Staff Report – Grant Application: Irwin Dam Improvements (Engineering)
Engineering staff report recommending submission of a grant application for Irwin Dam improvements.
Key facts
- Agenda item: 9.h
- Project: Irwin Dam improvements
- Action: Grant application recommendation
Staff Report – Grant Application: Irwin Dam Improvements (Engineering)
2nd Floor · 877 Goldstream Avenue · Langford, BC Canada · V9B 2X8
T · 250-478-7882 F · 250-478-7864
to
Council
Date:
August 20, 2018
Department:
Engineering
Subject:
Grant Application – Irwin Dam Improvements
Background
The National Disaster Mitigation Program (NDMP) is a suite of funding programs intended to reduce the risks and impacts of flooding on Canadians. The program is administered on behalf of the province by the Disaster Mitigation Branch of Emergency Management BC (EMBC).
The funding streams include:
- Risk assessments
- Flood mapping
- Mitigation planning
- Small scale structural works (less than $3Million in government funding)
- Non structural mitigation works
The purpose of this report is to seek Council approval to apply for a grant under the NDMP program for Stream 4 the small scale structural works.
Commentary
The maximum grant allowable is $1,500,000, the project must be completed by March 2020 and the allowable grant can cover up to 100% of project costs.
Staff are suggesting that the City apply for a grant in the category of Stream 4 the small scale structural works for improvements to the Irwin Dam located adjacent to Irwin Road related to flood proofing for earthquake stability. The grant requires a motion of Council to support the application.
Financial Implications
The funding shares are 50% federal/50% provincial costs, with no contribution required from the City if the application is accepted.
Eligible costs upon successful receipt of a grant include: consultant/or contractor costs, applicant staff and administration costs.
The cost to prepare the grant is not eligible. Staff will require assistance from a geotechnical engineering firm with design elements and costing for the grant application. The Engineering Department retained Ryzuk Geotechnical to undertake the design of the proposed improvements which were also the subject of a prior grant application. Ryzuk staff will be available to aid in preparation of this application.
Legal Implications
None noted.
Options
That Council:
- Direct staff to apply to the National Disaster Mitigation Program for the Irwin Dam Improvements;
OR - Direct staff not to apply for a grant at this time.
Respectfully submitted,
Submitted by:
Michelle Mahovlich, P.Eng. , P.Geo. Director of Engineering
Concurrence:
Audrey Kryklywyj, Deputy Director of Finance
Concurrence:
George Henshall, AScT Deputy Director of Engineering
Concurrence:
Darren Kiedyk, Chief Administrative Officer
:mm