Irwin Road trail realignment
ApprovedA 3-metre-wide asphalt trail was planned along Irwin Road between Meridian Road and 2955 Irwin Road, alongside a road realignment, crosswalk and pedestrian landing at Meridian. The estimated $60,000 cost was to come from road development charges.
Where it stands: Trail design and installation approved Apr 15, 2019, with an estimated $60,000 from road development charges.

Timeline
Every time this matter appeared in council records, newest first.
Council approves Irwin Road trail, road realignment and crosswalk
Council approved design and installation of a realignment and 3.0m asphalt trail on Irwin Road at an estimated cost of $60,000 funded from Road DCCs.
Decision: Approved Irwin Road 3.0m asphalt trail realignment and crosswalk at estimated $60,000 from Road DCCs.
Passed