DocumentsStaff ReportApr 18, 2017Pages 92–94
Staff Report (Engineering) — Pre-Award Approval for Millstream Overpass Dual Left Turnlane Project
Engineering staff report requesting pre-award approval for works to add a dual left turnlane at the Millstream Overpass.
Key facts
- Agenda page listing: p.92
- Department: Engineering
- Project: Millstream Overpass Dual Left Turnlane — pre-award procurement and funding implications
Staff Report (Engineering) — Pre-Award Approval for Millstream Overpass Dual Left Turnlane Project
Date: April 18, 2017
Department: Engineering
Subject: Pre Award Approval for Millstream Overpass Dual Left Turnlane Project
Background
The Millstream Interchange currently consists of two on-ramps and two off-ramps. The existing bridge deck consists of one southbound left turnlane heading onto the Trans Canada Highway (TCH) towards the City of Victoria as well as three southbound thru lanes. The southbound access to the TCH is often backed up during peak travel times and on weekends. The purpose of this report is to gain Council pre-approval to award the construction contract for safety and traffic flow improvements in this area.
Commentary
The City has been working with design team of Tetra Tech, PBX, Watt Consulting and Raylec to design the improvements to the Millstream interchange.
The City tendered the Millstream Interchange Dual Left Turnlane project to BC Bid the week of April 10th, 2017. The tender is slated to close Wednesday May 10th, 2017 and is subject to the City of Langford Council approval for construction award.
Staff are looking for Council pre-approval to award the construction contract to the lowest bidder assuming the bid is compliant to the tender specifications and no errors are found in the bid.
Construction timing on this project is critical due to traffic volumes in the general area and to weather constraints. The ideal construction timeframe is June/July/August with completion by Labour Day Weekend. Traffic volumes in general increase once school is back in session after the Labour Day weekend. Traffic volumes also increase notably in the early Fall approaching the Christmas shopping period in this area. Additionally the City does not want the project to creep later into the Fall when weather can be a challenge for any paving, concrete pouring or line painting.
The project includes:
- Improved pedestrian and cycling safety with fully extended sidewalks, bikelaneds and signalized pedestrian crossings at all notable intersections;
- Addition of the second left turnlane southbound onto the Trans Canada Highway; and
- Installation of an additional signal light required on the northbound left turnlane on the bridge deck, turning north to the Trans Canada Highway (Duncan/Nanaimo).
Financial Implications
This is a City of Langford initiative funded entirely by the City of Langford Road Development Cost Charge program with some funding from ICBC. This project is already contained in the 2017 Capital Projects budget for the City’s Engineering Department.
Legal Implications
None noted. The entire project can be completed within the existing road right of way.
Options
That Council:
Direct staff to award the construction contract for the Millstream Interchange Dual Left Turnlane project to the lowest bidder who is in compliance with the tender documents and fund the project through the City’s Road Development Cost Charge program;
ORNot award the contract at this time.
Respectfully submitted
Submitted by:
Michelle Mahovlich, P.Eng. P.Geo., Director of Engineering
Concurrence:
Matthew Baldwin, MCIP, RPP Director of Planning
Concurrence:
Bob Beckett, Fire Chief
Concurrence:
Lorne Fletcher, Manager of Community Safety and Municipal Enforcement
Concurrence:
Mike Leskiw, Parks and Recreation Manager
Concurrence:
Leah Stohmann, MCIP, RPP, Deputy Director of Planning / Approving Officer
Concurrence:
Steve Ternent, Director of Finance
Concurrence:
Braden Hutchins, Director of Corporate Services
Concurrence:
Jim Bowden, Chief Administrative Officer
Concurrence:
Darren Kiedyk, Deputy Chief Administrative Officer
:mm