF) corridor, which runs along the northern boundary of the neighbourhood. This former rail line is currently being considered for transportation revitalization, including potential rail transit and an extension of the E&N Rail Trail into West Langford. Parts of the neighbourhood have vertical grades that can pose challenges for walking and biking. Well-connected sidewalks and multi-use paths are present throughout the residential communities and are planned for the high-rise area, complemented by on-street painted bicycle infrastructure throughout the community. West Shore Parkway, completed in 2017, provides a direct road connection between Sooke Road and Highway 1.
Page 19
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 15 15 PART 2 Active Transportation Context Figure 3: Langford Neighbourhoods
Page 20
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 16 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 16 PART 2 Active Transportation Context 2.2 Demographic and Household
Summary As of the 2021 Census, the City of Langford had a population of over 46,000 citizens, representing an increase of 31.8% since the 2016 census. When compared to the regional average growth over 5 years of 8.4%, the City of Langford is well-established as one of the most rapidly growing municipalities in British Columbia and Canada. This rapid growth is emphasized by a 34.4% increase in the number of private dwellings from 2016, highlighting Langford’s commitment to residential development. Single-family homes account for only 35.1% of residences in Langford, which is more than 5% lower than the regional average of 40.3% and the provincial average of 42.4%. The city has a larger proportion of townhouses and duplexes compared to the region but falls short when comparing proportions of low- and high-rise apartment buildings. Homeownership in the city has declined 4.8% since 2016, with 64.8% of residents owning their homes. For the remaining 35.2% who are renters, average monthly shelter costs (across all rental types) have risen by 32% since 2016, reaching approximately $1,650 per month in 2021. Meanwhile, the median after-tax household income in Langford sits at $82,000, an 18% increase from 2016. The city’s median age is 38.4 years, which is significantly younger than the regional median of 45.2. The working-age population, including residents aged 15 to 64, accounts for 69.1% of the total population; this demographic is most likely to utilize active transportation infrastructure and is better positioned to transition from single-occupancy vehicles towards alternative modes of transportation. Currently, per the 2022 CRD Origin Destination Household Travel Survey, active transportation mode shares are highest in the 35 to 44 age group.1 1 R.A. Malatest & Associates Ltd & David Kriger Consultants (2022). 2022 CRD Origin-Destination Survey. 2022 Capital Regional District Origin Destination Household Travel Survey. Available online at: https://www.crd.bc.ca/project/regional-transportation/origin-destination-household-travel-survey 2.3 How We Move Today Commuting Patterns According to the 2021 Census, most residents in Langford use a vehicle to commute to work, either as driver or passenger (84.3%). Active transportation (i.e. walking and biking) made up 8.0% of commuter trips, while public transit made up 5.1%. Other modes, such as school bus or taxi, showcased the lowest mode share split (2.6%). Of these commuters, 35.4% of residents work within the City of Langford, while the remaining 64.6% are employed outside the city limits. This indicates that there is a strong potential for active transportation commuting within the City of Langford, while improved regional trail connections and transit options could better serve out-of-town commuters. Almost 70% of commutes for City of Langford residents are less than 30 minutes, which increases to 92% for commutes less than 45 minutes. The most common time to leave for work is between 6AM and 8AM (46%).
Page 21
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 17 17 PART 2 Active Transportation Context Figure 4: Langford Mode Split by Travel Mode (2022) Most trips out of the city in the AM peak period are commuters destined for Colwood, Saanich, Esquimalt, and Downtown Victoria. Most trips entering the city originate from Colwood, Sooke, Saanich East and View Royal. A significant portion of all trips to/from Langford are either auto drivers or passengers at approximately 89%, which decreases to 75% for trips within the city. Given that approximately half of all daily trips originating in Langford remain local, there is a significant opportunity to incentivize a mode split shift from motor vehicles towards sustainable modes of transportation such as transit, walking, and bicycling. Table 2: Daily Trips by Travel Mode From, To, and Within Langford Travel Patterns The 2022 CRD Origin Destination Household Travel Survey provides data on resident travel patterns throughout the Capital Regional District. The survey reported that approximately 164,870 trips are made in Langford on a typical weekday. Of those trips, 33% are within the city, while the remaining 67% are going to or coming from other municipalities. Figure 4 provides a summary of the mode split for all trips taken to, from, and within the City of Langford. A summary of Langford’s mode share trends from the CRD’s 2021 Origin-Destination Household Travel Survey are as follows: • Vehicle (and passenger in vehicle) mode share is the highest among all modes, but is noticeably lower for trips within the city • Transit mode share is steady for trips to and from Langford, but low for trips within the city • Bicycle and micromobility mode share is consistent at 3% for all travel destinations (to/from/within the city) • Walking rates are substantially higher for trips within the city at 17%, which is tied for second highest mode share after ‘auto driver’ Table 2 summarizes Langford residents’ overall daily trips to from, and within Langford by mode. Mode From City To City Within City Auto Driver 38,100 (69%) 38,180 (69%) 31,950 (58%) Auto Passenger 10,540 (19%) 10,780 (20%) 9,410 (17%) Transit 2,600 (5%) 2,550 (5%) 800 (1%) Bicycle and Micromobility 1,570 (3%) 1,460 (3%) 1,630 (3%) Pedestrian 580 (1%) 600 (1%) 9,220 (17%) Other 1,580 (3%) 1,470 (3%) 1,830 (3%) Total 54,970 55,060 54,840
Page 22
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 18 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 18 PART 2 Active Transportation Context Active Transportation and Mode Split Trends As shown in Table 3, walking, biking, and micromobility trips have increased between 2011 and 2022 based on the CRD Origin Destination Household Travel Survey. Active transportation has been growing both within the city and for trips outside of the city. Despite these increases in active transportation mode share, household car ownership in Langford has remained consistent since 2017 at 1.78 cars per household, a slight decrease from the 2011 benchmark of 1.96. Household bicycle ownership has risen from 1.17 to 1.32 between 2017 to 2022. Additionally, Langford has one of the highest percentages of households with at least one e-micromobility device in the entire CRD (3.7%). The average number of daily total trips per household has declined steadily, dropping from 7.13 in 2011 to 6.18 in 2017, and further to 5.42 in 2022. This trend could be attributed to the rise of remote work technologies, increased access to food delivery services and online shopping, increased awareness of climate change, and general increase in cost of living (including car ownership). The following describes the mode split trends for Langford compared to other municipalities in the Capital Regional District, for trips that take place within each municipality: • Langford’s automobile mode share is the highest of the largest municipalities (Victoria, Saanich), and higher than the neighbouring communities (View Royal, Metchosin, and Colwood). • At only 1% of trips, transit use within Langford is very low, which is consistent with communities in the West Shore but significantly lower than the ‘Core’ (which includes Esquimalt, Saanich, Oak Bay, and Victoria) region (8%). • Langford is on par with the bicycle and micromobility mode share in the West Shore region (3%) but is lower than Colwood (8%) and the ‘Core’ area average (11%). • Langford’s walking mode share within the city (17%) is comparable to Saanich (18%), Colwood (21%), and View Royal (23%). Victoria features the highest walk mode share in the region at 42%. Year Active Mode Share % (Walk, Bike, Micromobility) From City To City Within City Overall 2011 6.60% 6.10% 13.80% 8.60% 2017 9.40% 8.30% 17.40% 11.60% 2022 8.60% 8.40% 21.20% 12.70% Table 3: Walking, Bicycling, and Micromobility Mode Share 2011-2022
Page 23
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 19 19 PART 2 Active Transportation Context 2.4 Emerging Transportation Trends New technologies and systems are transforming transportation by disrupting the status quo and reshaping how we plan our transportation networks. Over the past decade, advances in technology and shifts in social behaviour have led to the emergence of numerous new mobility options. These innovations offer potential greater convenience and may encourage people to move away from personal vehicle ownership, thereby reducing dependency on automobiles. At the same time, these innovations may also lead to increased driving, particularly for optional trips, as improved convenience can encourage more frequent or longer travel. This is consistent with the concept of induced demand, where increased ease or capacity of travel can result in higher overall use. Examples of new mobility options across North America include carsharing services (e.g., Evo, Modo), ride-hailing platforms (e.g., Uber, Lyft), micromobility vehicles (e.g., e-bikes, e-scooters), shared micromobility programs (e.g., Evolve, Lime). Additionally, there has been significant interest and progress in the electrification of transportation, spanning from electric vehicles to e-bikes and e-scooters. These modes can reduce greenhouse gas (GHG) emissions, provided they do not lead to increased overall vehicle use; this risk can be mitigated through proactive reallocation of space to support other mobility options. Together, these innovations are transforming how people move and must be considered when planning future transportation networks. As new transportation trends continue to emerge, it is essential to continuously monitor and adapt policies and elements of the transportation network to ensure safe mobility is prioritized for all users, providing residents of Langford with improved mobility choices. Micromobility As defined in the Streets and Traffic Bylaw No. 2233, a micromobility device includes, but is not limited to, electric kick scooters, electric skateboards, hoverboards, and segways, but does not include skateboards, push scooters, bicycles, electric bicycles, wheelchairs or electric wheelchairs, or other similar devices used as mobility aids for persons with accessibility requirements. More broadly, the term micromobility is commonly used to describe a wide range of small, lightweight transportation devices used primarily for short-distance travel. These include many forms of non-motorized travel, such as bicycles, scooters, and skateboards, but also include electric-assist devices, including e-bikes or e-scooters. Collectively, these modes typically operate at lower speeds than motor vehicles². Shared Active Transportation Shared active transportation programs provide a way to support micromobility without focusing on individual ownership. Bike or scooter share programs allow users to rent a device for a short period, offering a flexible transportation option. The City of Langford currently operates an e-bike and e-scooter sharing program, offering residents a sustainable alternative for active travel around the city. The initial phase of the program featured over 150 e-scooters and e-bikes, which are accessible through a mobile app. The fleet is planned to expand in subsequent phases. The dockless system features ‘home zones’ where devices are parked, typically located adjacent to bike racks. E-Scooter Docking Station (City of Langford) 2 Hassanpour, A., & Bigazzi, A. (2024). Operating Speed Distributions in off- street cycling facilities by vehicle type and motorization. Journal of Cycling and Micromobility Research, 2, 100021. Available online at: https://doi.org/10.1016/j. jcmr.2024.100021 E-Scooter Navigating the Millstream / McCallum Intersection
Page 24
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 20 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 20 PART 2 Active Transportation Context 2.5 Land Use and Key Destinations Identifying the various land uses and key destinations around Langford helps to understand the neighbourhoods and areas that generate and attract the most trips by various modes. By investigating the geographic distribution of these land uses and key destinations, travel patterns can be estimated. This enables the identification and prioritization of locations best suited for active travel modes, such as walking and biking, which are better suited for short distance trips. These areas, with the most potential, can then be targeted for infrastructure investments that support active transportation use. Commercial Hubs Commercial land uses are spread around Langford, with pockets of high-density destinations focused around the City Centre at the Goldstream Village and West Shore Town Centre / Belmont Market areas, and in the north around Millstream Village Shopping Centre and Costco / Home Depot. A future high-rise mixed-use commercial hub is planned for Westhills. As shown in Figure 5, Goldstream Village provides the highest density commercial destinations, with a variety of retail stores, cafes, restaurants, banks, and other services. These commercial hubs tend to be well-connected by basic active transportation infrastructure, such as painted on- street bike lanes and sidewalks. However, this infrastructure currently do not meet an all ages and abilities standard, which may discourage people from choosing active transportation modes. Employment Hubs Employment hubs are significant generators of trips. Morning traffic in Langford moves in both directions: 61% of trips that begin in the city head elsewhere in the region, while 42% of trips into Langford come from outside the city. In addition to the previously mentioned commercial hubs, which also serve as major employment centres, other key locations include SD62 schools, the John Horgan Campus, the Westshore Urgent Care Centre, the YMCA-YWCA, City Centre Park, and Bear Mountain Resort just to name a few. Industrial areas also create employment centres, with hotspots in South Langford and west of Langford Lake. These areas host industrial destinations like automobile sales, building material suppliers, and shipping services. However, due to the need to transport work equipment and materials and lack of active transportation infrastructure connecting into these sites, motor vehicle use is often the primary mode of commuting to and from these areas. Education / Child Care Schools and educational / childcare facilities generate a significant number of trips and should be prioritized in the active transportation network as they tend to be close to where students live. If these routes are not comfortable or accessible for all ages and abilities, parents will continue to drive their children to school. The list of schools in Langford are provided below: • Ruth King Elementary • Crystal View Elementary • Millstream Elementary • Willway Elementary • Lakewood Elementary • PEXSISEṈ Elementary • Savory Elementary • SĆIȺNEW̱ SṮEȽIṮḴEȽ Elementary • Spencer Middle • Centre Mountain Lellum Middle • QELEṈSEN Á, LEṈ Secondary • Belmont Secondary • Brookes Westshore (Private) • Lighthouse Christian Academy (Private)
Page 25
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 21 21 PART 2 Active Transportation Context Figure 5: Langford Trip Generators
Page 26
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 22 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 22 PART 2 Active Transportation Context The Langford Station Cultural District Recreation The City of Langford is home to a number of recreational destinations and activities. The City of Langford hosts various facilities and programs including access to weight rooms, swimming pools, playing fields, playgrounds, and more. For those interested in a more natural recreation activity, Langford is home to over 2,400 acres of green space and parks to explore, and the lakes are key attractions for swimming, boating, and fishing for locals and visitors of the region. Additionally, Langford provides facilities for Rugby Canada, Pacific Football Club, and the Westshore Rebels, providing residents and visitors with plenty of live sports entertainment. Some of the recreational attractions and facilities include: • Starlight Stadium • City Centre Park • Eagle Ridge Community Centre • Jordie Lunn Bike Park • Westhills YMCA-YWCA • Bear Mountain Resort Community and Activity Centre • Goldstream Provincial Park • Mill Hill Regional Park • Lakes:
− Langford
− Glen
− Florence The Galloping Goose Regional Trail and E&N Rail Trail provide excellent regional active transportation routes, providing efficient recreational and commuter use for people who enjoy cycling, rolling, and walking. With many parks and key recreational attractions in close proximity to the pathways, these trails play a vital role in providing active connections throughout the city. Culture Langford’s Cultural District is located at Langford Station, highlighting local artists, retailers, murals, sculptures, food trucks, live music, events, and more that draw a large number of people. There are several additional venues which may host cultural events within Langford. These venues include, but are not limited to, the following: • Luxton Fairgrounds • Goldstream Avenue • Isabelle Reader Theater • Starlight Stadium • Veterans Memorial Park • Langford Public Library • Victoria Conservatory of Music • Eagle Ridge Community Centre
Page 27
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 23 23 PART 2 Active Transportation Context 2.6 Overview of Active
Transportation Today As of 2022, active transportation in Langford, comprised of walking, cycling, and other micromobility modes, accounts for a growing share of daily trips, reflecting increasing interest in sustainable and health-focused travel options. 2.6.1 Walking and Rolling Walking makes up the largest share of active travel in Langford, creating an opportunity to improve walking and rolling infrastructure and encourage greater use of the community’s already strong active transportation network. However, due to the city’s size, topography, and development patterns, walking for utilitarian or commuting purposes remains challenging for many residents. Despite these limitations, Langford boasts an array of recreational walking opportunities that are connected through a mix of multi-use trails, local pathways, and sidewalk networks, drawing regular use from residents of all ages. One of the key challenges will be to rapidly expand the transportation-related walking infrastructure that connects origins and destinations, as these connections are essential to achieving mode shift goals. To increase the walking and rolling mode share, the City is committed to improving the safety, comfort, and accessibility of its pedestrian infrastructure as well as better integrating land use with transportation infrastructure. In general, the city’s pedestrian network objectives include: • Enhancing infrastructure quality to support people of all ages and abilities; • Improving connections between neighbourhoods, schools, commercial areas, and transit; and • Eliminating barriers such as missing sidewalks, unsafe intersections, and limited accessibility features. Although the City has been building and implementing sidewalks, crosswalks, and trails throughout Langford annually, many challenges remain, including sidewalk gaps, especially in older established neighbourhoods, limited accessibility features at intersections, and poor connectivity across major roads and highways. A detailed review of these barriers to walking is provided in the next section. Existing pedestrian infrastructure types found around Langford include: • Multi-use pathways – a paved or compacted gravel route that is either buffered (separated) from the roadway or within its own right-of-way, providing pedestrians, bicyclists, and other micromobility users with dedicated infrastructure that is separated from motor vehicle traffic. • Local Trails and Boardwalks – typically found in parks or natural areas, this infrastructure is generally unpaved and are shared by pedestrians and other active transportation users. These trails can vary in width and are typically utilized for exercise, leisure, and exploration, providing a scenic space for outdoor activities. • Sidewalks – either separated (with a landscaped buffer) or unseparated (directly adjacent to the roadway), sidewalks create the foundation of any pedestrian network and provide a curb-protected space for pedestrians to navigate away from vehicle traffic. • Pathway Connectors – short, pedestrian-focused routes that link existing sidewalks, trails, or paths, creating an accessible ‘short-cut’ connection between different areas. These tend to be between different neighbourhoods or cul-de-sac areas. • Shoulders – paved spaces on the side of a roadway, delineated from vehicle traffic by a white longitudinal pavement marking (shoulder or ‘fog’ line). This infrastructure are typically found in rural contexts and are not considered formal pedestrian infrastructure. A breakdown of the existing pedestrian infrastructure around Langford is provided in Table 4. Table 4: Existing Pedestrian Network Inventory Type Length (km) Percentage Multi-use pathways 15.5 9% Local Trails and Boardwalks 33.6 19% Sidewalks 124.1 70% Pathway Connectors 3.2 2% Total 159.1 100% Updated as of July 2026
Page 28
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 24 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 24 PART 2 Active Transportation Context E&N Rail Trail Ed Nixon Local Trail and Boardwalk Separated Sidewalk at on Millstream Road near Millstream Village Galloping Goose Regional Trail Peatt Road Trail Connector
Page 29
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 25 25 PART 2 Active Transportation Context 2.6.2 Cycling and Micromobility While still a relatively small share of daily trips, cycling and micromobility are on the rise in Langford, and are considered a key strategic opportunity that is entirely dependent on providing the right supporting infrastructure. The 2% increase since 2017 reflects growing investments in bike infrastructure, increased access to e-bikes and other electric-assist devices, and a cultural shift toward healthier, more sustainable travel options. In general, the term micromobility refers broadly to both non- motorized and electric personal modes of travel, such as: • Bicycles and e-bikes • Scooters and e-scooters • Skateboards and other small, light personal vehicles Bicycles and micromobility offer efficient and flexible alternatives to driving, particularly for trips that are too long to walk but still within Langford. Improving access to high- quality bike and micromobility routes can help supports a reduction car dependence. In general, the city’s cycling and micromobility network objectives are to: • Significantly and rapidly expand protected and comfortable infrastructure for riders of all ages and abilities • Integrate new infrastructure with existing trails and roads • Improve safety and convenience through connected, direct, and intuitive routes As with walking, barriers to cycling and micromobility, such as disconnected paths, conflicts with pedestrians, and lack of end-of-trip amenities, must be addressed to make micromobility a more viable and attractive option for daily travel. The existing cycling network in Langford is defined by three main types of cycling infrastructure, including: • Painted and Buffered Bike Lanes – a designated lane for exclusive use by bicycles or micromobility devices. Located at grade with the vehicle travel lane, these lanes are marked by a painted white line and bicycle stencil, and may include a painted buffer zone. • Protected Bike Lanes – dedicated infrastructure for exclusive use of bicycles and other forms of micromobility. These lanes are physically protected and/or separated from motor vehicles by vertical or horizontal elements including concrete curbs, flexible bollards, or planters. • Multi-use Pathways – a paved or compacted gravel route that is either buffered from the roadway or within its own right-of-way, providing pedestrians, bicyclists, and other micromobility users with dedicated infrastructure that is separate from motor vehicle traffic. A breakdown of the existing cycling infrastructure around Langford is provided in Table 5. Table 5: Existing Cycling Network Inventory Type Length (km) Percentage Shoulder 25.3 16.9% Painted and Buffered Bike Lane 101.7 68% Protected Bike Lane 0.4 0.2% Multi-use Pathway 22.1 14.8% Total 149.5 100%
Page 30
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 26 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 26 PART 2 Active Transportation Context Buffered and Painted Bike Lanes On-Street Barrier-Protected Bike Lane and Bike Lane with Flexible Delineators Hull’s Trail Multi-use Pathway
Page 31
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 27 27 PART 2 Active Transportation Context 2.7 Summary of Key Barriers to
Active Transportation Identifying barriers to active transportation is an important step in understanding why many trips that could reasonably be made by walking, rolling, or cycling are instead made by private vehicle. Recognizing these challenges helps inform investments and improvements that support safety, accessibility, connectivity, and progress toward mode shift goals. Despite being relatively walkable, Langford faces persistent challenges that make walking and rolling challenging for many residents. Typical barriers to walking in a growing city include missing or inadequate infrastructure, poor accessibility at intersections, sidewalk gaps near schools, insufficient lighting, and topographical challenges such as steep or uneven terrain. These issues particularly affect children, seniors, individuals with mobility or visual impairments, and those without access to vehicles, ultimately reducing the appeal and practicality of active transportation as a mode of travel. As for cycling and rolling, Langford benefits from having a strong core of ‘All Ages and Abilities’ regional multi- use pathways in the E&N Rail Trail and the Galloping Goose Regional Trail. However, these routes alone do not provide sufficient connectivity between many origins and destinations to support a substantial mode shift to cycling and rolling. Achieving this will require significant expansion of active transportation-focused, protected infrastructure. The general fragmentation of the network and lack of protected infrastructure is a recurring issue throughout the city, with the design and type of cycling infrastructure being inconsistent. This inconsistency creates gaps in the network, making it challenging for active transportation users to navigate safely and comfortably. Another predominant barrier in the network is the relationship between on-street bicycle lanes and on- street parking, which often lack adequate buffer space which creates higher collision risks between bicyclists and drivers. Multi-use pathway and bicycle infrastructure crossings at intersections also present significant challenges, as inconsistent treatments and inadequate safety measures further reduce comfort and connectivity for cyclists around Langford. A summary of the key challenges for active transportation in Langford is provided in Table 6.
Page 32
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 28 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 28 PART 2 Active Transportation Context Category Barrier Type Description / Examples Impact Sidewalk Network Gaps Discontinuous or Missing Sidewalks Meaford Avenue, Latoria Road, Bellamy Road Residential areas citywide Walking on shoulders or roads; uncomfortable and inconvenient walking routes Temporary Gaps due to Construction Closed sidewalks in construction zones in front of new developments Unpredictable detours; reduced comfort and continuity for pedestrians Bike Lane Network Gaps Discontinuous Bicycle Infrastructure E&N Rail Trail ends at Jacklin Road Dunford Avenue Buffered Bike Lanes Protected Bike Lanes on Goldstream Avenue Forces dismounting or sharing roads with traffic; discourages vulnerable users and micromobility use On-Street Bike Lanes Abruptly Ending Langford Parkway, Leigh Road, Peatt Road, Happy Valley Road Disrupts continuity; deters vulnerable users Lack of AAA Infrastructure and Network Many roads exceed BCATDG thresholds for painted lanes (e.g., Jacklin Road, Peatt Road, Leigh Road) Inaccessible for less confident users; inconsistent with best practice standards Dismount and Walk Signage Found at trail crossings and busy intersections (e.g., Kelly Road/Galloping Goose) Disrupts trip flow; discouraging for micromobility users Micromobility User and Parking Conflicts Painted Bike Lanes Next to On-Street Parking Goldstream Avenue (angled and parallel parking) Bear Mountain Parkway (parallel) Spencer Middle School (perpendicular parking) High “dooring” risk (where a vehicle door is opened into the path of a cyclist); poor visibility; high risk for cyclists or micromobility users Table 6: Langford Active Transportation Barriers
Page 33
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 29 29 PART 2 Active Transportation Context Category Barrier Type Description / Examples Impact Intersection Accessibility Deficient Curb Ramps Goldstream Road / Peatt Road, Langford Parkway/ Phipps Road and along Leigh Road Combined ramps create angled entries that don’t align crosswalk pavement markings
- lacks universal access for mobility devices and people with visual impairments Missing Score Lines Sidewalks in City Centre lack directional grooves Poor wayfinding for visually impaired pedestrians Lack of Tactile Walking Surface Indicator (TWSIs) Missing at most intersections Navigation hazard for blind/ low-vision users Lack of Audible Pedestrian Signals Present at major intersections only Barrier for blind/low vision pedestrians Insufficient Pedestrian Clearance Time Higher walking speeds (1.2m/s) may still be in place at some older signals Inadequate for children, elderly, or mobility-impaired users Lack of Leading Pedestrian Intervals (LPIs) Currently installed at Jacklin Road/Terlane Avenue and Leigh Road/Langford Parkway Increased vehicle-pedestrian conflict risks; reduced pedestrian visibility Channelized Right Turn Conflicts with Pedestrian Crossings VMP, Millstream Road, Sooke Road intersections High-speed vehicle turns, small islands; unsafe waiting areas
Page 34
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 30 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 30 PART 2 Active Transportation Context Category Barrier Type Description / Examples Impact Trail and Pedestrian Crossings Inconvenient Trail Crossings E&N Rail Trail at Peatt Road Galloping Goose at Glen Lake Road / Happy Valley Road / Sooke Road Requires dismounting or shoulder walking; multi-stage crossings reduce convenience Insufficient Waiting Areas (Channelized Right Islands) at Crossings Channelized right turn islands are too small for multiple or large bikes Crowding, conflict risk, and discomfort Physical Constraints Steep Grades / Topography Bear Mountain, Goldstream Meadows, Westhills Physically demanding; discourages walking, cycling or rolling Provincial Highway Barriers Highway 1, Highway 14 cut between neighborhoods Disconnects communities; psychological and physical barriers Lighting and Safety Poor Lighting Atkins Road, Goldstream Meadows Reduces nighttime visibility and safety; deters walking School Area Barriers Conflicts at Pick-Up/ Drop-Off Zones Spencer Middle School, Willway Elementary Vehicle crossing over bike lanes; unsafe for youth walking/cycling Disconnected or Inadequate Active Transportation Infrastructure to Schools Millstream, Lakewood, Willway Elementary lack sidewalks Most Schools lack AAA bicycle infrastructure Lack of separated sidewalks, safe crosswalks, and/or AAA bike infrastructure for children to safely commute to school
Page 35
PART 3 Community Engagement
Page 36
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 32 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 32 PART 3 Community Engagement Both the TMP and ATP would not have been complete without the valuable input received from the Langford community. As both plans were undertaken simultaneously, one engagement process was facilitated to maximize input on the TMP and ATP. There were two rounds of engagement held over the 20-month project process, summarized as follows: • Through the Round 1 engagement process, the community was invited to share their ideas, insights, and general preferences for what they wanted to see in their future transportation network. The community had a chance to learn about both the TMP and ATP, share their detailed feedback on the key barriers they experience using transportation today, and outline opportunities for the improvements that should be considered in both plan documents. • Round 2 engagement was focused on inviting the community back to share their feedback on the vision, plan objectives, and overall recommendations in the draft TMP and ATP. The feedback heard through this round helped refine, strengthen, and prioritize the recommendations in both plans. The following sections outline the specific engagement activities that were undertaken in both rounds of engagement, followed by a summary of what we heard. 3.1 Overview Community Engagement 3.2 How We Engaged The Langford community was invited to participate in the engagement process through a combination of online and in-person activities. 3.2.1 Round 1 Engagement Ideas Fair #1 To kick off the engagement process for both plans, an ‘Ideas Fair’ was held at the Langford Legion on Saturday, March 15, 2025 from 11am to 2pm. Event attendance was approximately 150 people. This was a family-friendly event for all ages that included multiple engagement opportunities, including: • Informational and interactive poster boards were presented during the Ideas Fair to provide attendees with information on existing infrastructure and to gather feedback using sticky notes and dots, to share their transportation experiences and challenges. • “Map It” activity where people identified places in Langford that work well; that are more problematic; and general ideas and aspirations. • “Be a Transportation Engineer for a Day” involved participants deciding where to place five tokens (representing a limited ‘budget’) in jars that were their biggest priority. • Children’s drawing station A drawing station for children was set up to allow youth to share their often underrepresented perspectives in a fun and creative way. Ideas Fair #1
Page 37
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 33 33 PART 3 Community Engagement Online Survey #1 To extend the reach of the Ideas Fair, an online survey was launched on the City’s Let’s Chat Langford website and was live from March 13 to April 9, 2025. A total of 375 responses were received. Survey respondents were asked about their current travel patterns, mobility challenges, and desired improvements to Langford’s transportation infrastructure. Interviews with Hard-to-Reach and Equity Seeking Groups Interviews were conducted with organizations that work with, serve, or advocate for hard-to-reach and equity- seeking communities. These conversations helped identify transportation challenges and opportunities specific to diverse people and interests in Langford. The groups interviewed include urban Indigenous people; children and youth, including at-risk youth; older seniors; persons with disabilities; newcomers; and people living in poverty or with low incomes. 3.2.2 Round 2 Engagement Interest Holder Workshop As part of the second round of engagement, on September 18th, 2025, an interest holder workshop was held with neighbouring municipalities, the Ministry of Transportation and Transit, CRD, Island Corridor Foundation, and BC Transit to gather feedback on the proposed infrastructure improvements and connections for Langford’s road and active transportation network. Email Feedback from the Community As part of the second round of engagement, the City received 122 emails from members of the community about the proposed recommendations in the TMP and ATP. The feedback was reviewed in detail and informed the changes that were made to the plan framework, active transportation network, and the street network— particularly the feedback concerning the proposed changes to the VMP and Peatt Road / Strandlund Avenue intersection. Round 1 Engagement: At a Glance 111 1,600 total visits to the project website 150+ Ideas Fair attendees 375 survey responses 12 interviews with community organizations community-mapped points of interest LetsChatLangford.ca/Transportation
Page 38
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 34 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 34 PART 3 Community Engagement Ideas Fair #2 (Plan your Network) A second Ideas Fair was held with the Langford community at the RRU John Horgan campus on October 18, 2025. The event included a mix of interactive engagement activities to help the community better understand and contextualize the recommendations. The event featured informational poster boards, a “Making it Work” interactive activity of the Peatt Road Transit Corridor concept, and “Next Stop: Priorities”, which featured a voting system using three tokens for attendees to provide feedback on what projects should be prioritized. The second Ideas Fair also included a bike tour, where participants had a chance to ride around Langford using a shared e-bike and/or their own bike to point out areas where the existing network could be improved, draft recommendations and solutions that are being explored. Online Survey #2 A second online survey was launched to gather feedback on the draft plan vision, objectives, and key recommendations. The survey was open from October 29 to November 21, 2025, and received 1,333 responses. Meeting with Capital West Accessibility Advisory Committee The project team also attended a meeting with the Capital West Accessibility Advisory Committee (CWAAC) on Wednesday November 27, 2025. The purpose of attending the meeting was to provide an update on the City’s existing transportation plans and initiatives (e.g., TMP, ATP, and Downtown On-street Parking Strategy) and how accessibility is being considered in each of those plans. The CWAAC was specifically asked to provide feedback on the following topics: • Tactile Walking Surface Indicators • Audible Pedestrian Signs, Push Buttons, and Leading Pedestrian Interval • On-street Accessible Parking A summary of the CWAAC feedback is provided in Section 5.7 of the ATP (Crossings and Accessibility). Ideas Fair #2
Page 39
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 35 35 PART 3 Community Engagement 3.3 What We Heard A high-level summary of what we heard in the first round of engagement is presented below. The summary includes findings that are specific to the barriers and challenges that Langford residents experience using different transportation modes. Sections 4 to 6 include findings from the second round of engagement. 3.3.1 Driving When asked about challenges and barriers in the street network today, participants identified the following: • Significant vehicle traffic congestion during peak hours • Issues with sightlines (at Galloping Goose trail crossings) • Faded street markings • Narrow driving lanes • Difficulties turning right when protected bike lanes are present • Poorly timed traffic signals • Not enough traffic- and speed-calming measures • Difficulty finding parking downtown and in busy areas 3.3.2 Transit When asked about what would encourage them to use public transit more, participants identified the following: • Frequent and reliable service • Routes near where residents live 3.3.3 Walking and Mobility Devices When asked about challenges and barriers in the pedestrian network today, participants identified the following: • A lack of crosswalks (especially near the highway) • Worn and inconsistent pathways (no sidewalk between Leigh Road and the City Centre Park roundabout) • Poorly-lit sidewalks and crosswalks • Inaccessible design (narrow paths; insufficient walking time at crosswalks; gate barriers on E&N Rail Trail at Station-Dunford pose a barrier for wheelchair users) • Poor connections to destinations, and feelings of discomfort due to high vehicle speeds and drivers ignoring road signs. 3.3.4 Cycling When asked about challenges and barriers in the cycling network today, participants identified the following: • A need for more bike lanes (especially protected lanes) • A lack of safe north-south bike paths • Unsafe crossings (such as near the Millstream overpass) • Bike path discontinuity • Insufficient bike path connections to other communities • A lack of secure bike parking and/or valet services at destinations • Unsafe bike routes to and around schools
Page 40
PART 4 Plan Framework
Page 41
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 37 37 PART 4 Plan Framework Plan Framework As outlined in the OCP, Langford envisions a connected, safe, and inclusive active transportation network that prioritizes human-powered modes — walking, rolling, and cycling — as convenient, comfortable, and preferred forms of travel. A strategic framework is essential for the TMP and ATP because it provides clear direction, structure, and alignment with broader community goals. It helps define a shared vision, prioritize investments, and guide decision- making to ensure resources are used effectively. By integrating land use and transportation planning, the framework supports a connected, accessible, and sustainable network. It also facilitates consistent public and stakeholder engagement, aligns with funding opportunities, and establishes performance metrics to track progress. Ultimately, a strategic framework ensures the TMP and ATP are actionable, adaptable, and reflective of Langford’s long-term mobility and sustainability objectives. WHAT WE HEARD FROM THE COMMUNITY A total of 1,313 residents responded to question about the proposed vision statement in online survey no. 2. About 32% of survey respondents indicated that the vision statement aligns with what they would like Langford’s transportation system to look like going forward. This compares to 31% who said it does not align with their vision, and 27% who are unsure. Those more supportive of the vision statement indicated that they like how the future transportation system needs to consider multiple transportation options and not just cars. Those against it indicated that Langford has and will continue to be a car- oriented community and that the transportation system needs to be designed to support that reality. Vision Statement Langford is a community of evolving mobility choices. Transportation and land use are interwoven and work together to create a connected, multi-modal transportation system that is climate resilient and accessible to all ages and abilities. Greater mobility choices will result in a more efficient transportation system for all.
Page 42
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 38 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 38 PART 4 Plan Framework The TMP and ATP are guided by five strategic objectives that reflect the City’s vision. Each objective includes clear, measurable targets that support OCP goals and guides implementation. The targets are intended to be achieved by the time Langford achieves a population of 100,000 people, which could occur within the next 15 to 20 years based on past projections. However, some targets may be achieved faster than that depending on the progress of implementation for the projects identified within the plans. A description of each objective is provided below, along with some example targets that can guide implementation monitoring. Plan Objectives Plan Objective Targets Integrate land use planning with transportation planning. By taking a holistic approach to planning in the City of Langford, the connection between land use and transportation can be prioritized. This approach can help shorten travel distances and reduce congestion, while also promoting sustainable transportation choices such as walking, cycling, and transit – ultimately fostering more vibrant and accessible communities.
• Ensure all areas of Langford’s City Centre and Urban Centers have a Walk Score of 70 or higher. • Achieve 42% of all trips made by walking, rolling, cycling, and/or public transit. Design the transportation network to provide safe mobility options and general accessibility that serve all ages and abilities. Creating a safe, accessible, and reliable active transportation network for people of all ages and abilities is critical for providing residents of Langford with mobility choice. • Zero serious injuries and/or fatalities for those who use active transportation modes. • All intersections and roundabouts within the City Centre are retrofitted with accessibility improvements. Develop a transit network that emphasizes ridership in collaboration with our key partners. Transit will play a key role in achieving a 42% mode share for the City of Langford. Prioritizing improved ridership, service levels, and reliability will encourage transit use, while upgrading infrastructure will make first- and last-mile connections safer and more comfortable for pedestrians. • Double transit ridership from the 6,500 average daily riders that Langford sees today. • In partnership with BC Transit, provide at least two Rapid Transit routes serving Langford residents. • All bus stops are designed for accessibility that meet BC Transit’s Infrastructure Design Guidelines.
Page 43
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 39 39 PART 4 Plan Framework WHAT WE HEARD FROM THE COMMUNITY About 35% of survey respondents from online survey no. 2 indicated that the draft objectives cover what is important to them compared to 25% who said it does not, and 33% who are unsure. The key themes from this survey are summarized as follows: • Overall, the objectives are balanced recognizing Langford’s multiple competing priorities. • Some feel that the objectives do not stress the importance of improving / enhancing existing infrastructure such as roads and traffic signals, which require greater attention now. • Strong support for Objective #5 (Maximize the economic productivity of the transportation system by emphasizing movement and efficiency), recognizing that vehicle movement has and will continue to be a high priority for Langford residents and businesses. Plan Objective Targets Minimize the climate impact of the transportation network. As a major source of greenhouse gas emissions, transportation is central to a successful climate action strategy. Reducing the climate impact of the transportation network requires prioritizing sustainable, low-emission modes of travel, which may include electric vehicles or active transportation. • Achieve 42% of all trips made by walking, rolling, cycling, and/or public transit. • Provide electric vehicle charging stations in all major commercial, institutional, and recreational parking lots. • Reduce the City’s corporate emissions by 50% by 2030; achieve net zero by 2050. Maximize the economic productivity of the transportation system by emphasizing movement and efficiency. The efficient movement of people and goods is vital to the economic productivity of the transportation network. By reducing delays and providing convenient, reliable routes for trucks and other vehicles, the system supports local businesses, trade, and overall economic growth. • Provide at least one general loading stall for each block in the City Centre. • Achieve an overall reduction in vehicle delay at the intersections for the city’s major corridors. • Achieve an average year-by-year increase of 2% for pedestrian traffic within the City Centre.
Page 44
PART 5 Future Active Transportation Network
Page 45
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 41 41 PART 5 Future Active Transportation Network Future Active Transportation Network This ATP presents a future network that supports walking, rolling, and cycling for people of all ages and abilities (AAA) within the City of Langford with a population of 100,000 people. By prioritizing connectivity, comfort, and safety, the future network makes active transportation a practical and appealing mobility option—and ultimately provides mobility choice. The future pedestrian network builds on the city’s generally well-connected sidewalks, while addressing gaps in rural and established areas, providing access to new developments, and filling other missing links. Accessibility improvements are also prioritized to create an environment that is inclusive and universally accessible for all. The future cycling network aims to improve north-south connections in Langford by establishing a central AAA cycling corridor that serves as the primary route through the city. This main north-south corridor is complemented by AAA branches providing east-west connections. The network is anchored by a new active transportation overpass connection across Highway 1, creating a significant multi-use link that bridges one of the major barriers in the network. Both the future pedestrian and cycling networks are supported by the city’s strong foundation of regional trails: the Galloping Goose and the E&N Rail Trail. These proposed networks build on these multi-use pathways as primary corridors for active travel, while adding new AAA connections that integrate seamlessly with the existing routes. 5.1 Overview This plan adds sidewalks along more than 34 km of roadway to address existing gaps as Langford continues to grow. Some of the proposed sidewalks will be constructed in conjunction with new developments and road connections. Other sidewalk infill upgrades will follow the City’s Sidewalk Infill Matrix, which scores and prioritizes infill projects based on factors such as proximity to schools, transit, parks, and town centres, as well as safety and road classification. Additional considerations for prioritizing sidewalk infill upgrades are related to development and frontage improvements, feedback from residents and businesses, and the presence of existing sidewalks on adjacent properties. The long-term walking and rolling network is shown in Figure 6. The long-term network aims to enhance connectivity across Langford, particularly linking residential neighbourhoods with schools, commercial hubs, recreational facilities, and other key destinations. Key projects include improved sidewalk connectivity in Thetis Heights, Langford Lake, Mill Hill, and along Latoria Road. While most of the future network will be delivered through new sidewalk installations, the multi-use pathway and regional trail network also plays a critical role in the walking and rolling network, which is discussed in more detail in Section 5.4. The different types of sidewalk infrastructure are presented in Table 7. Where possible, sidewalks are recommended to be fully separated from motor vehicle traffic with a landscaped buffer, including street trees where appropriate. Sidewalks should be provided on both sides of the roadway, but may be considered on only one side of the road in areas with significant right-of-way restrictions. On low-speed local roads within residential neighbourhoods, supporting infrastructure such as non-separated sidewalks may be provided depending on available right-of-way. 5.2 Walking and Rolling
WHAT WE HEARD FROM THE COMMUNITY In online survey no. 2, respondents were asked if they support the proposed sidewalk locations and/or the need for more sidewalk connections? About 71% indicated ‘yes’ compared to only 5% who said ‘no’ and 15% who are not sure. The key themes from this survey are summarized as follows: • Where possible, adding new sidewalks on residential / local streets is desired by Langford residents • Existing roundabouts need better design to improve the visibility / safety of pedestrian crossings • Greater connections are desired to existing regional trails (e.g., Galloping Goose, E&N Rail Trail)
Page 46
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 42 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 42 PART 5 Future Active Transportation Network Figure 6: Long-Term Walking and Rolling Network
Page 47
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 43 43 PART 5 Future Active Transportation Network THE IMPORTANCE OF ACTIVE TRANSPORTATION OVERPASSES Both Highway 1 and Sooke Road (Highway 14), while critical for providing vehicle access and connection to/from Langford, also act as major barriers for active transportation users. The lack of safe crossing opportunities on Highway 1 can make access between north and south Langford more challenging and uncomfortable for many active transportation users. Similarly, Sooke Road (Highway 14) presents some gaps for the Galloping Goose Regional Trail, which makes trail crossings less comfortable, especially for vulnerable road users. Two active transportation overpasses are recommended in the ATP to address these barriers. Both overpasses, once implemented, will improve connectivity and safety for those walking, rolling, or cycling. The two recommended overpasses, which are shown in Figure 6 above, include: 1. Highway 1 Overpass – A separate active transportation overpass over Highway 1 connecting Florence Lake Road (north) with Skogstad / Matson Road (south). This would help address the north-south divide caused by Highway 1 in the community and is central to Langford, aligning with the north-south active transportation corridor proposed on Jacklin Road. Another Highway 1 overpass location was explored during public engagement east of the Millstream Overpass at Selwyn Road. While that is still a potential connection that may be explored in future plans, it came in second to the central overpass that aligns with increased density and will serve more Langford residents in the lifetime of this plan. 2. Sooke Road (Highway 14) Overpass – An active transportation overpass extending the Galloping Goose Regional Trail over Sooke Road (Highway 14) near Glen Lake Road / Happy Valley Road. Currently, people walking and cycling must dismount, cross the signalized intersection in two stages, and travel along a narrow highway shoulder with high vehicle volumes, creating an uncomfortable and stressful experience. The proposed overpass would provide a continuous, safer connection for active transportation users, and may also improve vehicle operations at the intersection by reducing pedestrian and cyclist crossings. Figure 7: The Galloping Goose Regional Trail Active Transportation Overpass in Colwood, BC (Darren Stone)
Page 48
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 44 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 44 PART 5 Future Active Transportation Network Table 7: Recommended Sidewalk Infrastructure Infrastructure Type Sidewalk Widths Example Separated (Recommended) 1.8m minimum 2.2 to 2.4m desirable1 1.2m buffer minimum for landscaping 2.0 m buffer desirable for street trees Non-Separated (Supporting) 1.8m minimum 2.2m desirable 1 Depending on the location and land use context. For more information, see Chapter C (Pedestrian Facilities) in the latest edition of the BC Active Transportation Design Guide. Pedestrian Infrastructure Spectrum (BC Active Transportation Design Guide)
Page 49
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 45 45 PART 5 Future Active Transportation Network Most of the existing cycling infrastructure in Langford consist of painted bike lanes. However, given that many of Langford’s major roads experience high traffic volumes, a higher level of protection is warranted. Currently, there are no AAA bike routes connecting the city’s major neighbourhoods, such as South Langford to North Langford, or the City Centre over to Westhills. Without routes that provide comfort and protection, cycling and micromobility cannot become practical, viable mobility options. The long-term cycling and micromobility network, shown in Figure 9, features more than 13 kilometres of new protected bike lanes across the city, with Jacklin Road serving as the primary AAA north to south active transportation corridor. This north-south corridor will connect to the proposed active transportation overpass linking North Langford, Goldstream Avenue, the E&N Rail Trail, and the Galloping Goose Regional Trail. From this primary corridor, people cycling and/or using other micromobility devices will be able to connect to travel on AAA infrastructure from South Langford to Bear Mountain and Thetis and Millstream. Additional protected bike lane corridors are planned along Goldstream Avenue from Leigh Road to VMP, Latoria Road from Happy Valley Road into Colwood, and along sections of Highway 14 (Sooke Road). An additional protected bike lane corridor was considered along Leigh Road south of Goldstream Avenue connecting down to the E&N Rail Trail Extension. However, any significant improvement to the cycling and micromobility infrastructure along this corridor would depend largely on future redevelopment, which is neither anticipated nor identified in the latest OCP. As a result, this corridor is not expected to be feasible within the lifetime of this plan. In addition to the protected bike lanes, the long-term network includes the addition of neighbourhood bikeways (also known as bicycle boulevards or local street bikeways), which are low traffic and low speed roadways that have been enhanced with traffic calming and traffic diversion features to prioritize the movement of bicycle traffic. With over 10 kilometres proposed in the long-term network, this shared use infrastructure provide comfortable connections for both bicycles and micromobility and connect more residential areas to the protected corridors. Throughout the network, existing painted bike lanes will be maintained unless they are part of the AAA network. While these painted lanes are not comfortable for most users, they do provide space for cyclists and can provide short connections between AAA infrastructure and residences or other destinations. The goal is to ensure that when routes connect to larger, busier roads, riders will have access to AAA protected infrastructure for most of their trip. 5.3 Cycling and Micromobility The long-term cycling and micromobility network will rely on a balanced mix of dedicated bicycle infrastructure and neighbourhood bikeways, as well as multi-use pathways and regional trail connections. The multi-use pathway system plays a particularly important role in the cycling and micromobility network by enhancing network continuity and providing regional links beyond Langford, as discussed further in Section 5.4. Transitions between cycling infrastructure should follow the guidance outlined in the latest edition of the BCATDG. The guide provides recommendations for transitions, including appropriate signage, pavement markings, and physical protection for cyclists. Where possible, higher order bicycle infrastructure (featuring protection for cyclists) should be maintained through intersections. Transitions from lower- order to higher-order infrastructure should occur before an intersection, while transitions to lower-order infrastructure should take place after the intersection. An example of a bike lane transition to a protected corner is shown in Figure 8. This treatment can be used where the bicycle corridor intersects with a major road with higher volumes and turning conflicts. Figure 8: Bicycle Lane Transitioning to Protected Corner (BC Active Transportation Design Guide)
Page 50
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 46 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 46 PART 5 Future Active Transportation Network Figure 9: Long-Term Cycling and Micromobility Network
Page 51
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 47 47 PART 5 Future Active Transportation Network Descriptions for the proposed future cycling and micromobility infrastructure are provided in Table 8. The recommended dimensions generally align with best practices and industry guidance including direction in the BCATDG. For protected bike lanes, the recommended approach is to provide raised, separated infrastructure positioned behind the curb (and parking), adjacent and level with the sidewalk. This infrastructure remove cyclists from the roadway, reducing the risk of conflicts with motor vehicles and parking vehicles. Where possible, buffers should be provided between sidewalk and cycling infrastructure, ideally incorporating landscaping, to minimize conflicts between active transportation users. In locations with limited right-of-way, on-street protected infrastructure may be implemented. WHAT WE HEARD FROM THE COMMUNITY In online survey no.2, respondents were asked to provide feedback on the proposed active transportation network including the recommended cycling infrastructure and the two proposed overpasses. When asked which active transportation overpass should be prioritized in the ATP, respondents indicated the following: • About 37% said ‘Highway 1 Active Transportation Overpass’ • About 21% said ‘Sooke Road Active Transportation Overpass’ • About 25% were ‘neutral’, compared to 10% who are ‘undecided’, and 8% who said ‘neither’ Respondents were also asked if they support Jacklin Road as the main protected north-south corridor of the cycling network. About 38% said either ‘yes’ or ‘somewhat’ compared to 26% who said ‘no’ with 16% of respondents who said ‘they do not currently use bike lanes’. Respondents were also asked to rank which protected cycling corridors should be prioritized for implementation. The top three, in order of priority, included: 1. Jacklin Road 2. Goldstream Avenue 3. Highway 14 (Sooke Road)
Page 52
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 48 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 48 PART 5 Future Active Transportation Network Table 8: Future Cycling and Micromobility Infrastructure Infrastructure Type Sidewalk Widths Example Separated and Raised Bi-Directional Protected Bike Lane (Preferred) Bike Lane Desirable: 4.0 m Constrained: 3.0 m Street Buffer (Landscaping) Desirable: 2.0 m Constrained: 1.2 m Pedestrian Pathway Desirable: 2.4 to 3.0m Constrained: 1.8 m Bike-Pedestrian Separation Minimum: Treatment / Paint Separation Desirable: Buffer (0.5 to 1.0m) On-Street Bi- Directional Protected Bike Lane Bike Lane Desirable: 4.0 m Constrained: 3.0 m Street Buffer Desirable: 0.9+ m Constrained: 0.6 m
Page 53
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 49 49 PART 5 Future Active Transportation Network Infrastructure Type Sidewalk Widths Example On-Street Unidirectional Protected Bike Lane Bike Lane Desirable: 2.5 m Constrained: 1.5 m Street Buffer Desirable: 0.9 m Constrained: 0.6 m Neighbourhood Bikeway The clear width of the roadway (excluding parking lane) should be 4.0 to 5.5 m On-Street Painted Bike Lane (Supporting) Bike Lane Desirable: 1.8 m Constrained: 1.5 m Buffer (to traffic) Desirable: 0.6 m Constrained: 0.3 m Buffer (to parking) Minimum: 0.6 m
Page 54
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 50 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 50 PART 5 Future Active Transportation Network Multi-use pathways (also referred to as multi-use paths) play an important role in the active transportation network by providing flexible, safe spaces for a variety of users, helping to reduce conflicts on roads while encouraging travel by active modes. By allowing multiple users to share the space, this infrastructure make for more efficient use of limited right-of-way. They also encourage casual walking and cycling in areas where fully separated infrastructure might not be feasible. When combined with dedicated pedestrian and cycling infrastructure, multi-use pathways enhance connectivity and accessibility across the long-term transportation network. Langford is home to an extensive multi-use pathway and regional trail network, including the Galloping Goose Regional Trail (connecting Victoria to Sooke), the E&N Rail Trail (connecting Victoria to Langford), and various local multi-use pathways around the city such as Hull’s Trail. The proposed multi-use pathways in the long-term active transportation network includes additional pathways in South Langford, including the previously completed connection between Lobo Vale and Latoria Road, with an extension proposed from Latoria Road down to Fashoda Place. These multi-use pathways provide AAA connections to the Galloping Goose Regional Trail and the rest of Langford. On Bear Mountain, the existing wide sidewalks will be formalized into multi-use infrastructure, creating a separated multi-use pathway for active transportation users that connects the top of the mountain down to Millstream Road to provide greater access to the community. For regional trail improvements, the E&N Rail Trail Humpback Connector, a 3.5-kilometre extension of the E&N Rail Trail from Jacklin Road to Humpback Road, provides residents with one of the most significant AAA east-west connections in Langford. Fully separated from motor vehicle traffic, the multi-use trail runs alongside Langford Lake and links the Westhills and Goldstream Meadows neighbourhoods directly to the City Centre. An extension of the separated multi-use path on West Shore Parkway from Kettle Lake Drive down to the future E&N Trail extension is also proposed to improve active transportation connectivity. In the long-term network, the Galloping Goose Regional Trail within the City of Langford from VMP to Wild Ridge Way is proposed to be paved, creating a comfortable surface for all forms of micromobility. These improvements will be anchored by a new active transportation overpass across Sooke Road (Highway 14) at Glen Lake Road, addressing one of the primary barriers for cycling to and from South Langford. 5.4 Multi-use Pathways Quick build, also referred to as rapid implementation, refers to the fast installation of active transportation infrastructure that are temporary in nature and typically implemented on a pilot basis. Quick build projects include materials that are flexible, inexpensive, and allow for adjustments to be made after implementation. Quick build facilities have many advantages over longer and more permanent buildouts, including: 1. Rapid Deployment: Installed quickly to deliver immediate benefits, encourage active transportation use, and gather feedback in real-time. 2. Visualizing and Testing: Allows proposed active transportation infrastructure to be tested and observed, building community support before permanent installation. 3. Minimal Disruption: Implemented without removing existing infrastructure, and avoids impacts on utilities or drainage. 4. Flexible and Cost-Effective: Uses temporary materials and existing street geometry for easy adjustments and lower costs. One of the most comprehensive design guides on this topic in British Columbia is TransLink’s Rapid Implementation Design Guide for Bikeways in Metro Vancouver. The guide reinforces these principles, identifying speed of delivery, low cost, and flexibility as defining characteristics of quick build cycling infrastructure. Table 9 on the next page summarizes the different quick build materials that are recommended for Langford, some of which are already being utilized. According to the Rapid Implementation Design Guide, considerations for material selection include available curb to curb space, budgets, traffic volumes and speeds, on-street parking and curb management, frequency of driveways and intersections, aesthetics, and street drainage. Candidates for quick build projects around the city are outlined in Section 7.3.1. 5.5 Quick Build Cycling Facilities
Page 55
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 51 51 PART 5 Future Active Transportation Network Table 9: Quick Build Material Selection Material Description Asphalt A durable, flexible paving material that can be quickly installed, adjusted, and removed. It is less resource-intensive and more adaptable than concrete, while offering a smoother surface than unpaved infrastructure. Pre-cast Concrete Curbs (“Curb Plunks”) Anchored to the roadway, these short curbs provide a physical barrier that separates cycling infrastructure from vehicle lanes. Flexible Delineators / Bollards Vertical posts that enhance visibility and can be used to define quick build facilities. Used alongside curb plunks, painted buffers, or other forms of separation and protection. Painted Buffers Simple, low-cost method to separate bike lanes from vehicle lanes, although lacking physical separation from traffic. Planter Boxes Provide a large, physical barrier between cycling infrastructure and vehicle lanes, while adding aesthetics through temporary landscaping Examples of quick-build cycling facilities. Top left: concrete barriers and planter boxes on Abbott Street in Kelowna. Bot tom Left: planter boxes and flexible delineators on Danforth Avenue in Toronto. Right: curb plunks and asphalt multi-use pathway on Happy Valley Road in Langford
Page 56
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 52 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 52 PART 5 Future Active Transportation Network A list of projects (shown in Table 10) has been prepared to summarize the recommended active transportation infrastructure improvements in the long-term network. While this list does not include every recommended improvement shown on the long-term walking and rolling and cycling and micromobility network maps, it provides an overview of the larger projects highlighted in the preceding sections. 5.6 Summary of Active Transportation Projects Table 10: Summary of Active Transportation Projects Project/Location Infrastructure Type Highway 1 Central Active Transportation Overpass Crossing / Overpass Galloping Goose / Highway 14 (Sooke Road) Active Transportation Overpass Crossing / Overpass Bear Mountain Parkway Multi-Use Path Multi-Use Path Goldstream Avenue Multi-Use Path Improvements Multi-Use Path Happy Valley Road from Latoria Road to Fashoda Place Multi-Use Path Klahanie Drive Multi-Use Network Build-out Multi-Use Path Luxton Road from Happy Valley Road to Lippincott Road Multi-Use Path Setchfield Avenue Multi-Use Path Extension Multi-Use Path Walfred Road Multi-Use Path Multi-Use Path Brock Avenue from Peatt Road to Matson Road Protected Bike Lanes Goldstream Avenue from VMP to Claude Road Protected Bike Lanes Jacklin Road Active Transportation Corridor: Goldstream to Station Avenue Protected Bike Lanes Jacklin Road Active Transportation Corridor: Station Avenue to Galloping Goose Protected Bike Lanes Latoria Road from Happy Valley Road to Colwood Border Protected Bike Lanes Leigh Road from Highway 1 to Goldstream Avenue Protected Bike Lanes Highway 14 (Sooke Road) from Jacklin Road to Happy Valley Road Protected Bike Lanes Treanor Avenue Improvements Protected Bike Lanes Goldstream Avenue from Claude to Leigh Road Protected Bike Lanes and Sidewalk Infill E&N Rail Trail Extension: Humpback Connector Regional Trails Galloping Goose Paving Regional Trails City Centre Improvements Neighbourhood Bikeway / Painted Bike Lanes Mill Hill Improvements Neighbourhood Bikeway / Painted Bike Lanes Thetis Heights / Millstream Improvements Neighbourhood Bikeway / Painted Bike Lanes Glen Lake Road (from Monnington Place to Parkdale Drive) Sidewalk and Bike Lanes Sidewalk Infill - Various Sidewalk
Page 57
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 53 53 PART 5 Future Active Transportation Network The effectiveness of active transportation infrastructure depends on the safety and comfort along the entire route. If any segment feels unsafe or uncomfortable, users are significantly less likely to choose active modes of travel. In active transportation design, the critical “weakest link” elements occur at roadway intersections, including crosswalks, cross- rides, and regional trail crossings. If these crossings do not accommodate users of all ages and abilities, even high-quality active transportation infrastructure will be less effective in attracting active transportation users. Conflicts between active transportation users and motor vehicles can be reduced, or eliminated, through thoughtful design approaches. Universal design is a fundamental principle that emphasizes creating built environments to a standard that is accessible for people of all ages and abilities, regardless of physical, sensory, or cognitive impairments. This principle should be applied in all future active transportation design projects to ensure safe and inclusive access for all users. One example of an intersection with accessibility barriers is Jacklin Road / Dunford-Station Avenue, as shown in Figure 10. The crosswalks lack sidewalks on both the northeast and southwest corners, creating potential navigational barriers for pedestrians and forcing them to wait to cross at-grade with traffic. The presence of diagonal rail tracks may create a barrier for people using mobility devices. The absence of audible signals at the signalized crossing reduces the ability of people with visual impairments to determine when it is safe to cross. Users approaching the intersection from the E&N Rail Trail are not provided with tactile walking surface indicators (TWSIs) or a curb to signal the trail’s end, creating the risk that pedestrians may inadvertently enter the road. 5.7 Crossings and Accessibility Figure 10: Example of Accessibility Challenges at Jacklin Road / Dunford Avenue / Station Avenue The following section outlines accessibility design features and crossing treatments that improve safety and usability for all users, which can help address the challenges highlighted in the example above.
Page 58
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 54 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 54 PART 5 Future Active Transportation Network Curb Ramps Curb ramps, which are also referred to a “curb cuts” and “sidewalk letdowns” are found at most intersections in Langford where sidewalks are provided. These ramps are required for people using wheelchairs, strollers, power scooters, delivery carts, and other forms of micromobility to transition from the sidewalk elevation to crosswalk elevation. Curb ramps are also used as a navigational tool by people with visual impairments. Double curb ramps are a more accessible feature compared to the combined curb ramps currently installed around the city. Double ramps provide full universal access by landing pedestrians directly in the crossing area and in the desired direction of travel, rather than entering the road at an angle and having to reorient themselves. Curb ramps should be upgraded at Goldstream Avenue / Peatt Road, and Langford Parkway / Phipps Road. Score lines, or parallel grooves, provide directional wayfinding along curb ramps for people who are visually impaired, typically aligning with the crosswalk to ensure that people are guided in the correct direction when crossing. There are further opportunities to add score lines, parallel grooves or raised lines, especially within the City Centre. Tactile Walking Surface Indicators (TWSIs) Tactile Walking Surface Indicators (TWSIs) are standardized warning surface treatments that are detectable underfoot or by a cane and alert or guide people with blindness or low vision. There are two main types: attention, which include truncated domes that are used to alert people of a change in elevation, upcoming conflicts, or hazards, and direction, which use elongated, flat-topped bars to indicate the direction of travel. In some instances, directional TWSIs can be used in place of score lines by providing pedestrians with a clear direction to cross. There are opportunities to upgrade crossings all around the City of Langford with TWSIs, to mitigate the navigational challenges for individuals with visual impairments. 5.7.1 Accessibility Curb Ramp at Goldstream Avenue / Peatt Road Tactile Indicators at VMP / Goldstream (City of Langford) WHAT WE HEARD FROM THE CAPITAL WEST ACCESSIBILITY ADVISORY COMMITTEE Engagement with CWAAC confirmed that tactile walking surface indicators are helpful for the accessibility community and that the City should look to expand the implementation of TWSIs across Langford. That said, the CWAAC stressed the importance of not having the TWSIs cover the full width of a ramp due to those with differing mobility challenges that may need to navigate around them, especially during fall and winter when foliage and snow may be present.
Page 59
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 55 55 PART 5 Future Active Transportation Network Pedestrian Refuge Islands A valuable addition to any signed and marked or signalized crossing is a pedestrian refuge island, which provide a dedicated space for pedestrians to pause while crossing the roadway. These treatments are typically appropriate to be installed at roundabouts, channelized right turns, or wide roadways, offering a physically protected resting point for pedestrians. Pedestrian refuge islands reduce exposure to traffic and improve pedestrian safety, allowing users to focus on crossing one direction of traffic at a time. 5.7.2 Crossing Treatments Raised Crosswalks A raised crosswalk provides a flat, elevated walking surface for pedestrians while introducing vertical deflection for vehicles (similar to speed humps). Raised crosswalks enhance pedestrian visibility and encourage drivers to reduce speeds, improving safety and creating a more comfortable crossing experience. By having vehicles go over a raised crosswalk, it creates the impression that drivers are entering pedestrian spaces, further encouraging drivers to slow down and be more aware of their surroundings. Opportunities to upgrade to raised crosswalks are generally most appropriate on local roads, and are typically avoided on transit and truck routes. Pedestrian Refuge Island on the Galloping Goose Regional Trail (Left) and on Treanor Avenue (Right) Raised Crosswalk in Bear Mountain (Left) and in the Parksville Community Park (Right)
Page 60
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 56 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 56 PART 5 Future Active Transportation Network Cross-ride Pavement Markings and Multi-Use Signage At multi-use pathway and regional trail crossings and along protected bicycle lane routes, appropriate cross- ride pavement markings should be provided. This includes “elephant’s feet” markings on the outside of the zebra or twin parallel crosswalk markings, indicating that cyclists are permitted to ride through the crossing. Additionally, signage should clearly indicate that the crossings are intended for all users, including those using various forms of micromobility. There are opportunities to enhance crossings along many of Langford’s multi-use crossing, including at the existing crossings for the E&N Rail Trail and the Galloping Goose Regional Trail. Crosswalk and Bike Cross-Ride at VMP / Goldstream Lighting Improvements Improved lighting at crossings enhances visibility for pedestrians and micromobility users, making them more noticeable to drivers during low-light conditions and improves overall safety. While lighting at road crossings is essential, adequate illumination should also be provided along active transportation infrastructure to ensure users feel safe and visible throughout their entire journey. Active transportation crossings throughout Langford should be reviewed to ensure that adequate lighting and visibility are provided for users during low-light conditions.
Page 61
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 57 57 PART 5 Future Active Transportation Network Pedestrian Countdown Timers Signal timing for pedestrians in Langford typically includes a standard 7 seconds of walk time, followed by a calculated clearance interval calculated. A 1.0 m/s walking speed should be used for all clearance interval calculations. The 1.0 m/s walking speed accommodates a more diverse population, including children, the elderly, or people with mobility impairments. The City should review all pedestrian clearance calculations when they review signal timing for each signal as per the Traffic Management Plan. Leading Pedestrian Intervals A leading pedestrian interval (LPI) typically gives pedestrians a 3-7 second head start when crossing at a signalized intersection prior to the corresponding green signal turning on in the same direction of travel. This gives pedestrians an opportunity to establish themselves in the crossing, increasing sightlines for permissive right and left turning vehicles. LPIs can be installed alongside ‘No Right Turn on Red’ restrictions, further improving pedestrian safety at locations with high pedestrian crossing volumes. While LPI presents several benefits for pedestrians, it can result in greater delay for vehicles. As such, the implementation of LPI should include a clear list of its benefits, impacts, and implications for all users including vehicles. The City of Langford maintains an active program to retrofit traffic signals with leading pedestrian intervals, where appropriate, to enhance pedestrian safety at intersections. 5.7.3 Signalized Pedestrian Crossings WHAT WE HEARD FROM THE CAPITAL WEST ACCESSIBILITY ADVISORY COMMITTEE Feedback was sought from the CWAAC on audible pedestrian signals, push buttons, and leading pedestrian intervals. A summary of the feedback is provided as follows: • Audible pedestrian signals are helpful for the accessibility community and should be prioritized in the City Centre. • The design of push buttons needs careful consideration as their placement at times could be hard for some users to reach. • The City could consider pedestrian wave buttons, which have been implemented in other communities. • Leading pedestrian intervals should be prioritized for Langford’s larger intersections and in school zones. Channelized Right Turns Channelized right turn lanes present challenges to pedestrians trying to cross due to the higher speed of the turning vehicles and yield controlled nature of the turn and should be reserved for highway conditions and not within an urban city. When it is not feasible to remove the channelized right turn, the design of the right turn should a ‘high entry angle’ design, which increases the entry angle to the crossroad, improves visibility of the crosswalk, and decreases the turning speeds to be more consistent with a yield condition. Where possible, channelized right turn lanes should be avoided or removed, particularly along popular pedestrian and cycling routes. Although channelized right turn islands provide a refuge area for pedestrians, many within the city are undersized and designed for higher vehicle speeds, resulting in cramped and uncomfortable conditions. This challenge is further compounded at locations where cyclists and micromobility users are required to dismount and walk, occupying additional space within already constrained areas. While the removal of channelized right turns results in several benefits for active transportation users, there can be several impacts to vehicles. The conversion of a channelized right turn lane to a tighter right turn lane can increase vehicle delay and reduce the overall capacity of right-turning vehicles at the intersection. This is an important trade-off that needs to be considered as Langford evaluates its intersections and channelized right turns. Audible Pedestrian Signals Audible pedestrian signals use cuckoo and chirp sounds to indicate when it is safe to cross a road and which direction to cross, helping visually impaired individuals navigate intersections by auditory cues. Many of the city’s major intersections, especially in the City Centre, include audible pedestrian signals; however, audibles can be absent from smaller or more rural intersections, creating a barrier for people who are blind or have low vision. The City of Langford maintains an active program to retrofit traffic signals with audible features to enhance accessibility at intersections and should be the standard for new signal installations around the city.
Page 62
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 58 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 58 PART 5 Future Active Transportation Network 5.8 Maintenance of the Active Transportation Network As outlined in Chapter I of the BCATDG, “while providing new infrastructure to promote walking and cycling is often seen as a top priority, ongoing rehabilitation and maintenance of existing infrastructure needs to be an equally important focus.³ Maintenance of the active transportation network is a top priority and should be equal or higher than maintaining the motor vehicle lanes. The City will need to regularly maintain its active transportation network to make it usable for all active transportation users, regardless of their age or ability. The following outlines some of the key considerations for the City’s maintenance protocols and procedures. Facility sweeping is important for all active transportation infrastructure, especially cycling infrastructure. The presence of debris on an active transportation infrastructure could make for a less comfortable—and safe—experience. Whether it is gravel, broken glass, leaves, or something else, debris can be a barrier for users and presents hazards for those using active transportation infrastructure. Specifically, the lack of facility sweeping could result in slipping or collision hazards and punctured bicycle tires, for example. Langford residents are responsible for sweeping their sidewalks and keeping them clear of snow and ice. However, it is the responsibility of the City to manage and maintain cycling infrastructure. As the City builds its future active transportation network, it is recommended that it consider the following: • Incorporate multi-use pathways and protected bike lanes into the road sweeping program. • Create a schedule that prioritizes sweeping of road with cycling infrastructure seasonally. This includes additional sweeping in the fall in areas where leaves accumulate and sweeping in the spring to remove debris from the winter. • Sweep infrastructure whenever there is an accumulation of debris that may pose a hazard. 5.8.1 Facility Sweeping Example of a Bike Lane Sweeper in Nashville, Tennessee (WLPN) 3 Government of BC. (2019). BC Active Transportation Design Guide. Chapter I: Maintenance. Available online at: https://www2.gov.bc.ca/gov/content/ transportation/transportation-infrastructure/engineering-standards-guidelines/traffic-engineering-safety/active-transportation-design-guide Bike Lane Sweeper (City of Chilliwack)
Page 63
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 59 59 PART 5 Future Active Transportation Network Signage and pavement markings are recommended for all new active transportation infrastructure. Whether its signage required for new pedestrian crossings or pavement markings (stencils) for neighbourhood bikeways and protected bikes lanes — they are useful for helping to identify the infrastructure type for all road users. They can also provide wayfinding for people and warn users of potential conflicts. The City should incorporate regular inspections of signage and pavement markings into monthly road inspections to ensure they remain in good condition. The City should utilize thermoplastic materials, which are more durable, for marking the active transportation network. 5.8.3 Maintenance of Signage and Pavement
Markings Even though Langford’s annual snowfall is minimal, there are still days — sometimes weeks — where there can be significant snowfall. This can present a significant challenge along cycling infrastructure and sidewalks. There are multiple strategies that the City should employ to manage snow in the winter months. This includes snow clearing prioritization, typically included in a snow clearance policy, and cycling infrastructure design for efficient snow storage. The future active transportation network includes a network of protected bike lanes, along with other types of infrastructure. The City will need to consider snow storage for some of its on-street protected bicycle infrastructure (space permitting). This can facilitate snowplowing more easily as the snow could be plowed into the designated storage space rather than the bike lane. 5.8.2 Cycling Infrastructure Design for Snow
Storage Example of Desirable Design for Snow Storage in Protected Bike Lanes. (BC Active Transportation Design Guide⁴) 4 Government of BC. (2019). BC Active Transportation Design Guide. Chapter I: Maintenance. Available online at: https://www2.gov.bc.ca/gov/content/ transportation/transportation-infrastructure/engineering-standards-guidelines/traffic-engineering-safety/active-transportation-design-guide
Page 64
PART 6 Supportive Policies and Programs
Page 65
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 61 61 PART 6 Supportive Policies + Programs Supportive Policies and Programs To support and promote active transportation use, the provision of new infrastructure must be complemented with policies and programs to help facilitate culture change and achieve mobility choice. This section provides recommendations on specific policies, programs, and regulatory changes that could all support Langford’s future active transportation network. 6.1 Programs to Promote Active
Transportation Programs and Education There are several programs and initiatives that the City could explore or expand to help promote active transportation, some of which are already in place. They are summarized below. Program Description Key Audience Safe Routes to School Program Langford’s Safe Routes to School program has been helping address barriers to active travel. Between 2022 and 2025, more than $15 million was committed to sidewalk infill projects, protected multi- use pathways, protected bike lanes, traffic calming measures, and intersection safety improvements. There is an opportunity to enhance this program by developing “Plan Your Route” maps for each school. These maps would highlight active transportation routes, transit options, and pick-up/drop-off, helping children, parents, and guardians safely plan their to and from schools in Langford. Continued expansion of this program, including both infrastructure investments and supportive tools, would be an effective way to promote active transportation for school-related trips. TransLink’s School Neighborhood Activation Playbook⁵ (SNAP) also provides a practical framework for creating safer, healthier, and more active school neighbourhoods. The City of Langford can use the playbook to assess school-area transportation challenges and guide the implementation of measures that encourage active travel to and from school. Families Walking School Bus Initiative The Walking School Bus initiative is a community-based active transportation program that helps students walk safely to and from school in groups along designated routes. Similar to a traditional school bus, the group follows scheduled stops to pick up additional students, but instead of riding in a vehicle, children walk together under the supervision of trained adult Walk Leaders. The program aims to improve children’s physical and mental well-being, promote social connections and independence, reduce traffic congestion around schools, and lower greenhouse gas emissions by encouraging active travel. The Society for Children and Youth of BC has expanded the initiative across multiple communities in British Columbia, supporting safer, healthier, and more sustainable school commutes. In Langford, Millstream Elementary School recently implemented a Walking School Bus program, expanding access to safe and sustainable active transportation opportunities for local students and families. Families Table 11: Summary of Active Transportation Programs and Educational Initiatives 5 TransLink (2026). School Neighbourhood Activation Playbook. Available online at: https://view.publitas.com/translink/school-neighbourhood-activation- playbook/
Page 66
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 62 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 62 PART 6 Supportive Policies + Programs Program Description Key Audience Bicycle Skills Training The City could partner with or provide funding support to local cycling advocacy organizations or non-profits to offer bicycle skills training courses. The City should also consider including incentives to encourage people to take the training (e.g., bike lights, helmets, etc.) These workshops would be available for anyone who would like to ride their bicycle (more often) but lack the confidence and/or skills. Residents, Employees, Visitors E-Bike and E-Scooter Sharing Program In 2025, an e-bike and e-scooter sharing program launched in Langford. The fleet currently features 75 e-scooters and 75 e-bikes available in Langford , with future expansion plans. These devices are available to residents and visitors for various trip purposes. The City could consider partnering with the program provider to do annual (or bi-annual) community bicycle and scooter rides using the shared fleet. Events like these can create opportunities to bring a variety of community members together for a ride to share an experience on new or existing cycling infrastructure. This type of event can encourage individuals new to cycling or e-scooting a chance to experience cycling in the city in a safe and inviting environment. Residents, Employees, Visitors Dedicated Active Transportation Page The City could introduce dedicated webpages for active transportation modes to highlight different programs, services, and information. The intent would be to have a centralized source on the various active transportation modes and create awareness on sustainable travel options to support travel behaviour change. The website could also show the existing and planned walking, rolling, and cycling networks. Residents, Employees, Visitors BikeMaps and WalkRollMap Both BikeMaps and WalkRollMap are crowdsourcing tools for mapping barriers to active transportation. BikeMaps allows users to identify specific cycling safety problem areas / hazards along with locations where a bike theft has occurred. WalkRollMap allows users to identify issues within the pedestrian network including deficient sidewalks or sidewalk gaps, unsafe crossings, and more. The City could promote both websites through its social media platforms and its own webpage to increase awareness and allow residents to flag problem locations for staff. Residents, Employees
Page 67
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 63 63 PART 6 Supportive Policies + Programs ACTIVE TRAVEL TO SCHOOLS According to the CRD Active School Travel Reports for Millstream Elementary and Willway Elementary (2021- 2022), over 80% of families prefer their students commute using active travel. Despite this, 38-45% of families continue to drive their children to school. The primary reasons cited by families included need for improved connectivity, improved separation and protection from motor vehicles, additional signed and marked crosswalks, and traffic calming measures to slow down drivers to improve comfort for active travel. The City of Langford’s Safe Routes to School program has been helping address these barriers. From 2022 to 2025, more than $15 million was committed to sidewalk infill projects, protected multi-use pathways, protected bike lanes, traffic calming, and intersection safety improvements. Safe Routes to School Program in Mississauga (Adam Pulicicchio) “Plan Your Route to School” Map (Capital Regional District)
Page 68
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 64 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 64 PART 6 Supportive Policies + Programs 6.2 Shared Streets and Temporary
Street Closures Streets are typically designed and engineered to prioritize vehicle movement. This is reflected in the fact that a typical street’s roadway allocation is mostly dedicated to vehicles. Recognizing this fact, and the many benefits streets could offer to all roadway users, communities across North America have been piloting different approaches to reallocating road space. The two common approaches are summarized below. 6.2.1 Shared Streets A shared street is defined as place in which all modes share the same space and where pedestrians are prioritized. They are intended to function as public spaces allowing for different functions including socializing, recreation, and shopping. According to the BCATDG, the key concept is to provide fewer traditional traffic management tools (such as curbs, signage, and lane markings) and replace them with pedestrian elements such as street furniture, trees, and other placemaking elements.6 A shared street can be completely open for all modes, or have designated zones that exclude or encourage certain modes or activities. They are more common in a downtown or commercial setting as they can add vibrancy through outdoor seating, patios, artwork, and landscaping that helps to attract people. Also referred to as “sticky streets”, they encourage people to stay to shop, socialize, and engage in placemaking. 6 Government of BC. (2019). BC Active Transportation Design Guide. Chapter E: Multi-use Facilities. Available online at: https://www2.gov.bc.ca/assets/gov/ driving-and-transportation/funding-engagement-permits/grants-funding/cycling-infrastructure-funding/active-transportation-guide-low-res/2019-06-14_ bcatdg_section_e_rfs.pdf Argyle Street in Halifax is an example of a shared street (Fathom) 6.2.2 Temporary Street Closures / Pedestrian
Street Activations A temporary street closure for vehicle movement is another way to create placemaking opportunities and reallocate and activate public spaces for pedestrians. Various communities across Canada close their streets in the summer months for a major event, festival, and/or to generate more foot traffic for businesses. Street closures could be as short as one day to as long as an entire summer. For example, the City of Vancouver introduced a pilot project in its Gastown neighbourhood in 2025. This included a car-free pedestrian zone on Water Street every Sunday in the summer from 10 am to 6pm to promote local business and create a vibrant, pedestrian-friendly atmosphere. The City of Langford also closes Goldstream Avenue to vehicles each August for one day for its Show and Shine event in downtown Langford. Langford Show and Shine Street Closure and Activation
Page 69
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 65 65 PART 6 Supportive Policies + Programs As part of promoting active transportation and placemaking, the City has an opportunity to pilot more temporary street closures and pedestrian street activations. This could include Bryn Maur Road, Station Avenue, and Peatt Road, for example, where there are established businesses and placemaking opportunities already occurring. In doing so, it should consider the potential impacts to vehicles including temporary diversions and how to accommodate vehicle parking that may be temporarily lost due to a street closure. 6.3 User Separation on Regional
Trails Langford benefits from access to two regional multi-use trails that traverse the city. Both are under the jurisdiction of the CRD, and both are anticipated to become even more utilized as Langford builds out its active transportation network and achieves its mode share targets. As the trails become busier over time, it is anticipated that user conflicts between those walking, cycling, and rolling will worsen, which could result in a less comfortable and pleasant experience. Even though the regional trails are under the jurisdictions of the CRD, the City could advocate for separation of trail users as a longer-term strategy to help mitigate conflicts between users. According to the BCATDG, the decision to separate bicycle users from other users should be based on three main factors: 1. Right-of-way available 2. Total volume of current and anticipated pathway or trail users 3. Ratio of pedestrians to all daily pathway or trail users The BCATDG indicates that if the required space is available, then separation should be provided between bicycle users and other pathway users to help enhance safety and make the infrastructure more comfortable for all users. The guide provides recommended ratios for when trail or pathway separation should be considered as outlined in Table E-21.7 For trails that are 4.0m in width, such as most sections of the Galloping Goose Regional Trail and E&N Rail Trail, with more than 1,400 daily users, including at least 20% pedestrians, separation between pedestrian and bicycle pathways should be provided where space allows. Based on data from the CRD’s Regional Cyclist and Pedestrian Count Program, there are two locations that are within the City of Langford’s boundary that should be explored for separating users. These include: • E&N South of Westwind Drive (counter #21). In the month of June (2025), this location saw its peak of approximately 1,236 pedestrians / cyclists per day with pedestrians accounting for approximately 40% of the total daily volumes.8 Even though this location did not hit the 1,400 daily users recommended, it is anticipated that the daily volume will increase significantly in the future as the city’s population and active transportation network grow. • Galloping Goose West of Brittany Drive (Counter #27). In the month of June (2025), this location saw its peak of approximately 1,018 pedestrians / cyclists per day with pedestrians accounting for approximately 32% of the total daily volumes.9 Separating the trail in this location in the future could be done in conjunction with paving the trail from VMP to Luxton Road to provide a more comfortable connection to Happy Valley Elementary School and all the destinations in between. It is recommended that the City continue to work with the CRD to advocate for regional trail improvements including potential widening in the locations noted above to help enhance safety and make the infrastructure more comfortable for all users. Example of Trail User Separation on the Vancouver Seawall (ActiviFinder) 7 Government of BC. (2019). BC Active Transportation Design Guide. Chapter E: Multi-Use Facilities. Available online at: https://www2.gov.bc.ca/gov/content/ transportation/transportation-infrastructure/engineering-standards-guidelines/traffic-engineering-safety/active-transportation-design-guide 8 Capital Regional District. (2025). Regional Cyclist and Pedestrian Count Program. Available online at: https://data.eco-counter.com/public2/?id=300019783# 9 Capital Regional District. (2025). Regional Cyclist and Pedestrian Count Program. Available online at: https://data.eco-counter.com/public2/?id=300015495#
Page 70
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 66 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 66 PART 6 Supportive Policies + Programs 6.4 Amenities Short-term bicycle parking, which is intended for people stopping for less than two hours to run errands, shop, have a meal, or any other short-term activity, is an important part of Langford’s active transportation network. Providing convenient and visible short-term bicycle parking helps address concerns about bike theft, which can significantly influence travel decisions and discourage people from choosing to cycle. Short-term bicycle parking is generally appropriate for commercial and retail areas, office buildings, health care and recreational facilities, and institutional developments such as libraries and universities. 6.4.1 Public Short-Term Bicycle Parking While there is some short-term bicycle parking available across the city today, it is generally sporadic and not consistent in design. Rack selection for short- term bike parking is important. The recommended style is the ‘Inverted U’ and ‘Post and Ring’ rack types due to their universal application and sound design as shown in Figure 11. Other short-term rack types are known for certain performance and usability issues, such as the ‘coat-hanger’ or ‘wave’ style racks that are commonly found throughout the city. Rack design should reflect the changing nature and size of bikes and carriers, as well as racks for families who bike together. The City’s short-term bicycle parking assets should be reviewed to make sure they meet the preferred rack types, and where deficient, the racks should be identified for replacement. In addition, new racks should be considered in the following locations: • Parks, such as Veterans Memorial Park • Recreation facilities, such as the YMCA-YWCA and Starlight Stadium • City Centre (both off-street in the public right- of-way and on-street in bike parking corrals) • Transit Stations • Libraries Figure 11: Recommended Rack Types Coat-hanger and Inverted U style racks in Langford Example of an On-street Bike Parking Corral (City of Mississauga)
Page 71
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 67 67 PART 6 Supportive Policies + Programs Similar to short-term parking, long-term bicycle parking is a key component of Langford’s active transportation network. Long-term bike parking is intended for destinations where people cycling will be stopping for two to four hours or longer, such as schools and workplaces, multi-family residences, high activity transit stops, and other areas of high cycling activity. Secure bicycle parking is particularly important for these longer-duration trips, as the risk or perception of bike theft can discourage cycling and limit mode shift. Secure bike parking can also be provided at Station Exchange and other proposed multi-modal hubs. Bike parking infrastructure allows residents to bike to transit exchanges, safely store their bicycles, and use public transportation for longer trips. Apart from secure bike parking in private developments, there are few — if any — secure bicycle parking infrastructure in Langford today, creating a significant barrier for residents considering cycling into the City Centre. Access to secure bike parking is important to residents: according to a survey conducted as part of the City’s Parking Bylaw Modernization project, the lack of secure bike parking was one of the top challenges identified by residents. To support more cycling and micromobility trips within the city, Langford could explore the feasibility of secure parking infrastructure in the City Centre. This could include a dedicated bike cage, bike lockers, secure racks, or another form of parking that would be available to all micromobility devices including bikes, scooters, skateboards, among others. 6.4.2 City Centre Secure Bike Parking Infrastructure Some of the critical considerations for the provision of secure bike parking infrastructure include: • Location: the bike parking could be located off- street in a parking lot or on-street within the public right-of-way. The location will ultimately depend on the type of infrastructure provided. • E-mobility design: parking spaces for e-bikes and e-scooters should be provided so users can charge their devices. Further, oversized, and non-standard bike parking spaces should be available for those who have larger mountain or cargo bicycles. • Administration: the City would have to decide if it—or a third party—would manage the secure bike parking. The overall administration would likely require an application form that would determine the type of parking space sought by the resident, when they would typically require secure parking, etc. • Cost: if the secure bike parking infrastructure is provided as a pilot and/or as a short-term option, then the Village would need to determine if there is a cost or user fee associated with it. • Monitoring and Evaluation: the City would need to determine the utilization of the bike parking on a periodic basis along with conducting a survey to understand user experience. Example of secure bicycle parking solutions in Kingston, Ontario (left) and Victoria (right) (City of Kingston and City of Victoria)
Page 72
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 68 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 68 PART 6 Supportive Policies + Programs Consistent wayfinding and signage are important for orienting residents and visitors to key destinations in the community. Wayfinding can provide simple, clear, and intuitive information to help people navigate spaces effectively and intuitively. It helps people identify how they can navigate a community, neighbourhood, or active transportation network effectively from their present location to their destination. Wayfinding should connect places, be predictable, and be simple and easy to follow. The City should consider two types of wayfinding signage as part of a large Wayfinding Strategy for Langford: • Monoliths – A pedestrian monolith sign provides support to pedestrians at key decision points. They include the name / address of the current location, directions to nearby destinations, an overview map, community branding, and other supporting information. • Fingerposts – Fingerposts provide directional information to proximate destinations as a final step in a pedestrian’s or cyclist’s journey. They include times or distances to destinations and include recognizable brand identity. 6.4.3 Wayfinding and Signage The City should consider monolith type wayfinding in its City Centre to expand what is already there. The City Centre is an area that will see the most population growth and where the highest visitation is expected. Fingerposts could also be considered in the City Centre along with the Urban Centres and Corridors as the city sees more development and active transportation infrastructure in these growth areas. Example of Fingerposts in the City of Edmonton (City of Edmonton) Example of monolith wayfinding in the City of Victoria (Aaron Sportack)
Page 73
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 69 69 PART 6 Supportive Policies + Programs 6.5 Incentive-based Programs 6.5.1 E-bike Incentive Program Recognizing the growing demand for electric bicycles, several municipalities around North America have designed and implemented e-bike incentive programs to make it more financially viable to purchase an e-bike. According to the CRD’s 2022 Origin-Destination Household Travel Survey, 30% of bicycle trips are made by e-bikes, even though they make up only 10% of the stock of adult and children’s bicycles. That said, not all people can access or use an e-bike due to its cost. To address the issue of e-bike affordability, communities like the District of Saanich (Saanich) have introduced a program to reduce the cost of purchasing an e-bike. Saanich launched its program in 2021 and 2022 and offered three rebate options; the basic rebate amounted to $350, while the lowest- income households could receive up to $1,600. A total of 389 incentives were distributed from October 2021 to November 2022. The pilot program, which cost $313,600, was studied and evaluated by a team of researchers at the University of British Columbia (UBC) in 2024. In 2024, the UBC study’s results10 were released and reported the following: • One year after purchase, users continued to be satisfied with their e-bikes, integrating them into their routines for three to four days a week. They reduced weekly car travel by an average of 48 kilometres per week, a reduction of 30-40%. • E-bikes were used to replace vehicle trips and did so at a higher rate than a group of people who did not receive the rebate incentive • With less driving, users reduced their travel-related greenhouse gas (GHG) emissions by an average of 16 kilograms of CO2 per week, one year after buying their e-bikes. Those who received the biggest incentives reduced car use and carbon emissions the most. • Among those who received the $1,600 incentive, eight out of 10 would not have purchased an e-bike without it, compared to just two out of 10 who received the $350 incentive. Municipalities also have the legal authority to create financial- based tools (i.e., incentive programs) to help achieve a desired change. There are two specific programs that are recommended to increase cycling mode share and provide greater access to end-of-trip cycling facilities. 10 More information about the study is available online at: https://news.ubc. ca/2024/04/e-bike-incentives-prove-to-be-worth-the-investment/ Recognizing the success of Saanich’s program and the results of the UBC study, and to support more people riding bikes in Langford, an e-bike incentive program should be considered. The specific parameters of the program would need to be determined, but as a first step, the following steps are recommended: • Determine the eligibility criteria for the program and the desired rebate amounts; • Determine the total cost for the program and which internal City funds / programs could help pay for it; and • Determine if the program is going to be evaluated to determine its economic, equity, and environmental impacts. A type of Cargo E-bike Oversized Bicycle Parking in Edinburgh
Page 74
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 70 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 70 PART 6 Supportive Policies + Programs 6.5.2 Bike Parking Program for Businesses In addition to expanding the City-owned short-term bicycle parking inventory, the City should also consider working with the business community to expand bicycle parking options on private property. Short-term bicycle parking is available at some business / commercial establishments around the city but is not consistent in quantity and design. The City should establish a bike parking program that is available to the business community. The program would be intended to help businesses install or retrofit short-term bike parking to align with best practices. DID YOU KNOW? The District of Sooke launched a “Bike Rack for Business Program” in early 2025. The pilot project is intended to support local businesses and promote sustainable transportation. The initiative includes a limited number of public bike racks that are fabricated and provided (installation included) to local businesses at no cost, funded through the District’s Climate Action Program.
Page 75
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 71 71 PART 6 Supportive Policies + Programs 6.6 Bylaw and Policy Updates 6.6.1 Parking Regulations Bylaw There are several regulatory changes that have been incorporated into the City’s off-street parking regulations through recent updates to Section 4 of the Zoning Bylaw (now consolidated as Parking Regulations Bylaw No. 2272), that support and promote active transportation use. These updates reflect a coordinated approach to improving parking policy alongside broader transportation objectives. The bylaw update incorporates several key priorities related to active transportation, which are summarized in Table 12 below. Topic Description Oversized Bicycle Parking Oversized bicycles are longer, wider, and heavier than a typical bicycle, which makes them more challenging to park than a regular bike. While typically electrified, non- standard bikes include tricycles, electric cargo bikes, and bicycles with trailers. Due to their size, they require different parking configurations. As electric bicycles and other non-standard bikes become more commonplace, it will be important that new developments include appropriate bicycle parking to facilitate the secure and convenient storage of these bicycles. End of Trip Facilities End of trip facilities refer to facilities that support cycling at the end of a destination. This could include bicycle parking, showers / change facilities, and repair tools, for example. End of trip facilities, especially for non-residential uses, make active commuting a viable and attractive option, especially for employees who cycle longer distances or work split shifts. Mobility Scooter Parking Mobility scooter parking is not typically adequately provided in new developments. Consequently, those who use mobility devices end up parking them in their units, which takes up space and presents fire hazards. Specific ratio and design requirements for mobility scooter parking are important considerations in both residential and non- residential developments. Shared Micromobility Langford now has an e-bike and e-scooter sharing program that is available to residents and visitors. There is an opportunity to include new station locations in new developments (or near new developments) as a transportation demand management measure. Shared micromobility has been shown to reduce vehicle ownership and parking demand. Therefore, there is an opportunity to formalize the shared system as part of new developments to reduce off-street vehicle parking and to increase the overall shared micromobility ecosystem. Table 12: Recommended Active Transportation Regulations from Zoning Bylaw Example of Oversized Bike Parking Langford’s Bike Sharing Program (Kevin Hickman)
Page 76
PART 7 Implementation Strategy
Page 77
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 73 73 PART 7 Implementation Strategy Implementation Strategy The implementation strategy provides a roadmap outlining which active transportation projects should be pursued first. It also includes details on project phasing and costing. Determining which projects should be pursued first was informed by an evaluation exercise. 7.1 Active Transportation
Infrastructure Project Evaluation This plan identifies recommended active transportation infrastructure to be implemented within Langford. Implementation is intended to occur in phases, as not all projects need to be completed immediately and at the same time. Topic Description Existing Infrastructure There is currently no existing infrastructure, or the quality of the existing infrastructure along or near the corridor is poor. This suggests that a safe and comfortable option for users of all ages and abilities is not currently available for those choosing active transportation. Proximity to School The proposed active transportation infrastructure provides direct connections to nearby schools, offering safe and convenient travel options for students and their parents. Connection to Trip Generator / Key Destination Connecting active transportation infrastructure to high trip generators and key destinations can encourage more active transportation trips. Examples of trip generators include parks, recreation and community centres, shopping malls and commercial areas, and multi-family residential developments. High-level Capital Cost The anticipated capital cost of the project. Lower scores indicating a higher expected capital cost and higher scores indicating a lower expected capital cost (subject to more detailed costing). Safety and Comfort The speed and volume of motor vehicles are among the most significant factors influencing the use of active modes of transportation. Busier roads, such as arterials and collectors, may feel less comfortable and safe for walking, rolling, and cycling due to higher traffic speeds and volumes. However, these roads often provide the most direct connections to key destinations. For this reason, active transportation infrastructure located on or adjacent to busier roads should be prioritized over those on local or residential streets. Network Build-out Opportunities to fill gaps between existing infrastructure located around the city, including connecting to regional trails, multi-use paths, sidewalks, and/or other bicycle infrastructure. Projects that provide more direct access or connectivity to schools, build-out the existing network, connect to key destinations, and provide greater safety and comfort to the community have been prioritized for earlier implementation. A list of projects was developed for evaluation, including long-term bicycle infrastructure along major corridors, sidewalk infill projects that address significant network gaps, multi-use pathways and regional trail improvements, and major capital projects such as overpasses. This section provides a summary of the project evaluation and prioritization of the active transportation infrastructure. Table 13 below summarizes the project evaluation criteria. Table 13: Project Evaluation Criteria
Page 78
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 74 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 74 PART 7 Implementation Strategy Each criterion was scored on a scale from 1 to 5, where 1 represents a lower priority and 5 represents a higher priority. For example, under the “Existing Infrastructure” criterion, a project scored a “1” if the road / corridor already had all-ages-and-abilities active transportation infrastructure, indicating a limited need for new infrastructure. In contrast, a score of “5” was assigned if there was no infrastructure along most of the corridor, indicating a strong need for new infrastructure. Under the “Network Build-out” criterion, a score of “1” was assigned where a project does not connect to the existing active transportation network, indicating that the new infrastructure would be isolated, while a score of “5” was assigned where a project connects to one or more routes in the existing network, contributing to overall network expansion. Given the different types of active transportation infrastructure recommended for the network, and their unique characteristics, the overall scoring varied considerably. For example, a neighbourhood bikeway generally has a much lower capital cost compared to a multi-use pathway and therefore scored high on the “high-level capital cost” criterion. Conversely, a neighbourhood bikeway scored lower on the “safety and comfort” criterion compared to a multi-use pathway as most neighbourhood bikeways are recommended for local / residential ones where traffic volumes and speeds are lower compared to collector and arterial roads. While differences in project evaluation are expected between, for example, sidewalk infill projects and major regional trail improvements, all projects have been assessed using the same set of evaluation criteria. The project evaluation for the short-list of projects are provided in Table 14. Project / Location Infrastructure Type Priority Highway 1 Central Active Transportation Overpass Crossing / Overpass High Goldstream Avenue from Claude to Leigh Road Protected Bike Lanes and Sidewalk Infill High Goldstream Avenue from VMP to Claude Road Protected Bike Lanes High Jacklin Road Active Transportation Corridor: Goldstream to Station Avenue Protected Bike Lanes High Treanor Avenue Improvements Protected Bike Lanes High E&N Rail Trail Extension: Humpback Connector Regional Trails High City Centre Improvements Neighbourhood Bikeway / Painted Bike Lanes High Glen Lake Road (from Monnington Place to Parkdale Drive) Sidewalk and Bike Lanes High Langford Parkway (in front of City Centre Park and down Westhills Drive) Sidewalk High Latoria Road (from Happy Valley Road to Colwood Border) Sidewalk High Millstream Road (North of Treanor Avenue) Sidewalk High Table 14: Project Evaluation Results
Page 79
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 75 75 PART 7 Implementation Strategy Project / Location Infrastructure Type Priority Galloping Goose / Highway 14 (Sooke Road) Active Transportation Overpass Crossing / Overpass Medium Happy Valley Road from Latoria Road to Fashoda Place Multi-Use Path Medium Klahanie Drive Multi-Use Network Build-out Multi-Use Path Medium Luxton Road from Happy Valley Road to Lippincott Road Multi-Use Path Medium Setchfield Avenue Multi-Use Path Extension Multi-Use Path Medium Brock Avenue from Peatt Road to Matson Road Protected Bike Lanes Medium Highway 14 (Sooke Road) from Jacklin Road to Happy Valley Road Protected Bike Lanes Medium Jacklin Road Active Transportation Corridor: Station Avenue to Galloping Goose Protected Bike Lanes Medium Latoria Road from Happy Valley Road to Colwood Border Protected Bike Lanes Medium Leigh Road from Highway 1 to Goldstream Avenue Protected Bike Lanes Medium Galloping Goose Paving Regional Trails Medium Mill Hill Improvements Neighbourhood Bikeway / Painted Bike Lanes Medium Thetis Heights / Millstream Improvements Neighbourhood Bikeway / Painted Bike Lanes Medium Highway 14 (Sooke Road - from Happy Valley Road to Jacklin Road) Sidewalk Medium Jenkins Road (from Glen Lake Road to Jacklin Road) Sidewalk Medium Bear Mountain Parkway Multi-Use Path Multi-Use Path Low Goldstream Avenue Multi-Use Path Improvements Multi-Use Path Low Walfred Road Multi-Use Path Multi-Use Path Low
Page 80
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 76 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 76 PART 7 Implementation Strategy VMP / Goldstream Avenue intersection after accessibility improvements To improve intersection accessibility, major intersections throughout the city were evaluated to prioritize the locations where the highest need for accessibility improvements are needed. Ten intersections are recommended to be prioritized for upgrades based on the condition of existing infrastructure, their location and proximity to key destinations, and the expected volume of pedestrian crossings. These intersections are provided in Table 15. 7.2 Intersection Accessibility
Prioritization The priority for the identified intersection accessibility improvements varies by location. Short-term priorities are focused within the City Centre to align with the highest concentrations of growth and density, as envisioned in the OCP. Prioritization of accessibility improvements at other locations should be based on the anticipated benefits in enhancing conditions to make intersections more user- friendly for all ages and abilities. This list of intersection accessibility improvements is not exhaustive. Accessibility upgrades at intersections should be considered and implemented in coordination with other maintenance or capital works projects occurring at the same locations. VMP / Goldstream Avenue intersection before accessibility improvements
Page 81
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 77 77 PART 7 Implementation Strategy Intersection Recommended Accessibility Features Goldstream Avenue / Bryn Maur Road • TWSIs – letdowns and pedestrian refuge islands • Upgrade letdowns and crosswalk surface treatment Jacklin Road / Station Avenue / Dunford Avenue • Install accessible landings and sidewalks on the NE and SW corners • Upgrade letdowns • TWSIs and Audibles Jacklin Road / Langford Parkway • TWSIs – object and directional to assist with navigating pedestrian islands • Explore removing channelized right turn lanes • Audibles Goldstream Avenue / Peatt Road • TWSIs • Upgrade letdowns Peatt Road / Station Avenue • TWSIs – object and directional to assist with navigating pedestrian islands • Audibles VMP / Massie Drive / Hoffman Avenue • TWSIs and Audibles • Upgrade letdowns Leigh Road / Langford Parkway • TWSIs and Audibles • Upgrade and align letdowns with pavement markings Phipps Road / Langford Parkway • TWSIs and Audibles • Upgrade letdowns Jacklin Road / Kelly Road • TWSIs and Audibles • Upgrade letdowns Kelly Road / Merchant Way • TWSIs and Audibles • Improved accessibility for the island on east corner • Explore removing channelized right turn island Table 15: List of Top Recommended Intersection Accessibility Upgrades
Page 82
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 78 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 78 PART 7 Implementation Strategy Based on the project evaluation results, all projects have been assigned a project timeline The project timelines are as follows: • Short-term priority (1-5 years) • Medium-term priority (6-10 years) • Long-term priority (10+ years) In practice, funding availability, overall budget, planning priorities, and utility work or road upgrades may dictate project priority. However, the project phasing is intended to provide the City with guidance on overall priority based on the project evaluation that was completed as part of this plan. Note, there are several projects that scored “high” but are not recommended to be pursued in the short-term. These projects include the Highway 1 Central Active Transportation Overpass, the E&N Rail Trail Extension: Humpback Connector, and the protected bike lanes on Goldstream Avenue. These projects, while all high priority, will require a longer time horizon to be implemented. Factors such as project complexity, partnerships and collaboration with external agencies (e.g., Ministry of Transportation and Transit), and overall cost can all result in a high-priority project being scheduled for the medium or long term. For all high-priority projects, it is strongly recommended that work begin immediately, as the lead time from planning to design to final construction can take several years or more. High-level cost estimates were prepared for all proposed active transportation network projects. The total estimated capital cost for the select projects is approximately $11.6 million, with an additional $62.8 million associated with development-related or externally funded projects. Combined, these projects represent an estimated investment of more than $74 million. Note: Cost estimates are Level D and based on concept-level information using unit rates for linear works. These estimates include 20% for engineering, 15% for inflation, and a 10% contingency. Costs do not include property acquisition or other significant impacts. Actual implementation costs for each project may vary and will be confirmed through detailed design, procurement, and construction. 7.3 Timelines, Partnerships, and
Project Cost Table 16 shows all active transportation projects and includes three implementation factors: 1. Timeline (e.g., short-term, medium-term, and long- term) 2. Partnerships: There are many groups and parties within Langford and the larger West Shore that have a role to play in supporting, promoting, and building the active transportation network. This includes the CRD, MOTT, BC Transit, and neighbouring municipalities, among others. While the City is responsible for leading most active transportation improvements, several will require coordination with a partner(s) for successful implementation. 3. Class D Costing Coordinating with other City departments, such as Parks or Public Works, as well as external agencies like BC Transit, MOTT, the Island Corridor Foundation, or the Capital Regional District is critical for the effective delivery of the proposed projects. Aligning priorities and plans across both internal departments and external organizations helps coordinate infrastructure investments, avoid costly rework, and maximize the benefits of shared resources. For example, transportation upgrades can be timed to follow large-scale utility projects along the same corridor, allowing improvements to be incorporated into the restored design and avoiding additional construction that would disrupt the community. Similarly, improvements to regional trails can be coordinated with municipal cycling infrastructure projects to create a more connected network for cyclists. Lastly, transit-related upgrades, such as bus- only lanes or a future light-rail transit corridor, require coordination among multiple organizations and can be coordinated with other infrastructure improvements including active transportation infrastructure, trail crossings, and even new development.
Page 83
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 79 79 PART 7 Implementation Strategy Table 16: Project Priority, Timeline, and Partnerships Project / Location Infrastructure Type Priority Timeline Funding Source(s) Cost Capital Projects City Centre Improvements Neighbourhood Bikeway / Painted Bike Lanes High Short Capital $100,000 Treanor Avenue Improvements Protected Bike Lanes High Short Capital $900,000 Goldstream Avenue from VMP to Claude Road Protected Bike Lanes High Medium Capital $1,350,000 Thetis Heights / Millstream Improvements Neighbourhood Bikeway / Painted Bike Lanes Medium Medium Capital $140,000 Jacklin Road Active Transportation Corridor: Station Avenue to Galloping Goose Protected Bike Lanes Medium Medium Capital
- Grant $7,100,000 Jenkins Road (from Glen Lake Road to Jacklin Road) Sidewalk Medium Medium Capital $380,000 Brock Avenue from Peatt Road to Matson Road Protected Bike Lanes Medium Long Capital $385,000 Development-Related or External Funding Projects Jacklin Road Active Transportation Corridor: Goldstream to Station Avenue Protected Bike Lanes High Short DCC Road + Grant $6,400,000 Langford Parkway (in front of City Centre Park and down Westhills Drive) Sidewalk High Short Development
- Capital $80,000 Latoria Road (from Happy Valley Road to Colwood Border) Sidewalk High Short Grant (included in Latoria Active Transportation Upgrades) Millstream Road (North of Treanor Avenue) Sidewalk High Short Development $65,000 Glen Lake Road (from Monnington Place to Parkdale Drive) Sidewalk and Bike Lanes High Short Grant Funding $2,700,000 Goldstream Avenue from Claude to Leigh Road Protected Bike Lanes and Sidewalk Infill High Medium DCC Road $4,500,000
Page 84
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 80 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 80 PART 7 Implementation Strategy Project / Location Infrastructure Type Priority Timeline Funding Source(s) Cost Development-Related or External Funding Projects Highway 1 Central Active Transportation Overpass Crossing / Overpass High Long Grant + MoTT $10,000,000 E&N Rail Trail Extension: Humpback Connector Regional Trails High Long Development
- CRD + ICF $3,000,000 Happy Valley Road from Latoria Road to Fashoda Place Multi-Use Path Medium Short Grant Funding $970,000 Setchfield Avenue Multi- Use Path Extension Multi-Use Path Medium Short Grant Funding $600,000 Latoria Road from Happy Valley to Colwood Border Protected Bike Lanes Medium Short Grant Funding $10,300,000 Klahanie Drive Multi-Use Network Build-Out Multi-Use Path Medium Medium Grant Funding $2,200,000 Luxton Road from Happy Valley Road to Lippincott Road Multi-Use Path Medium Medium Grant Funding $400,000 Mill Hill Improvements Neighbourhood Bikeway / Painted Bike Lanes Medium Medium Development
- Capital $85,000 Galloping Goose Paving Regional Trails Medium Medium Grant + CRD $2,000,000 Galloping Goose / Highway 14 (Sooke Road) Active Transportation Overpass Crossing / Overpass Medium Long Grant + CRD + MoTT $8,000,000 Highway 14 (Sooke Road) from Jacklin Road to Happy Valley Road Protected Bike Lanes Medium Long DCC Road + MoTT $4,700,000 Leigh Road from Highway 1 to Goldstream Avenue Protected Bike Lanes Medium Long Development
- Capital $3,750,000 Highway 14 (Sooke Road - from Happy Valley Road to Jacklin Road) Sidewalk Medium Long CRD + MoTT $116,000 Goldstream Avenue Multi-Use Path Improvements Multi-Use Path Low Medium Grant Funding $200,000 Bear Mountain Parkway Multi-Use Path Multi-Use Path Low Long Development $2,200,000 Walfred Road Multi-Use Path Multi-Use Path Low Long Development $510,000
Page 85
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 81 81 PART 7 Implementation Strategy Project / Location Infrastructure Type Priority Timeline Funding Source(s) Cost Accessibility Projects Goldstream Avenue / Bryn Maur Road Accessibility Accessibility * Short Capital $120,000 Goldstream Avenue / Peatt Road Accessibility Accessibility * Short Capital $120,000 Jacklin Road / Station Avenue / Dunford Avenue Accessibility Accessibility * Short Capital $120,000 Leigh Road / Langford Parkway Accessibility Accessibility * Short Capital $120,000 Jacklin Road / Kelly Road Accessibility Accessibility * Medium Capital $120,000 Jacklin Road / Langford Parkway Accessibility Accessibility * Medium Capital $120,000 Kelly Road / Merchant Way Accessibility Accessibility * Medium Capital $120,000 Peatt Road / Station Avenue Accessibility Accessibility * Medium Capital $120,000 Phipps Road / Langford Parkway Accessibility Accessibility * Medium Capital $120,000 Veterans Memorial Park way / Hoffman Avenue Accessibility Accessibility * Medium Capital $120,000 *Note: Intersection accessibility improvements may be installed when the intersections are undergoing maintenance or other upgrades
Page 86
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 82 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 82 PART 7 Implementation Strategy 7.3.1 Potential Quick Build Projects Quick build projects are temporary, low-cost solutions that can be implemented rapidly to pilot potential permanent changes across the network (see Section 5.5 for a more detailed definition). Among the projects identified in this ATP, the following list highlights potential candidates for quick build implementation within the next one to two years. • Happy Valley Road Multi-Use Pathway from Lobo Vale to Fashoda Place – the first piece of this quick build project was completed in 2025 from Lobo Vale to Latoria Road and could be extended to the south, improving active transportation connections in the area. • Setchfield Avenue Multi-Use Pathway Extension – the existing bike lane and unpaved walking infrastructure on Setchfield Avenue could be combined with a layer of asphalt and new protected curb plunks to provide physical separation from the travel lane. • City Centre / Mill Hill Improvements – rapid implementation of traffic calming and speed reduction techniques to create neighbourhood bikeways within the City Centre and in the Mill Hill Neighbourhood. • Goldstream Avenue Protected Bike Lanes from Claude Road to Leigh Road – building on the previously installed protected bike lanes near Jacklin Road, there is an opportunity to extend the curb plunk bike lanes, providing an east to west connection for cyclists into the City Centre along Goldstream Avenue. • Jacklin Road Protected Bike Lanes from Goldstream to Station Avenue – connecting the Goldstream Avenue protected bike lanes down to the E&N Rail Trail, a quick build facility—using curb plunks, delineators, or planter boxes, for example— would allow for this connection to be integrated to the network prior to implementing a more permanent solution in the longer term. • Treanor Avenue Protected Bike Lanes – connecting the Bellamy multi-use pathway and Millstream Elementary over to Lakewood Elementary with protected bike lanes along Treanor Avenue, providing residents and student cyclists with a higher level of comfort and protection across Millstream Road. Curb plunks would be a suitable material / separation type along this corridor. • Glen Lake Road Sidewalk Infill – a temporary paved asphalt or packed gravel walking surface could be installed to provide residents with walking infrastructure in the short-term, before a more formal sidewalk with curb and gutter is installed in the long-term. Quick build multi-use pathway on Happy Valley Road
Page 87
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 83 83 PART 7 Implementation Strategy 7.4 Funding Opportunities Plans, such as this Active Transportation Plan, can generally identify the appropriate actions needed to achieve their goals, but these actions are often implemented too slowly to properly address the urgency of the crises that are faced. Growth in active transportation and public transit infrastructure, and the corresponding mode shift, cannot continue to follow a “business as usual” pace, which has historically been insufficient to achieve meaningful change. The timeframes in this plan should be considered “at the latest” speeds, not targets, with every effort made to accelerate implementation and achieve mode shift more quickly by addressing barriers that have limited progress in the past. The implementation of the ATP will largely be contingent on how well it is funded. Whether for an e-bike incentive program, wayfinding and signage, educational initiatives, or infrastructure, securing funding is critical to advancing Langford’s future active transportation network. Certain identified transportation improvements that are required or triggered solely as a result of a specific development, or that primarily benefit a single development, may be considered as conditions of rezoning for that development, which would be directly paid for by the developer. Otherwise, both internal funding sources and external grants or programs can help support the implementation of the recommended ATP improvements, as outlined below. 7.4.1 Internal Funding Sources The following sources are available to help pay for new active transportation infrastructure including crossing and accessibility improvements. Development Cost Charge (DCC) Program DCCs are a way for Langford to collect funds to improve infrastructure that will support projected development over a specified time horizon, under the provisions of the Local Government Act. DCCs may be collected by the City for improvements to roads, including active transportation infrastructure. Capital Works Reserve Fund As part of the 2026 capital budget, Langford has a total of $550,000 in its Capital Works Reserve Fund to pay for active transportation infrastructure and neighbourhood improvements. The Capital Works Reserve Fund is a dedicated fund that finances major capital projects. Direct Development Requirements Some road and active transportation projects are linked to adjacent developments. These projects are required as part of those developments and are funded directly by the nearby developers. 7.4.2 External Grant Funding Sources There are also a range of external funding sources available to help pay for new active transportation infrastructure including crossing and accessibility improvements. They are described as follows. Canada Community-Building Fund (CCBF - Previously Know as Gas Tax) A total of approximately $3,800,000 is available from Langford’s CCBF in 2026. This fund provides predictable, long-term funding for local governments and may be used for a wide range of eligible projects. Council determines how these funds are allocated, including toward active transportation infrastructure such as multi- use paths, protected bike lanes, and pedestrian bridges. Local Government Climate Action Program The Local Government Climate Action Program (LGCAP), which launched in 2022, provides predictable, long-term funding for communities to support local climate action to reduce emissions and prepare for the impacts of a changing climate. The program has several eligibility requirements including the need for a specific project to be linked to one more objectives outlined in the CleanBC Roadmap to 2030 and/or the Climate Preparedness and Adaptation Strategy. The CleanBC Roadmap to 2030 is more relevant to the ATP than the TMP; specifically, the LGCAP supports several different transportation infrastructure / policy changes including “active transportation plan or investments, secure bike parking, commute reduction programs, transit/pedestrian-oriented development regulation, trip reduction programs, mode shift targets in Official Community Plan and/or Regional Growth Strategy.” A total of $24.456 million will be available annually and will be allocated to local governments and Modern Treaty Nations under the new LGCAP program. The annual funding allocation varies depending on the community’s population size. The LGCAP website provides more detail on the eligibility requirements but in general, several of the recommended projects in the ATP would be eligible for funding, especially those that help Langford lower its greenhouse gas emissions.
Page 88
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 84 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 84 PART 7 Implementation Strategy The Local Government Climate Action Program could be a strategic funding opportunity for Langford has it undertakes the Climate Action Plan. Both the Climate Action Plan and the ATP could position Langford to receive additional funding from the province. BC Active Transportation Infrastructure Grant Program Langford has previously been successful in securing funding through this grant program. In 2024, a grant was received to help pay for the intersection improvements at Goldstream Avenue and VMP, and in 2025, additional funding was received for active transportation improvements along Latoria Road. The program was paused in fall 2025 as part of a broader review of all CleanBC programs. While it remains uncertain whether the program will be reinstated, the City of Langford is well positioned to build on its past successes and pursue future funding opportunities should the program become available again. Historically, the program has prioritized projects that are “shovel-ready” or nearing implementation. By continuing to advance the planning, design, and public engagement for priority transportation projects, Langford can position itself to pursue future funding opportunities should the program be reinstated. As program requirements and funding levels may change following the provincial review, the City should monitor future announcements and align project development accordingly. Maintaining a pipeline of implementation-ready projects will enable the City to respond quickly if the program is reintroduced in a revised form. Federal Active Transportation Fund The Government of Canada’s Active Transportation Fund supports planning and capital projects that make walking, cycling, rolling, and other forms of active transportation safer, more accessible, and more convenient. The program funds initiatives such as multi-use pathways, cycling infrastructure, pedestrian improvements, accessibility enhancements, and active transportation network planning to help communities reduce emissions, improve public health, and increase transportation options. The fund is intended to support the development of connected active transportation networks that link residents to key destinations including schools, parks, transit hubs, and commercial areas. Funding for capital projects can be obtained with contributions of up to $50 million per project. Vision Zero BC The BC Vision Zero in Road Safety Grant Program offers up to $20,000 per project to enhance the safety of all road users, including pedestrians and cyclists. These funds can be used for infrastructure improvements, policy or enforcement initiatives, educational campaigns, or other innovative projects that promote safer and more equitable travel around the community. ICBC Road Improvements Project ICBC provides funding for road improvements including pedestrian and cycling infrastructure to help to reduce crashes, improve safety, and reduce claims costs to ICBC. Funding is available through the following programs: • ICBC’s Road Improvement Program • Speed Watch Program (through the Community Policing Centres) • Speed and Intersection Safety Program • Counter Attack Program • Operation Red Nose Program • Road Sense Speaker Program for Schools Langford has received substantial funding from ICBC in recent years to support transportation safety improvements. One example is the funding provided for the Amy Road / West Shore Parkway roundabout project in 2022.
Page 89
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 85 85 PART 7 Implementation Strategy 7.5 Monitoring and Evaluation The objectives, goals, and strategies outlined in this ATP and the accompanying TMP can only be achieved if they are effectively measured. The success of these plans depends on regular monitoring and evaluation to help the City assess its progress in implementing the actions identified. Specifically, the plan objectives and targets need to be monitored closely. Ongoing evaluation will also enable the City to track how well it is allocating financial and staffing resources towards implementing the plan’s recommendations, including the infrastructure improvements and policies / programs. Table 17 includes a summary of each plan objective, its associated target, and different indicators that can be used to track progress. The targets and performance indicators are intended to be consistent across both the TMP and the ATP, as the two plans work together to guide the development and improvement of the City’s long- term transportation network. Beyond this monitoring and evaluation framework, it is recommended that the City: 1. Complete an annual Active Transportation Report Card to provide a snapshot of how the City is progressing on the implementation of the ATP. • The District of Saanich has been completing annual report cards of its ATP since 2019, and it serves as a useful framework. 2. Review the ATP every 5 years as a “check-in” to assess what has been implemented and what remains outstanding, comparing progress against the short-, medium-, and long-term timelines identified in the plan. Example of Saanich’s Annual Active Transportation Report Card (District of Saanich)
Page 90
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 86 CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 86 PART 7 Implementation Strategy Table 17: Monitoring, Measuring, and Evaluating the Success of the ATP Plan Objective Targets Performance Indicator Integrate land use planning with transportation planning. • Ensure all areas of Langford’s City Centre and Urban Centers have a Walk Score of 70 or higher. • Achieve 42% of all trips made by walking, rolling, cycling, and/or public transit. • Commuter mode share percentage for walking, cycling, and transit. • Mode share percentage for all trip purposes for walking, cycling, and transit. • Overall Walk Score within City’s main growth areas including City Centre, Urban Centers, and Corridors. • Average parking stall to unit ratio for new residential developments. • Percentage of new developments providing AAA-rated secure bike parking, on-site maintenance facilities, carshare programs, or participation in the BC Transit EcoPASS program. Design the transportation network to provide safe mobility options and general accessibility that serve all ages and abilities. • Zero serious injuries and/or fatalities for those who use active transportation modes. • All intersections and roundabouts within the City Centre are retrofitted with accessibility improvements. • ICBC reported vehicle collisions involving people walking (5-year average). • ICBC reported vehicle collisions involving people cycling (5-year average). • Percentage of traffic signals with tactile walking surface indicators (TWSIs). • Percentage of traffic signals with audible pedestrian signals. • Number of leading pedestrian intervals installations. • Length of new AAA bicycle and multi- use infrastructure . Develop a transit network that emphasizes ridership in collaboration with our key partners. • Double transit ridership from the 6,500 average daily boards that Langford sees today. • In partnership with BC Transit, provide at least two Rapid Transit routes serving Langford residents. • All bus stops are designed for accessibility that meet BC Transit’s Infrastructure Design Guidelines. • Commuter mode share percentage taking transit. • Transit mode share percentage for all trip purposes. • Total transit service hours. • On-time performance and service reliability for bus stops within the city. • Boarding/alighting at bus stops. • Percentage of bus stops in Langford equipped with shelter, seating, and wayfinding information.
Page 91
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 87 87 PART 7 Implementation Strategy Plan Objective Targets Performance Indicator Minimize the climate impact of the transportation network. • Achieve 42% of all trips made by walking, rolling, cycling, and/or public transit. • • Provide electric vehicle charging stations in all major commercial, institutional, and recreational parking lots. • Reduce the City’s corporate emissions by 50% by 2030; achieve net zero by 2050. • Percentage of GHG emissions in the transportation sector (community and corporate). • Queue lengths and delay along major corridors within the city. • Mode share for transit, walking, and cycling within the city. • Number of available electric vehicle chargers throughout the city. • Number of registered carshare and bike/scooter share users in the city. • Average commuter trip vehicle occupancy. Maximize the economic productivity of the transportation system by emphasizing movement and efficiency. • Provide at least one general loading stall for each block in the City Centre. • Achieve an overall reduction in vehicle delay at the intersections for the city’s major corridors. • Achieve an average year-by-year increase of 2% for pedestrian traffic within the City Centre. • Number of loading stalls in the City Centre. • Level of service and vehicle delay at intersections. • On-street parking turnover within the City Centre. • Pedestrian activity within the City Centre and commercial areas. • Total gross floor area (GFA) of ground-floor commercial space in new mixed-use buildings within the downtown core.
Page 92
PART 8 Next Steps
Page 93
CITY OF LANGFORD | ACTIVE TRANSPORTATION PLAN 89 89 PART 78 Next Steps Next Steps The City of Langford ATP is a foundational document that provides a strategic, long-term roadmap for advancing active transportation infrastructure, policies, and programs. The ATP presents a future network that supports walking, rolling, and cycling for people of all ages and abilities for a city that is aiming for 100,000 people. The implementation strategy provides a roadmap for action. Ultimately, the City will need to decide which projects it pursues first. Some are low-hanging fruit, while others are more costly and will require close collaboration and coordination with external partners and agencies. Regardless of which projects are pursued first, implementation is critical to start to move the needle on active transportation. Adopting active transportation policies and programs, getting infrastructure built, and creating a stronger culture around active transportation can collectively provide greater mobility choice and— gradually—create a more connected, multi-modal transportation system that improves the lives of Langford residents today, and for many years to come.





















































































































Document Images
(16)
extracted visual asset on page 1

extracted visual asset on page 1

extracted visual asset on page 1

extracted visual asset on page 1

extracted visual asset on page 1

extracted visual asset on page 3

extracted visual asset on page 13

extracted visual asset on page 13

extracted visual asset on page 13

extracted visual asset on page 13

extracted visual asset on page 13

extracted visual asset on page 42

extracted visual asset on page 42

extracted visual asset on page 42

extracted visual asset on page 43

extracted visual asset on page 43