This site is in beta — data may be incomplete and features are still being added.

DocumentsAgendaNov 21, 2023Pages 64–190

Remaining Agenda & Attachments (rest of PDF)

Remaining agenda items and attachments for the Council meeting (continuation of reports, bylaws, supporting materials and appendices not included in pages 1-63).

Key facts

  • Covers remaining reports (e.g., 10.1 RCMP Detachment Expansion Project Financing Update; 10.2 Lane Closure at 2826 Jacklin Rd; 10.3 2023-2027 Draft Council Strategic Plan; 10.4 Proposed 2024 Council Meeting Dates; 10.5 Public Spaces Bylaw Amendments)
  • Bylaws listed later in agenda include: Bylaw No. 2035, 2099, 2133, 2152, 2153
  • PDF total pages: 190 (this entry covers pages 64–190 not expanded in the locally provided extract)

Remaining Agenda & Attachments (rest of PDF)

Page 64–190

Page 64

Goldstream Gazette www.goldstreamgazette.com A14 Wednesday, November 15, 2023 http://Zoom.us/ Notice of Intention to Consider Issuance of a Temporary Use Permit Council for the City of Langford hereby gives Notice of Intention to consider issuance of a Temporary Use Permit at its Regular Meeting scheduled for 20 November 2023, at 7 pm. This meeting is being held electronically and with in-person attendance. File Temporary Use Permit No. TUP19-0004 Purpose The purpose of the proposed Temporary Use Permit is to allow Honeycomb Cannabis Inc. to continue to operate a non-medical cannabis retail store Applicant Honeycomb Cannabis Inc Location The land that is the subject of TUP19-0004 is 107-2317 Millstream Road Teleconference # 1-855-703-8985 (Canada Toll Free) OR 1-778-907-2071 (long distance charges may apply) Meeting ID #897 0956 7061 / Zoom.us or Zoom app on your mobile device The Agenda, including the material that Council may consider in relation to the temporary use permit, will be uploaded to our website: Council & Committee Meetings - City of Langford no later than the Friday before the meeting. Correspondence may be submitted by emailing planning@langford.ca or by writing to Langford City Hall, 2nd Floor, 877 Goldstream Avenue, Langford, BC, V9B 2X8. You may also contact the Planning Department at (250) 478-7882. Marie Watmough Corporate Officer The purpose of this Notice is to acquaint the property owners and residents in the area with the specifics of the proposed temporary use permit. Should you wish to make a submission to the Council in writing we require your name and civic address and that this be received, either electronically or by mail, by noon on the Tuesday prior to the meeting date to be included in the agenda. Correspondence received after that date will be circulated to the Council the day of the meeting and uploaded to the website as an “Addendum Package” the day after the meeting. You may also speak at the Council Meeting during the Public Participation Section of the meeting. PLEASE NOTE: Information about how to connect to this meeting electronically is indicated in the table below: 250.391.2801 Ravi.Parmar.MLA@leg.bc.ca #122-2806 Jacklin Road, Langford MAJOR EXPANSIONS (380 SEATS) COMING TO RUTH KING AND DAVID CAMERON ELEMENTARY SCHOOLS www.RaviParmar.com Langford adopting Horokhiv, Ukraine as a sister city Thomas Eley News Staff Langford and Horokhiv in Ukraine will become sister cities after the city council ap- proved a motion to formalize the relationship on Nov. 7. The motion would include funding of $7,500 that the mayor of Horokhiv would use to purchase resources for stu- dents participating in science, technology, engineering, arts and math programs. A sister city relationship can be similar to that of a pen pal, said Langford Mayor Scott Goodmanson. “It can be as involved or re- laxed as you want. I tell people to think of it like any of your interpersonal relationships. Some people you talk to every day and some new talk to you once a year,” he said. Area residents Bruce Brown and Bob Beckett initially set up the move to formalize these re- lations between Langford and Horokhiv. “Langford has a history of seeing the bigger picture with global events,” said Brown. “The community has been un- believable in supporting these projects with large donations.” There had been some debate in the chamber among mem- bers of the public about wheth- er or not this was a political ploy, which Brown dismissed. “You will never see my name on an election poster. I am not running for anything,” he said. The motion was approved by almost all council members, with council member Keith Yacucha being the dissenting vote. “I look at our community and how many great commu- nity groups we had to turn down funding for grant and aid requests, and there was money that was going to be spent here in our communi- ties,” said Yacucha. He said he did not want to diminish the work done by Beckett and Brown, but did not support the city becoming involved with foreign affairs. Coun. Mary Wagner said while she agreed with what Yacucha had been saying, she would support the motion to send money and formalize the sister-city relationship. “This is not just a normal sending of charity money. It does feel like a special case. This is an unusual situation where Mr. Beckett, Mr. Brown and other people in the com- munity have been working at this for years.” Wagner said that it makes sense to support supplying Beckett and Brown with the funds that they have asked for as it strengthens the bond be- tween Langford and Horokhiv. Coun. Kimberley Guiry hoped the relationship between Langford and Horokhiv would be a lasting one. “It is a very complex world right now and the disparity that we see in our fellow human beings around the world makes it hard to sit without privilege here and not be compelled to do something,” she said. She said that hopefully the agreement between the two cities would stretch long into the future and the benefits of this new arrangement would continue to benefit everyone in Langford. The funding will not be able to help everyone, said Good- manson, but it will benefit stu- dents that Beckett and Brown are trying to assist. “Think globally, act locally. There are any number of coun- tries closer that could send help. But just because we’re at a distance doesn’t mean we shouldn’t do our part in the conflict.” Horokhiv and Langford will become sister cities after the city council votes in favour of the motion. (Paul Henderson/ Chilliwack Progress) Page 64 of 190

Page 64–190

Page 65

Page 1 of 1 CITY OF LANGFORD TEMPORARY USE PERMIT

TUP20-0006 – 988 McCallum Road

That Temporary Use Permit No. TUP20-0006 be issued by the Council for VCMMC to Graham Harrison to allow for additional Victoria Contracting & Municipal Maintenance Corporation employee parking at 988 McCallum Road, subject to the following terms and conditions:

  1. Conditions

The following conditions are imposed pursuant to section 493 of the Local Government Act: a) That only the portion of the property indicated in Figure 1 may be utilized for the employee parking; b) That all recommendations of the Environmental Professional Opinion Memorandum prepared by Craig Barlow, RPBio, are implemented and adhered to through the term of use for employee parking; and c) That the lot is not used for parking of large automobiles related to the nearby work site and is only limited to personal vehicles of staff.

Page 65 of 190

Page 64–190

Page 66

Notice of Intent City Hall Council Chambers Third Floor, 877 Goldstream Avenue

This meeting will be held electronically and in person at the above address. Information on how to participate in this meeting is listed below. MEETING DATE:

STARTING AT:

20 November 2023 7:00PM

How to Connect: Teleconference # 1-855-703-8985 (Canada Toll Free) 1-778-907-2071 (long distance charges may apply)

Zoom.us or Zoom app on your mobile device Meeting ID #897 0956 7061

File No: TUP20-0006

Location: 988 McCallum Road, as shown shaded on the attached map

Zoning: R2 (One- and Two-Family Residential)

Purpose: To allow for Victoria Contracting & Municipal Maintenance Corporation employee parking at 988 McCallum Road for an additional three years 2nd Floor, 877 Goldstream Avenue, Langford, BC V9B 2X8 | t 250.478.7882 IMPORTANT – COUNCIL MEETING NOTICE OWNER/OCCUPANT Read the Report: Langford.ca/city-hall/public-notices or contact City Hall to make an appointment to view the report in person (8:30am-4:30pm Monday to Friday, excluding holidays). Ask Questions or Email: planning@langford.ca Submit Questions: Mail: City of Langford

You must include your name and civic address. Submissions must be received by noon on the Tuesday prior to the council meeting to be included in the agenda. Correspondence received after that date will be circulated to the committee the day of the meeting and uploaded to the website as an “Addendum Package” the day after the meeting. Speak at the Meeting: Participate by phone or via Zoom app, or in person—see the website for more information. Watch the Meeting: View in the Zoom app, or watch the recording at Langford.ca Personal Information: All submissions will be published, including your name and address. For more information on this collection and disclosure, go to Langford.ca/privacy. 2nd Floor, 877 Goldstream Avenue, Langford, BC V9B 2X8 | t 250.478.7882

Page 66 of 190

Page 64–190

Page 67

Goldstream Gazette Wednesday, November 8, 2023 A9 www.goldstreamgazette.com Langford wants input on urban forests plan Tanara Oliveira News Staff The City of Langford has taken a step for- ward in shaping the future of its urban land- scape with the launch of a public engagement initiatives for the inaugural Urban Forest Man- agement Plan (UFMP). This plan is poised to outline Langford’s 25-year vision and values for urban forest man- agement, addressing the challenges faced by the city’s urban trees and their maintenance. Langford’s residents are invited to participate in an open house event scheduled for Nov. 15 from 5 p.m. to 8 p.m. at City Hall located at 877 Goldstream Ave. Residents are encouraged to visit LetsChat- Langford.ca until Nov. 27 to complete the survey and contribute their valuable insights to the formulation of the city’s UFMP. The UFMP is set to encompass a range of objectives that will guide the city in preserv- ing and enhancing its urban canopy. It will feature an array of tailored actions to bring the community’s vision for its urban forest to life. The UFMP will provide a crucial baseline assessment of Langford’s current urban forest condition, presenting a roadmap for future program goals, recommendations, targets, operational plans, and policies to support its implementation. “Langford council recognizes the significance of Langford’s urban forest and wishes to for- malize its protection and management through the creation of the city’s first Urban Forest Management Plan,” said Langford Mayor Scott Goodmanson, in a news release. “This plan will provide guidance to city staff and council during future decision-making related to development, infrastructure improvements, and parks planning. I encourage all Langford residents to participate in the public engage- ment initiatives taking place over the coming months as the UFMP is developed to ensure the plan truly reflects the needs of the greater community.” The initial phase is designed to solicit com- munity input and insights for the impending draft plan. The second phase, slated for spring 2024, will be dedicated to gathering feedback on the drafted UFMP. Several ways to engage the city Langford wants public input on area forests. (Unsplash.com photo) We are buying all Gold and Silver at Victoria’s CASH FOR GOLD BEST PRICES Open Daily 10am to 5pm www.westshoregoldandsilver.ca 730 Goldstream Ave,Langford (778) 406-0606 http://Zoom.us/ Notice of Intention to Consider Issuance of a Temporary Use Permit Council for the City of Langford hereby gives Notice of Intention to consider issuance of a Temporary Use Permit at its Regular Meeting scheduled for 20 November 2023, at 7 pm. This meeting is being held electronically and with in-person attendance. File Temporary Use Permit No. TUP20-0006 Purpose The purpose of the proposed Temporary Use Permit is to allow Victoria Contracting & Municipal Maintenance Corporation (VCMMC) employee parking at 988 McCallum Road for an additional term of three years Applicant VCMMC Location 988 McCallum Road Teleconference # 1-855-703-8985 (Canada Toll Free) OR 1-778-907-2071 (long distance charges may apply) Meeting ID #897 0956 7061 / Zoom.us or Zoom app on your mobile device The Agenda, including the material that Council may consider in relation to the temporary use permit, will be uploaded to our website: Council & Committee Meetings - City of Langford no later than the Friday before the meeting. Correspondence may be submitted by emailing planning@langford.ca or by writing to Langford City Hall, 2nd Floor, 877 Goldstream Avenue, Langford, BC, V9B 2X8. You may also contact the Planning Department at (250) 478-7882. Braden Hutchins Director of Corporate Services The purpose of this Notice is to acquaint the property owners and residents in the area with the specifics of the proposed temporary use permit. Should you wish to make a submission to the Council in writing we require your name and civic address and that this be received, either electronically or by mail, by noon on the Tuesday prior to the meeting date to be included in the agenda. Correspondence received after that date will be circulated to the Council the day of the meeting and uploaded to the website as an “Addendum Package” the day after the meeting. You may also speak at the Council Meeting during the Public Participation Section of the meeting. PLEASE NOTE: Information about how to connect to this meeting electronically is indicated in the table below: Page 67 of 190

Page 64–190

Page 68

Janelle Breese Bi- agioni feels she and her husband were not given the support they needed after he suffered a traumatic brain injury in 1990. Breese Biagioni was speaking at news con- ference last month in support of Private Member’s Bill C-277, the National Strate- gy on Brain Injuries Act, which was in- troduced by Alistair MacGregor, MP for Cowichan-Mala- hat-Langford. The bill calls for a national strategy on brain injuries that aims to support the more than 1.5 mil- lion Canadians who are suffering from a brain injury. Breese Biagioni said her husband was a police officer who sustained a traumatic brain injury when he was in an accident on a police motorcycle, and died five months later. She said that during those five months, her husband experienced significant anxiety and depression and there were no inter- ventions available to help him at that time. “Through the three decades I’ve been in- volved (in working with brain injury is- sues), I’ve advocated locally, provincially and nationally for more supports for people with brain injuries,” said Breese Biagioni, who is the founder of CGB Cen- tre for Traumatic Life Losses. “Every one of them has experienced pro- found grief, despair, anxiety and depres- sion, and many of them have gone down the rabbit holes of self medication leading to strong addictions, and some have been home- less, and some have been incarcerated.” Breese Biagioni said brain injuries are at the forefront of the nation’s opioid and homelessness crises, and if the nation is going to address these issues without addressing brain in- juries and having a national strategy to deal with them, then the efforts to deal with these crises are mov- ing forward with one of the main puzzle pieces missing. The proposed na- tional strategy in- cludes promoting the implementation of preventive measures to reduce risk; iden- tifying the training, education and guid- ance needs of health care professionals; promoting research and improving data collection; creating national guidelines on the prevention, diagnosis, and man- agement of brain in- juries; encouraging the use of consulting psychologists to cre- ate a national support system; and develop- ing and maintaining a government website to provide current facts, research, and best practices. Dr. Alexis Turgeon, with the Canadian Traumatic Brain In- jury Research Con- sortium, said brain injuries among the younger population are often due to auto accidents, while falls are one of the reasons many older people get brain injuries. But, however they get their brain inju- ries, he said it changes the lives of all these people emotionally, psychologically, phys- ically and sometimes their behaviour. “It affects the indi- vidual, but also their families, friends, and the whole environ- ment that surrounds them,” Turgeon said. “Bill C-277 is para- mount here. It’s time for a call to action and our consortium strongly supports this bill.” MacGregor said he has learned over the years that people with brain injuries need help and that’s one of the reasons that he, as an MP, was proud to put the idea of a na- tional strategy into ac- tion in the form of his private member’s bill. Goldstream Gazette www.goldstreamgazette.com A18 Wednesday, November 15, 2023 WING’S RESTAURANT TAKE OUT Combination Dinners for 1 to 8 Seafood and Deluxe Dishes Licensed Premises Open 11 am - 8 pm daily 90 Gorge Rd. West 250-385-5564 http://Zoom.us/ Notice of Intention to Consider Issuance of a Temporary Use Permit Council for the City of Langford hereby gives Notice of Intention to consider issuance of a Temporary Use Permit at its Regular Meeting scheduled for 20 November 2023, at 7 pm. This meeting is being held electronically and with in-person attendance. File Temporary Use Permit No. TUP20-0006 Purpose The purpose of the proposed Temporary Use Permit is to allow Victoria Contracting & Municipal Maintenance Corporation (VCMMC) employee parking at 988 McCallum Road for an additional term of three years Applicant VCMMC Location 988 McCallum Road Teleconference # 1-855-703-8985 (Canada Toll Free) OR 1-778-907-2071 (long distance charges may apply) Meeting ID #897 0956 7061 / Zoom.us or Zoom app on your mobile device The Agenda, including the material that Council may consider in relation to the temporary use permit, will be uploaded to our website: Council & Committee Meetings - City of Langford no later than the Friday before the meeting. Correspondence may be submitted by emailing planning@langford.ca or by writing to Langford City Hall, 2nd Floor, 877 Goldstream Avenue, Langford, BC, V9B 2X8. You may also contact the Planning Department at (250) 478-7882. Braden Hutchins Director of Corporate Services The purpose of this Notice is to acquaint the property owners and residents in the area with the specifics of the proposed temporary use permit. Should you wish to make a submission to the Council in writing we require your name and civic address and that this be received, either electronically or by mail, by noon on the Tuesday prior to the meeting date to be included in the agenda. Correspondence received after that date will be circulated to the Council the day of the meeting and uploaded to the website as an “Addendum Package” the day after the meeting. You may also speak at the Council Meeting during the Public Participation Section of the meeting. PLEASE NOTE: Information about how to connect to this meeting electronically is indicated in the table below: MP MacGregor continues call for a national strategy for people with brain injuries Robert Barron Black Press Media Alistair MacGregor Page 68 of 190

Page 64–190

Page 69

t 250.478.7882 e administration@langford.ca 2nd Floor, 877 Goldstream Avenue Langford, BC V9B 2X8

Staff Report to Council

DATE: Monday, November 20, 2023 DEPARTMENT: Finance SUBJECT: RCMP Detachment Expansion Financing Update

EXECUTIVE SUMMARY:

On February 27, 2023, staff presented a summary report to Committee of the Whole (CoW) regarding the progress to date on the RCMP Detachment Expansion project. At this meeting, CoW passed the following resolution:

THAT Committee of the Whole recommend to Council on March 6th OR through the budget process on March 27th, that the City:

approve a budget of $721,560, which represents the City of Langford’s (60.13%) of the total budget of $1,200,000 required to further define the project requirements and goals, to arrive at a point where a decision on whether the project should proceed can be made;

AND

THAT Mayor Goodmanson and CAO Darren Kiedyk be appointed to a Joint Police Facilities Steering Committee to be made up of the Mayors and CAO’s of the Town of View Royal, and the Cities of Langford and Colwood to oversee the process of advancement of further project definition,

The $721,560 is included in the 2023 Capital Budget in the approved 2023-2027 Five Year Financial Plan that was passed by Council at the May 1, 2023 Regular Council meeting and in the 2023-2027 Five Year Financial Plan Bylaw, adopted by Council in May 11, 2023.

The Joint Police Facilities Steering Committee has met regularly. One of the many complex factors associated with a capital project of this size, especially given the number of municipalities involved, is how to best debt finance the project. The purpose of this report is to propose to Council a recommended option for debt financing.

Page 69 of 190

Page 64–190

Page 70

RCMP Detachment Expansion project update 20231120 Council Report Page 2 of 6

As discussions have progressed on the RCMP Detachment expansion, the Steering Committee has focused on the most equitable, lowest risk option for financing the project. Through discussions internally with the three communities, in addition to discussions with the Municipal Finance Authority (whom the borrowing would likely be through), the option of a sub-regional CRD service was brought forward as a possible option. A sub-regional service is a service provided by the Regional District where two or more jurisdictions are served, in this case City of Langford, City of Colwood and Town of View Royal. The boundary of the sub-regional service would include the entire municipal boundary for each of the three member municipalities. Through further discussions, including senior staff from the CRD, the option has progressed to be the recommended option.

BACKGROUND: Jointly owned by the City of Langford, City of Colwood, and the Town of View Royal (“The Communities”), the West Shore RCMP Detachment is located at 698 Atkins Avenue in Langford. The existing detachment is approximately 37,000 sq ft, comprising of two largely separate, but connected facilities; one built in the 1960s (approx. 10,600 sq ft), and a newer structure built in 1999 (approx. 26,400 sq ft).

Investments have been made in the current detachment, but the facility is nearing capacity, especially given the growth that the West Shore has experienced and the continued growth that is projected in the years to come. Projections by the RCMP demonstrate the need for increased space in the next one to four years. As the Communities continue to grow, so too does the need for specialized, efficient, and diversified policing services, including but not limited to increased use of technology, modern facilities, and a larger staff contingent to maintain current policing level of service in the region.

The Mayors and CAOs of the Communities have worked together, as part of the Joint Police Facilities Steering Committee, to continue to progress this project forward. In addition to the CAOs, the Chief Financial Officers (CFOs) have also worked to draft this report. It is important to note that a similar report will be presented to each of the three Communities’ Councils.

COMMENTARY:

Langford Council will recall that the City of Langford’s approved 2023-2027 Financial Plan includes a tax increase in each of the five years of:

Year Tax Increase Percentage 2023 1% 2024 3.5% 2025 3.5% Page 70 of 190

Page 64–190

Page 71

RCMP Detachment Expansion project update 20231120 Council Report Page 3 of 6

2026 3.5% 2027 3.5%

The projections indicate, that while these increases would initially be used to cover the financing costs associated with the proposed purchase of the YMCA Building, the funds collected through these increases would also then allow the City to debt finance the RCMP Detachment expansion. While the option of each municipality doing their own separate borrowing is still an alternative, there are a number of significant risks and complications associated with that option, and there are also a number of intangible benefits to the CRD sub-regional service for financing.

Perhaps the biggest risk associated with choosing separate borrowing processes is that each community must initiate their own separate electoral approval process, and the chance that one or two of the communities vote against the approval while one or two approve it would leave the project as a whole in uncertainty.

While the borrowing process and timeline will be virtually the same between the option of each municipality doing their own borrowing and proceeding with a sub-regional service through the CRD, the borrowing through the sub-regional service means there is only one electoral approval process, through the CRD. By narrowing the electoral approval process to a single process eliminates the risk that only a portion of the Communities approve the borrowing.

Additional benefits of proceeding through the CRD sub-regional service for the purposes of financing the construction of the RCMP Detachment Expansion include:

  1. The taxpayer will pay for the cost of the borrowing through the Capital Regional District line on their tax notice, not the municipal line.

  2. The proportionate share and impact on the taxpayer throughout the area will inherently adjust over time as populations grow. This would not have been the case if each individual municipality borrowed their independent portion.

  3. For each municipality, especially for Langford, this option eliminates the timing challenges associated with other municipal projects and associated with increasing the municipal property taxes enough to cover the debt servicing. Eliminating the impact on the municipal property taxes results in not needing to “delay” the project to allow the municipality to build up the required funds through tax increases to cover the debt servicing.

In addition, the following chart summarizes and compares some of the risks and benefits for each of these two options: Page 71 of 190

Page 64–190

Page 72

RCMP Detachment Expansion project update 20231120 Council Report Page 4 of 6

Risk or benefit Option 1: Independent Borrowing Option 2: CRD Subregional Service Borrowing Complexity More complex, requires greater collaboration between municipalities to coordinate messaging and public engagement, and may give rise to implications that differ between constituents. Less complex, requires collaboration between municipalities and CRD for messaging and public engagement, but is simpler to explain because implications are the same for all constituents. Electoral Approval Each municipality will seek electoral approval independently; there is some risk that electors in one or more of the municipalities will not approve, effectively preventing the project from proceeding until a remedy is found. The CRD will hold one electoral approval process for the region comprising View Royal, Colwood, and Langford. Risk of non-approval is that of the project as a whole, not specific to any one of the three municipalities. Timing Project cannot proceed until all three municipalities have obtained electoral approval independently; a delay by one or more municipalities will delay the project for all three. The CRD will hold a single electoral approval opportunity; project will only proceed if electoral approval is obtained. Debt Service Cost Recovery Principal and interest repayment is the responsibility of each municipality separately and would appear in their property tax notice either included in the general municipal tax or identified separately as a municipal tax for this purpose. Principal and interest repayment is the responsibility of the CRD subregional service and would be included in the CRD requisition and identified as such on the property tax notices for all taxpayers in each of the three municipalities. Debt Limit implications Legislation establishes debt limits: debt The debt is the responsibility of the municipality, and this borrowing would impact the The debt is issued to the CRD. This debt issuance may not impact the municipalities debt Page 72 of 190

Page 64–190

Page 73

RCMP Detachment Expansion project update 20231120 Council Report Page 5 of 6

servicing cannot exceed 25% of controllable/sustainable revenues. A liability servicing limit of 100% means that debt interest and principal payments equal 25% of controllable/sustainable revenues. municipalities’ ability access to debt for other purposes. limit and may not impact the municipalities’ access to debt.

In order to establish a sub-regional service, the CRD must adopt a service establishment bylaw. One of the requirements of that bylaw is to include the maximum amount that the service may cost (also the maximum amount that may be borrowed in order to pay for the service). At this time, the preliminary capital cost of the West Shore RCMP Detachment Expansion is estimated at $82.4M (Appendix 1); as this is a preliminary cost estimate, it is recommended to consider a consider an additional contingency factor of 25% bringing the maximum estimate to $103M.

Staff recommend establishing the service with a maximum dollar amount of $103M; however, it is important to note that while this is the maximum that could be borrowed, it does not mean the full amount will need to be borrowed. The Communities continue to advance the work to arrive at a point where a more accurate cost is known. Given the timelines required for the establishment of the service and the loan authorization bylaws, combined with the time required to better understand the cost estimate as well as the need to ensure this project keeps moving forward in a timely manner, it is recommended that the Communities proceed with requesting the CRD service establishment with the $103M figure.

FINANCIAL IMPLICATIONS:

Requesting the funding for the RCMP Detachment Expansion by way of a CRD sub-regional service allows for the borrowing to fall on the books and property taxes of the CRD, not the individual municipalities. The debt servicing costs will be included in the requisition the Communities receive each year from the CRD and would be collected via the Capital Regional District line item on the property tax notice; thus, not impacting the tax increases of the respective municipalities. It is expected that incremental municipal taxation would be required to fund the increased building operating costs of the facility expansion.

OPTIONS: Page 73 of 190

Page 64–190

Page 74

RCMP Detachment Expansion project update 20231120 Council Report Page 6 of 6

Option 1 THAT Council direct staff to write a letter to the Capital Regional District (CRD) requesting that the CRD establish a subregional service for the purposes of funding a joint capital project up to $103M.

OR Option 2 THAT Council direct staff to write a letter to the City of Colwood and Town of View Royal to notify them that the City of Langford wishes to undertake the funding of the RCMP Detachment Expansion capital project individually.

OR Option THAT Council receive this report for information and take no action.

SUBMITTED BY: Michael Dillabaugh, CPA, CA, Director of Finance Concurrence: Donna Petrie, Senior Manager of Economic Development & Communications Concurrence: Yari Nielsen, Director of Parks, Recreation and Facilities Concurrence: Matthew Baldwin, MCIP, RPP, Director of Planning and Subdivision Concurrence: Katelyn Balzer, P.Eng., Director of Engineering and Public Works Concurrence: Marie Watmough, Deputy Director of Corporate Services Concurrence: Braden Hutchins, Director of Corporate Services Concurrence: Darren Kiedyk, Chief Administrative Officer

Page 74 of 190

Page 64–190

Page 75

t 250.478.7882 e administration@langford.ca 2nd Floor, 877 Goldstream Avenue Langford, BC V9B 2X8

Staff Report to Council

DATE: Monday, November 20, 2023 DEPARTMENT: Engineering SUBJECT: Request for Construction Licence – Application for Lane Closure at 2826 Jacklin Rd.

EXECUTIVE SUMMARY: In advance of a Construction Impact Management Strategy and ‘Good Neighbour’ Policy, both identified as initiatives in the Draft 2023-2027 Council Strategic Plan, and the potential bylaw amendments (similar to other municipalities in the Greater Victoria Area for street occupancy permits) that may result from that engagement process, staff have been requiring developers to submit a request for a construction licence to occupy the road right-of-way. Staff are proposing scaled daily fee rates of:  $0.85 per square metre per day to occupy existing public sidewalks or parking stalls; and  $1.15 per square metre per day to occupy existing public bike lanes or vehicular lanes. This proposal is being brought forward by staff as a result of a request for a construction license for a significant temporary above ground encroachment in the road right-of-way fronting the development at 2826 Jackln Rd., where there is no other option for an adjacent laydown and delivery area, but undoubtedly will result in impacts to traffic on a major road for approximately 20 months. If Council approves this licence agreement, as proposed as an interim measure, this may set a precedent for future licence agreements and potential bylaw amendments for street occupancy to be brought forward to Council.

BACKGROUND: The application to rezone 2822, 2824, and 2828 Jacklin Road from the One- and Two-Family Residential (R2) Zone to the City Centre Pedestrian (CCP) Zone to allow for the development of a 12-storey mixed use build under Application No. Z21-0036 and Bylaw No. 2032 was adopted by Council on July 18th, 2022. The building permit was issued on September 26th, 2023 and onsite construction works have commenced.

Lubec Construction has submitted a formal request for a construction licence (application for lane closure at 2826 Jacklin Rd) to facilitate the construction of a multi-family residential tower with two levels of below grade parkade for the estimated construction duration of November 20, 2023, to August 1, 2025; see attached letter dated November 6, 2023. Lubec Construction also submitted the proposed scope of surface encroachment and traffic management plan (TMP) which addressed all of staff’s preliminary comments; see attached Encroachment Plan dated June 20, 2023, with Appendix A – TMP 1 Page 75 of 190

Page 64–190

Page 76

Request for Construction Licence – Application for Lane Closure at 2826 Jacklin Rd. 20231120 Council Report Page 2 of 6

Rev 2. The developer has stated that this building is being funded through the Canadian Mortgage & Housing Corporation (CMHC) program, will have affordable units, and that time is of the essence.

COMMENTARY: The residents and businesses of Langford have expressed, in general, that they are experiencing construction fatigue. There is a need to balance the negative impact that multi-year high-density infill construction has on their neighbours with the benefit of additional housing units being built. In advance of a Construction Impact Management Strategy and ‘Good Neighbour’ Policy, identified as initiatives in the Draft 2023-2027 Council Strategic Plan to address these ongoing impacts, staff are requiring developers to submit a request for construction licence to occupy the road right-of-way.

Construction License to Occupy on Jacklin Road

Jacklin Rd is classified as a Major Road in Langford. Traffic demand on a Major Road is typically between 5000 and 30000 vehicles per day. The road cross-section at 2826 Jacklin Rd. consists of three vehicular driving lanes (two single lanes with a two-way centre left turn lane) with two unprotected bike lanes and two sidewalks with boulevard and street trees. The developer is prioritizing sidewalk connectivity around the licence area in an accessible way with temporary barrier-free ramps and concrete barriers on the roadway for protection; see Figure 1. Therefore, approval of the construction license will result in the equivalent loss of both bike lanes and the two-way centre left turn lane for 20 months.

                        Figure 1: 2826 Jacklin Road Proposed Licence Area

Page 76 of 190

Page 64–190

Page 77

Request for Construction Licence – Application for Lane Closure at 2826 Jacklin Rd. 20231120 Council Report Page 3 of 6

It is unknown what level of impact the loss of the two-way centre left turn lane will have on the broader transportation network without a Traffic Impact Assessment (TIA). When exiting Hockley Ave onto Jacklin Rd, there is a stop sign and vehicles must wait for a break in traffic. Currently, the centre turn lane on Jacklin Rd helps with left turns off Hockley Ave onto Jacklin Rd because vehicles can turn into this middle lane even if there are vehicles southbound on Jacklin. As is currently proposed, the residents and businesses that enter and exit from Hockley Ave will still be allowed all turning movement onto Jacklin Rd because currently the Jacobson Rd connection (at the east end of Hockley Ave) is one-way westbound with “do not enter” signage on the Hockley Ave side.

Council may wish to require the developer to provide a TIA from a third-party professional or Council could approve the license agreement and the area would be monitored for traffic impacts. If there are reports of major delays at peak hour on Hockley Road (no opportunities to exit), staff would require an amendment to the TMP with options from a professional to adequately address the delays. Some options, for example restricting turning movements on Hockley Ave or reversing traffic flow on Jacobson Rd, would require engagement with the residents and businesses affected.

As is currently proposed, both bike lanes on Jacklin Road would end at the lane closure and cyclists will be directed to “take the lane” with the C-184 sign shown on the TMP and depicted in Figure 2. Although this is a standard approved construction sign in British Columbia, it is recognized that vulnerable users of all ages and abilities may not feel comfortable or confident enough to merge in with vehicular traffic on a Major Road. Council may wish to require that a cycling detour be established as part of the TMP for vulnerable users. Determining the best route would require consultation with a professional but staff can confirm that there are opportunities on parallel local streets for detour and that cyclists could still take the lane, if they so choose.

As stated above by the developer, time is of the essence because of the current stage this development and the funding source being CMHC. The reason why the development cannot proceed without this construction licence is because of the construction methodology assumptions and decisions made by the developer. For clarity, construction methodology is the responsibility of the developer. The City is not obligated to accommodate this request if Council determines that the impact to the community would be too great, regardless of the approvals or permits to date, the current stage of development, or the assumptions made by the developer based on a long-standing understanding of street occupancy for developments in Langford. Council has the opportunity at any time to set the standard going forward.

Charging for a Construction License to Occupy

When staff initially proposed a monthly fee of 5% of the adjacent property value per square metre per month for the construction licence, this developer attempted to rent space on the adjacent properties from another developer. In many cases, the financial deterrent has resulted in developers making other arrangements; thus, achieving the benefit of the housing being built without the impact to the public road right-of-way. In this case, the developer was unable to arrange alternative space. Once the City was Figure 2: C-184 Sign Page 77 of 190

Page 64–190

Page 78

Request for Construction Licence – Application for Lane Closure at 2826 Jacklin Rd. 20231120 Council Report Page 4 of 6

aware the developer was unable to achieve alternate arrangements and that the initially proposed fee was relatively high, staff began researching what the fees are in other municipalities, for comparison/confirmation.

Currently, Langford does have a Highway Use Bylaw No. 33 and permit process but typically only charges the minimum $35 application fee. It is standard practice in other municipalities to charge a daily rate per square metre for occupancy of public road right-of-way for private functions, including but not limited to for construction laydown, parking, and delivery areas. This charge encourages efficient use of the occupied area for the minimum amount of time required to complete the works. Also, charging a fee for the private use of the public road right-of-way encourages alternative/innovative construction methods and consideration for purchasing/renting adjacent private property for these purposes in the early stages of developing costing/proforma, all which would be more preferable to the City and the public than the loss of use of an existing public sidewalk, bike lane, parking stall, or vehicle lane.

In other municipalities, charging a daily rate per square metre is typically done through a street occupancy permit. Saanich charges $0.50 per square metre per day. View Royal charges $0.75 per square metre per day. Victoria charges based on a sliding scale of impact type, from $0.77 per square metre per day for sidewalks, to $1.92 per square metre per day for vehicle and bike lane closures. In addition to the daily rate there is typically a base fee for the application and additional requirements, including but not limited to: traffic management plan (TMP), insurance, damage deposits, bonding for removal/reinstatement, etc.

Given that developing a street occupancy permit would require bylaw amendments, the only mechanism to begin charging for street occupancy in Langford in the short-term would be through a construction licence. Langford typically charges an administrative fee of $2500 for a construction licence. Any conditions, requirements, fees, bonding, insurance, etc. proposed in the construction licence would be in addition to any other currently applicable bylaw or permit requirements, including but not limited to Bylaw No. 33. Please, see attached the draft licence agreement CON23-0162 for Council consideration.

Staff are proposing at a minimum the following fees for all future construction licences, as an interim measure for street occupancy, until the resultant recommendations for bylaw amendments from a Construction Impact Management Strategy and ‘Good Neighbour’ Policy engagement are adopted:  A one-time licence administration fee in the amount of $2,500;  $0.85 per square metre per day to occupy existing public sidewalks or parking stalls; and  $1.15 per square metre per day to occupy existing public bike lanes or vehicular lanes.

This is essentially a daily rental fee, which better aligns with the Community Charter for the exclusive private use of public lands, as long as it is applied fairly to all.

In this case, the daily fee is calculated as follow:  The requested licence area is 6.1m X 43.0m = 262.3m2;  The result is an equivalent loss of two bike lanes and one vehicular lane; Page 78 of 190

Page 64–190

Page 79

Request for Construction Licence – Application for Lane Closure at 2826 Jacklin Rd. 20231120 Council Report Page 5 of 6

 Therefore, the daily rate is $1.15/m2;  Therefore, the daily fee is 262.3m2 X $1.15/m2 = $301.65/day.

As a current comparison against other municipalities, over the duration of the proposed licence period of November 21st, 2023, to August 1st, 2025 which is 619 days, multiplied by the daily fee for this licence area, the total would be:  $81,181.85 in Saanich,  $121,772.78 in View Royal,  $249,790.31 in Victoria, and  $186,721.35 (proposed) in Langford.

Staff are proposing not charging for temporary occupancy of airspace or frontages with no existing formalized parking stalls, bike lanes, or sidewalks.

FINANCIAL IMPLICATIONS: All fees collected would be revenue that may be used for neighbourhood improvements to counteract the temporary loss of use of the public infrastructure or as otherwise approved by Council through the 5-year financial plan budget process.

LEGAL IMPLICATIONS: A licence agreement, approved by Council, with fair consideration, is necessary for the development to proceed. That said, Council is not obligated to approve the license agreement.

OPTIONS: Option 1 THAT Council authorize the Mayor and CAO to execute licence agreement CON23-0162.

OR Option 2 THAT Council authorize the Mayor and CAO to execute licence agreement CON23-0162 with the following amendments: a. _________________________; b. _________________________; c. _________________________.

OR Option 3 THAT Council defer consideration for street occupancy in front of 2826 Jacklin Road until the following information is received and accepted by staff, with the licence agreement amended accordingly and brought back to Council: a. _________________________; b. _________________________; Page 79 of 190

Page 64–190

Page 80

Request for Construction Licence – Application for Lane Closure at 2826 Jacklin Rd. 20231120 Council Report Page 6 of 6

c. _________________________.

OR Option 4 THAT Council does not allow street occupancy in front of 2826 Jacklin Road.

SUBMITTED BY: Katelyn Balzer, P.Eng., Director of Engineering and Public Works Concurrence: Donna Petrie, Senior Manager of Communications & Economic Development Concurrence: Yari Nielsen, Director of Parks, Recreation and Facilities Concurrence: Matthew Baldwin, MCIP, RPP, Director of Planning and Subdivision Concurrence: Katelyn Balzer, P.Eng., Director of Engineering and Public Works Concurrence: Michael Dillabaugh, CPA, CA, Director of Finance Concurrence: Marie Watmough, Deputy Director of Corporate Services Concurrence: Braden Hutchins, Director of Corporate Services Concurrence: Darren Kiedyk, Chief Administrative Officer

Attachments: 1. Request for Lane Closure – 2826 Jacklin Rd. dated November 6, 2023 2. Surface Encroachment Plan – 2826 Jacklin Rd. dated June 20, 2023, with traffic management plan in Appendix A – TMP 1 Rev 2 3. DRAFT CON23-0162 Licence Agreement Page 80 of 190

Page 64–190

Page 81

202, 754 Goldstream Ave Langford, BC V9B 5T2 www.buildlubec.com

Page 1 of 1

November 6, 2023

City of Langford Building Permit Dept. 2nd Floor 877 Goldstream Ave Langford BC Canada V9B 2X8

Attn.: Chris Pozney, RBO

Dear Mr. Pozney:

Re: Jacklin Rd. Residences

BLD22-0448

REQUEST FOR CONSTRUCTION LICENSE – Application For Lane Closure

On behalf of our client Jacklin Residences LP, we would like to request construction licenses to occupy the land at 2826 Jacklin Rd. for the purposes of constructing a residential tower as per BLD22-0448. Existing single-family residences will be demolished and a new multi-family residential tower with two levels of below grade parking will be constructed.

This Construction License request is regarding the utilization of city boulevard and lane use for 1 southbound land on Jacklin Road for Construction use and pedestrian detour for the construction of the Jacklin Road Apartments. Supporting Documentation will be provided via email to support this Construction License request from Lubec Construction Ltd.

Lubec Construction will be the primary construction manager on site and is estimating construction duration between November 20, 2023 through August 1, 2025.

Sincerely,

Colton Thomas Lubec Construction, Project Manager 250-857-6286, coltont@buildlubec.com

Page 81 of 190

Page 64–190

Page 82

202, 754 Goldstream Ave Langford, BC V9B 5T2 www.buildlubec.com

Encroachment Plan

   Date: June 20, 2023

City of Langford Re: 2826 Jacklin Road, Langford, BC Chemi Tenpa ctenpa@langford.ca

Surface Encroachment As per City of Langfrod request, the information provided below describes the intent of the encroachment required for the Loading and unloading for the project duration at 2826 Jacklin Road project. This Letter is to outline scope of work needed along with plan for public safety. As per Appendix A, the site use plan and Traffic management plan outline the encroachment requirements along with the area of total encroachment. The Scope of work required to complete the set up of the encroachment is outlined below. It is the intent that this Permit/License is to cover all work required to set up the encroachment and sidewalk relocation. Scope:

  1. Sidewalk removal from P/L to P/L – Replacement with Gravel pad for laydown area

  2. Installation of temporary sidewalk let down on curbs for barrier free pathway.

  3. Removal of two (2) city trees and stump to be ground down.

  4. Sod removal on Boulevard with replacement of gravel for laydown. Service Bypass to be installed for irrigation.

  5. Construction fence installation on curb for protection from construction.

  6. Concrete barrier installation on roadway.

  7. TMP set up as per TMP #1 Appendix A

Page 82 of 190

Page 64–190

Page 83

Imagery and map data ©2023, Google Jacklin Rd Lequesne Ave Hockley Ave TAKE THE LANE LANE CLOSED North General Conditions: Scope: Lane Closure ­ Lane Shift * Pedestrian traffic on East side Of Jacklin rd. * Fencing/ Barrier protecting work zone. * Wheel Chair ramp supported at work zone. * Cycling lanes closed ­ Take the Lane supported. . * Driveway accesses maintained. * Tubular Spacing to be at a maximum of 10 m. * 3.5 m lane width to be maintained. * All conflicting signage to be covered. * All sign spacing at 40 m Tactical Traffic Control Ltd. 250­201­8699 Legend Cone Work Area TAKE THE LANE Manifest 105 x Cone 4 x C­004 2 x C­001­1 2 x C­130­R 2 x C­184 2 x PS­003­R 1 x B­C­002 1 x C­052­R 1 x Work Truck Left www.invarion.com Sidewalk (1.8m Width) Temporary Barrier Free Ramp Temporary Barrier Free Ramp Construction Laydown Area 3.6m Wide North Bound Lane 3.6m Wide South Bound Lane Sign that states "Access into 2800 Jacklin Rd Businesses please use Orono Ave, Knotty Pine and Lequesne Ave" Sign to be 4' x 4' (Rendering to be provided to COL prior to order) Concrete Barriers for Pedestrian Safety TMP 1 rev 2 6' Site Fencing 24 Hour Contact Sign Posted of Site Fence Jamie Gabriel - 250-661-1272 Colton Thomas - 250-857-6286 Ryan Reagon - 778-350-9044 Centerline Delineation to be yellow and permanent Sight line NOT to be affected for left turning traffic. Left Turn delineation placement to be determined on site with COL. Additional Notes:

  1. All existing turn arrows on asphalt to be grinded and removed for TMP area.
  2. Existing northbound bike lane to be eradicated for TMP area.
  3. COL to be present during traffic plan implementation.
  4. All site access trucks entering and existing will be from south bound. Page 83 of 190
Page 64–190

Page 84

1

LICENCE AGREEMENT CON23-0162

This licence is dated for reference the 20th day of November, 2023.

BETWEEN:

City of Langford 2nd Floor, 877 Goldstream Avenue Langford, British Columbia V9B 2X8

(the “City”)

AND:

Jacklin Residences Limited Partnership 217-179 Davie Street, Vancouver, BC, V6Z 2Y1

(the “Licensee”)

GIVEN THAT:

A. Licensee is the purchaser of the property civilly identified as 2826 Jacklin Road, Langford, BC legally described as:

PID: 032-013-892 Legal: LOT 1, SECTION 5, ESQUIMALT DISTRICT PLAN, EPP124923

(the “Property”);

B. The City owns and maintains the road bordering the Property, civilly identified as Jacklin Road (the “Road”);

C. The Licensee has requested a licence to occupy upon a portion of the Road from the City as a result of the Licensee constructing a residential building as per BLD22-0448 (the “Residential Building”);

D. As authorized under the Community Charter, the City may permit a licence to occupy on land that is owned by the City.

THIS LICENCE is evidence that in consideration of the mutual promises contained in this Licence and the payment of $10.00 by the Licensee to the City (the receipt and sufficiency of which the City acknowledges), the parties covenant and agree as follows:

The City hereby grants a licence to the Licensee of that portion of the land approximately 262.3 m2, specifically identified on the sketches attached as Schedule “A” to this Licence (the “Licence Area”), Page 84 of 190

Page 64–190

Page 85

2

for the sole purpose of a staging area during the construction of the Residential Building (the “Licence”). The City grants this Licence subject to the terms and conditions of this agreement.

The term of this Licence shall commence on November 21st, 2023 (the “Term Commencement Date”) and shall terminate on August 1st, 2025 (the “Term”), unless terminated sooner pursuant to the terms of this Licence.

Concurrently with the signing of this Licence, the Licensee will give to the City bonding in an amount set by the City, which shall be the approximate cost of restoring the Licence Area and adjacent Road at the end of the Term.

In consideration of the granting of this Licence, the Licensee will pay to the City the following:

(a) a one-time licence administration fee in the amount of $2,500.00 (the “Administrative Fee”);

(b) an encroachment fee at a daily rate of $301.65, unless a different amount is established by City policy (the “Encroachment Fee”). For clarity, the parties agree that the Encroachment Fee may be subject to adjustments as per City policy.

The Encroachment Fee shall be paid on a monthly basis, calculated according to the number of calendar days in each month. The Licensee will pay the first monthly instalment on the Term Commencement Date for the period from such Term Commencement Date to the last day of the month. Thereafter, subsequent monthly instalments shall be in advance on the first day of each ensuing month.

The Licensee will ensure that its contractors, agents, and employees:

(a) Carry out the work in a good and workmanlike manner, in order to cause no unnecessary damage or disturbance to the Licence Area or the adjacent Road; (b) Not use the Licence Area for any purpose other than those herein specifically set out; (c) Keep and maintain the Licence Area and the adjacent Road in good and sufficient repair to the satisfaction of the City; (d) Replace and relocate any plants and greenery displaced by the use of the Licence Area at their own expense, including irrigation and plant replacement costs during the Term.

The Licensee’s obligations shall include but are not limited to:

(a) Provide traffic control and delineation measures satisfactory to the Director of Engineering; (b) Ensure that at least one contact person is available by telephone 24 hours per day and is available to attend the Licence Area within one hour of request by the City; (c) Provide and maintain all signage as may be required by the City; (d) Keep the Road adjacent to the Licence Area clear of all debris and obstructions; (e) Provide to the City: i. a construction, parking, and delivery management plan; and ii. a mitigation plan pursuant to section 2.5 of the City of Langford’s Bylaw 1000, prior to entering into the Licence.

Page 85 of 190

Page 64–190

Page 86

3

Upon the last day of the Term, or upon earlier termination of the License, the parties will complete an inspection to ensure the Licensee has left the Licence Area in a condition comparable to the condition of the Licence Area at the signing of this Licence. The Licensee agrees that the City may deduct amounts from the bond and will pay the City any additional amounts required to return the Licence Area to its original condition. The City will return the bond or remainder thereof, if any, within 30 days of the completion of this inspection.

The Licensee acknowledges that this is a non-exclusive licence and that the City and its officers, employees, contractors and agents may enter into and upon the Licence Area at all reasonable times for the purpose of constructing, maintaining and inspecting or removing any public works or utilities, and ensuring the Licensee’s compliance with this Licence.

The Licensee shall indemnify, defend and hold harmless the City, and its elected and appointed officials, officers, employees, contractors and agents, from and against all claims, actions, damages, liabilities, costs (including legal costs), and expenses arising from any occurrence on or within the Licence Area or the Road adjacent to, or caused by or contributed to by the negligence or other default of the Licensee in respect of anything done pursuant to or ostensibly pursuant to this Licence. The Licensee is not liable for any act or omission on the part of the City, its authorized agents or employees in respect of anything done under this Licence. This indemnity shall survive the expiry or earlier termination of this Licence.

The Licensee agrees to obtain and maintain at its sole expense general liability insurance in an amount not less than $5,000,000.00 per occurrence, and the insurance policy shall:

(a) name the City of Langford as additional insured;

(b) include that the City is protected notwithstanding any act, neglect, or misrepresentation by Licensee which might otherwise result in an avoidance of a claim and that such policies are not affected or invalidated by any act, omission or negligence of any third party which is not within the knowledge or control of the insured;

(c) be issued by an insurance company entitled to carry on the business of insurance under the laws of British Columbia with a financial credit rating of “A” or better;

(d) be primary and non-contributing with respect to any policies carried by the City and that any coverage carried by the City is in excess coverage;

(e) not be cancelled or materially modified without the insurer providing the City with 30 days written notice stating when such cancellation is to be effective or identifying the modification;

(f) be maintained for a period of 12 months after this Licence is terminated;

(g) include a cross liability clause such that the City and Licensee are each insured as if each had purchased the policy of insurance; and

Page 86 of 190

Page 64–190

Page 87

4

(h) be on other terms acceptable to the City, acting reasonably.

The Licensee will promptly provide the City with certificates of insurance confirming the insurance requirements under this Licence are met upon the execution of this Licence and thereafter upon demand by the City, including evidence of any material amendment to the policy.

If the Licensee fails to maintain insurance as required by this Licence, the City in its sole discretion may, after fourteen (14) days’ notice to the Licensee, obtain such insurance in whole in or in part. If the City obtains such insurance, the Licensee shall reimburse the City for the cost of that insurance plus a fifteen percent (15%) administration fee, within fifteen (15) days of receiving a written invoice from the City. For Clarity, the City has no obligation to obtain any insurance required to be maintained by the Licensee.

The Licensee understands and agrees that the City may at any time after 90 days, in its sole discretion, terminate this licence upon written notice to the Licensee. If the City terminates this Licence, the Licensee shall, at its own expense, within such time as may be specified by the City, restore the Licence Area to its original state to the satisfaction of the City.

If the Licensee chooses not to renew this Licence and fails to clear the Licence Area as required under this Licence, the City and its agents may remove all fixtures, chattels, improvements, personal property and all other things on the Licence Area. The cost of removal will be a debt due and owing to the City by the Licensee upon receipt by the Licensee of the City’s invoice.

The Licensee acknowledges there are no covenants, agreements, conditions, representations, or warranties by or binding on the City with respect to the Licence Area except as expressly set out in this Licence and the Schedules attached to this Licence.

Nothing in this Licence exempts the Licensee from complying with all applicable laws, including all municipal bylaws, or from obtaining all required permits and licenses relating to the use of the Licence Area.

The Licensee releases and forever discharges the City from all manner of claims of any nature whatsoever which may arise by reason of any act or omission of the City pursuant to this Licence.

Notwithstanding any provision of this Licence, the Licensee shall not be entitled to compensation for injurious affection or disturbance resulting in any way from the removal of the Licence and, without limitation, shall not be entitled to business losses, loss of profit, loss of market value, relocation costs or other consequential loss by reason of the termination of the Licence.

This Licence grants no interest in land in the Licence Area to the Licensee.

Waiver of any default by either party shall not be deemed to be a waiver of any subsequent default.

The Licensee is not permitted to assign this Licence, in whole or in part, and shall not permit or suffer any other person to occupy the whole or any part of the Licence Area.

Page 87 of 190

Page 64–190

Page 88

5

The Licensee may not sublicence this Licence without the City’s prior written consent.

Whenever the singular or masculine is used in this Licence, the same is deemed to include the plural or feminine or the body politic or corporate as the context requires.

Every reference to each party is deemed to include the heirs, executors, administrators, permitted assigns, employees, servants, agents, contractors, officers, elected officials, directors and invitees of such party, where the context so permits or requires.

If any portion of this Licence is held invalid by a court of competent jurisdiction, the invalid portion shall be severed and the decision that it is invalid shall not affect the remainder of this Licence.

The provisions herein contained constitute the entire agreement between the parties and supersede all previous communications, representations and agreements, whether verbal or written, between the parties with respect to the subject matter hereof.

Time is of the essence.

This Licence enures to the benefit and is binding upon the parties and their respective successors, heirs and permitted assigns.

The schedules referred to in this Licence and attached hereto form a part of this Licence.

Any notice or communication required or permitted to be given under this Licence will be in writing unless otherwise specified and will be effectively given if emailed, or mailed in Canada by first class mail, postage prepaid, delivered and addressed or directed as follows:

To the City at:

Attention: Director of Engineering City of Langford 2nd Floor, 877 Goldstream Avenue Langford, B.C. V9B 2X8

Email: kbalzer@langford.ca

To the Licensee at:

Attention: Sebastien Lebeouf Jacklin Residences Limited Partnership 1051 Wellington Cres Richmond, BC, V7B 1G6

Email: sebasleboeuf@hotmail.com

or to such other address as a party may specify by notice given as set out above. Page 88 of 190

Page 64–190

Page 89

6

Any notice or other communication will be deemed to have been received as follows:

(a) if delivered before 4:00 p.m., on the date of delivery if it is a business day and otherwise on the next business day;

(b) if mailed, on the third business day following the date on which it was mailed; and

(c) If emailed, on the date the email was sent if sent before 4:00 p.m. on a business day, and otherwise on the next business day.

This Licence may be executed in one or more counterparts, each of which will be an original, and all of which together will constitute a single instrument. Further, the parties agree that this Licence may be signed by electronic signature (e.g., DocuSign or similar electronic signature technology) and/or transmitted by electronic means, and thereafter maintained in electronic form, and that such electronic record will be valid, and effective to bind the party so signing, as a paper copy bearing such party’s hand-written signature. The parties further consent and agree that the electronic signatures appearing on this Licence will be treated, for the purposes of validity, enforceability, and admissibility, the same as hand-written signatures.

In this Licence, “business day” means any day Monday through Friday, except statutory holidays.

TO EVIDENCE THEIR AGREEMENT each of the parties has executed this Licence on the date first noted above.

Jacklin Residences Limited Partnership has executed this Licence by its authorized signatories:

_ Authorized Signatory

City of Langford has executed this Licence by its authorized by its authorized signatories:

Mayor

Chief Administrative Officer

Page 89 of 190

Page 64–190

Page 90

7

Schedule A

Map begins on subsequent page

Page 90 of 190

Page 64–190

Page 91

,PDJHU\DQGPDSGDWD‹*RRJOH -DFNOLQ5G /HTXHVQH $YH +RFNOH\$YH 7$.( 7+(/$1( /$1( &/26(' 1RUWK *HQHUDO&RQGLWLRQV 6FRSH/DQH&ORVXUH /DQH6KLIW

3HGHVWULDQWUDIILFRQ(DVWVLGH2I-DFNOLQUG

)HQFLQJ%DUULHUSURWHFWLQJZRUN]RQH

:KHHO&KDLUUDPSVXSSRUWHGDWZRUN]RQH

&\FOLQJODQHVFORVHG  7DNHWKH/DQHVXSSRUWHG

'ULYHZD\DFFHVVHVPDLQWDLQHG

7XEXODU6SDFLQJWREHDWDPD[LPXPRIP

PODQHZLGWKWREHPDLQWDLQHG

$OOFRQIOLFWLQJVLJQDJHWREHFRYHUHG

$OOVLJQVSDFLQJDWP 7DFWLFDO7UDIILF&RQWURO/WG  /HJHQG &RQH :RUN$UHD 7$.( 7+(/$1( 0DQLIHVW [ &RQH [ & [ & [ &5 [ & [ 365 [ %& [ &5 [ :RUN7UXFN/HIW ZZZLQYDULRQFRP Sidewalk (1.8m Width) Temporary Barrier Free Ramp Temporary Barrier Free Ramp Construction Laydown Area 3.6m Wide North Bound Lane 3.6m Wide South Bound Lane Sign that states "Access into 2800 Jacklin Rd Businesses please use Orono Ave, Knotty Pine and Lequesne Ave" Sign to be 4' x 4' (Rendering to be provided to COL prior to order) Concrete Barriers for Pedestrian Safety TMP 1 rev 2 6' Site Fencing 24 Hour Contact Sign Posted of Site Fence Jamie Gabriel - 250-661-1272 Colton Thomas - 250-857-6286 Ryan Reagon - 778-350-9044 Centerline Delineation to be yellow and permanent Sight line NOT to be affected for left turning traffic. Left Turn delineation placement to be determined on site with COL. Additional Notes:

  1. All existing turn arrows on asphalt to be grinded and removed for TMP area.
  2. Existing northbound bike lane to be eradicated for TMP area.
  3. COL to be present during traffic plan implementation.
  4. All site access trucks entering and existing will be from south bound. Page 91 of 190
Page 64–190

Page 92

Page 92 of 190

Page 64–190

Page 93

License Area Page 93 of 190

Page 64–190

Page 94

t 250.478.7882 e administration@langford.ca 2nd Floor, 877 Goldstream Avenue Langford, BC V9B 2X8

Staff Report to Council

DATE: Monday, November 20, 2023 DEPARTMENT: Administration SUBJECT: 2023-2027 Draft Council Strategic Plan - Additional Information and Proposed Amendments

EXECUTIVE SUMMARY: The intent of this report is to respond to the public input at the October 23rd Regular Meeting of Council, provide Council with a detailed analysis of the public feedback received regarding the 2023- 2027 Draft Council Strategic Plan (“the Strategic Plan”), and to make recommendations to Council regarding potential amendments to the Strategic Plan based on this feedback. BACKGROUND: At the Regular Meeting held Monday, October 23, 2023, Council passed the following resolution: THAT Council receive this report for information and given the volume and quality of written responses received from the public, that Council defers approval of the Strategic Plan until after staff has had sufficient time to analyze the public feedback and present it to Council for consideration. The Commentary section of this report reviews, in detail, the public feedback received and makes several suggested amendments to the Strategic Plan. Before discussing the feedback received and suggested amendments, it is worthwhile addressing a number of questions and comments that were put forward during public participation at the Regular Meeting of Council held Monday, October 23, 2023, with respect to the Strategic Plan. Strategic Plan vs. Official Community Plan (OCP) An OCP provides a long-term community vision for land use (but can speak to other areas of importance), while a Strategic Plan conveys the current Council’s short-term (four to five year) priorities for achieving their collective goals and mandate. Strategic Plan priorities typically extend well beyond land use, and could include public safety, economic development, quality of life, and other areas of focus not covered in an OCP. Put another way, an OCP creates strategic priority areas (particularly around long-term land use), and identifies supporting policies and objectives, while a Page 94 of 190

Page 64–190

Page 95

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 2 of 19

Strategic Plan provides an opportunity for the current Council to provide clarity, resources and specific timelines to the broader objectives for their term (which may draw on strategic priority areas identified in the OCP). Further, an OCP can provide inspiration for the priorities included in the Strategic Plan, but a Strategic Plan can also be used to inspire updates to the OCP should Council introduce new initiatives or priorities that should be reflected in the OCP. It is typical for most British Columbia communities to have both an OCP and a Strategic Plan, and both documents have the ability to set high level direction for the City. Within Langford’s OCP, there is a clear emphasis on land use (as noted on page 1 of the OCP: “This OCP… provides a strong rationale for how and where development and use changes are to occur”), but there are also many policies and objectives related to other areas of the community. In some instances, there is the strong relationship between Langford’s OCP (adopted in 2008) and the Strategic Plan. For example, Langford’s OCP sets objectives with respect to active transportation (on page 10: “Achieve an active transportation system that sees 42% of all trips made by walking, cycling, and transit by 2038”), while the Strategic Plan builds on this by committing to developing an Active Transportation Plan by Q3 2025 (objective 4b). As illustrated by this example, the OCP sets a high-level direction for the community, but does not provide a detailed plan, timelines, or funding for achieving that high-level direction. The Strategic Plan allows staff to implement priorities set by Council and allocate the necessary resources to move from high-level community visioning statements to ensure the implementation of prioritized objectives. It is also worth noting that there are other instances where Langford’s OCP does not have any long- term vision, policies or objectives that relate to the objectives in the Strategic Plan. For example, Langford’s OCP does not provide any policy statements with respect to the RMCP/Police Services, while the Strategic Plan prioritizes the expansion of the RCMP facility in objective 6j. Council Strategic Plan vs. Community Strategic Plan As noted above, an OCP provides a long-term vision for land use (and other priority areas), while the Strategic Plan identifies the current Council’s short-term (four to five year) priorities for achieving their collective goals and objectives. Given the short timelines of a strategic plan, it is not typical to have a lengthy and drawn-out public engagement process. Put another way, the Strategic Plan is Council’s Strategic Plan and not a Community Strategic Plan, as it is Council’s opportunity to define their priorities for their term, based on their collective goals, what they hear as priorities from the public, and by drawing on the OCP, and other sources. There Was Not Enough Public Engagement While there were 198 respondents to the online survey for the Strategic Plan, it should be noted that there were 2800 unique visits to the City’s Let’s Chat Langford Strategic Plan project page, and 1628 Page 95 of 190

Page 64–190

Page 96

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 3 of 19

unique downloads of the Strategic Plan. Further, it should be noted that the following organizations and individuals received an email invitation from staff to provide feedback on the Strategic Plan by attending the Open House, completing the survey, or by providing a written submission:  4VI (formally Tourism Association of Vancouver Island)  Aboriginal Coalition to End Homelessness  BC Housing  Beecher Bay First Nation  British Columbia Economic Development Association  CRD Housing  Community Social Planning Council of Greater Victoria  Goldstream Farmers Market  Goldstream Food Bank  Greater Victoria Public Library  Inter-Cultural Association of Greater Victoria  M’akola Housing Society  NDP MLA – Ravi Parmar  NDP MP – Alistair McGreggor  Pacific FC  Royal Canadian Legion (Langford Branch)  Royal Roads University  Rugby Canada  Superintendent – School District No. 62 (Sooke)  Vancouver Island Economic Alliance  Vancouver Island Film Commission  Victoria Pride Society  West Shore Arts Council  West Shore Chamber of Commerce  West Shore Developers Association  West Shore Parks and Recreation Society (WSPRS)  West Shore Rebels  YMCA Greater Victoria

As the City moves to implement objectives outlined in the Strategic Plan, many projects will include significant public engagement and consultation opportunities. The level of engagement in each instance will be determined based on the scope, size, and timeline of each objective. As an example of further engagement to an objective identified in the Strategic Plan (1g: Develop an Urban Forest Page 96 of 190

Page 64–190

Page 97

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 4 of 19

Management Plan), Phase 1 of the public consultation for the Urban Forest Management Plan is currently live on Let’s Chat Langford and there was a public open house for this initiative on November 15th at City Hall.

It is important to note that in addition to future public engagement opportunities with respect to specific objectives within the Strategic Plan, the Public will also have the opportunity to provide input on whether unfunded and partially funded objectives in the Strategic Plan should be funded through the City’s annual budget process.

Finally, progress implementing the Strategic Plan will be discussed by Council regularly, and the Strategic Plan itself may be updated or amended as circumstances evolve. In both instances, the Public will be able to provide further feedback.

COMMENTARY: As noted in the October 23rd report to Council, 2023-2023 draft Council Strategic Plan – Initial Rollup of Public Engagement Feedback (attached), almost 200 individuals completed the online survey, approximately 75 individuals attended the public open house and contributed their feedback on poster boards, and approximately 15 individuals contributed written submissions. Informal feedback was also received at several pop-up engagement opportunities, including at the Goldstream Farmers Market, a local coffee shop, and during a student engagement session held at Belmont Secondary School. Given the volume and quality of feedback received from the public, the October 23rd report only provided an initial roll-up of the feedback received through the online surveys. Staff have now had time to review and analyze the feedback, in particular, the open-ended and email responses, and are now able to recommend amendments to the Strategic Plan, based on this feedback. Before discussing potential amendments, it is important to note the following:  All six strategic priority areas should be considered equal. In other words, just because Strategic Priority Six: Quality of Life is the last strategic priority area listed in the Strategic Plan (but received the most support from the public), it is not any less important than the other strategic priority area.  Surveys can have their limitations, based on their design. For example, in the Strategic Plan online survey, residents were asked to rank which objective in each strategic theme was least important to them. The survey did not allow for a response that indicated that all options were important, and therefore, someone’s least important objective could still be meaningful to that person. Staff have noted this limitation (in the spirit of Council’s core value of Page 97 of 190

Page 64–190

Page 98

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 5 of 19

continuous learning) and will ensure that future surveys provide alternative responses.  The public feedback is representative of those who participated, and while very useful, may not be representative of the broader Langford population. Therefore, there are two instances below where staff recommend not incorporating feedback received, as it is likely that the feedback may not be representative of underrepresented and marginalized groups. Strategic Priority One: Sustainable Development In this Strategic Priority, the following four objectives received the most support from the public:  1g: Develop an Urban Forest Management Plan (Funded, Q3 2024) – 72 votes  1g: Develop a Construction Impact Management Strategy and ‘Good Neighbour’ Policy (Partially Funded, Q2 2024) – 70 votes  1a: Refresh the Official Community Plan (Funded, Q2 2025) – 65 votes  1m: Pursue Programs and Partnerships for Affordable Housing (Funded, Ongoing) – 63 votes The following objective received the least amount of support from the public:  1j: Review Downtown Public Parking Needs and Related Policies – 37 votes Feedback from the public (received at the open house, via open-ended survey questions, and via email), suggests that the following area is not sufficiently addressed in this Strategic Priority:  Supports for Tenants Based on this community feedback received, Council may wish to make the following substantive amendment to the Strategic Plan:  Remove the words “and tenant assistance policies” from Objective 1m: Pursue Programs and Partnerships for Affordable Housing, and create the following new objective: 1n: Tenant Assistance Supports (Funded, Target Completion Date Q4 2025, and in support of the following crises: Housing, Climate and Inequality) The City recognizes that tenants experience housing issues in a different way than homeowners and require different forms of support as a result. The City will review best practices for tenant assistance from other similar British Columbia municipalities with the aim of developing tenant assistance supports that are suited for the Langford context. Page 98 of 190

Page 64–190

Page 99

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 6 of 19

On a separate note, over the past several weeks, the Province has introduced new legislation covering three topic areas: 1) amending zones to allow for “Small-Scale, Multi-Unit Housing” (i.e. townhouses and multi-plex homes containing multiple dwelling units) in traditional single-family neighbourhoods, 2) setting minimum densities for housing near transit stations/exchanges, and 3) introducing a new development-finance tool for amenity contributions, such that amenity contributions will be established through a bylaw, similar to Development Cost Charges, rather than through a Policy or negotiated on a case-by-case basis. While the details relating to the implementation of this legislation will not be released until December 2023, this legislation will certainly transform how local government zoning bylaws are structured and applied to land, essentially ending exclusionary “single-family dwelling only” zoning (although some exemptions are expected to apply) and facilitating a greater number of small-scale and transit- oriented development to proceed without rezoning. While Langford’s Zoning Bylaw has widely permitted secondary suites and duplexes on most residential lots for many years, it is expected that significant work will still be required to respond to this legislation by the anticipated deadline of June 30, 2024. The new legislation will also update the methodology used to prepare Housing Needs Reports to improve the understanding of the current gaps and needs of the housing market, not just the anticipated needs generated by future growth. It will also be required that local governments adopt updated Housing Needs Reports by January 2025, and ensure OCPs and Zoning Bylaws reflect the Housing Needs Report by December 2025. The Strategic Plan does include objectives relating to the OCP Refresh project and Housing Needs Report update with completion timelines that align with these deadlines. It does not, however, include an objective to updating the Zoning Bylaw to align with these legislative changes. As such, staff suggest two new objectives, as follows:  1o: Update the Zoning Bylaw to reflect the new Small-Scale, Multi-Unit Housing and Transit- Oriented Development legislation (Funded, Targeted Completion Date, Q2 2024, In Support of the Following Crises: Housing, Climate, Inequality). The Zoning Bylaw will require updating to incorporate new or amended Zones that will implement Provincial Legislation aiming to increase the supply of small-scale multi-unit housing in traditional single-family neighbourhoods and to establish minimum heights/densities for new multi-unit housing near transit stations/hubs.  1p: Review the Zoning Bylaw to ensure alignment with the Housing Needs Report and OCP (Funded, Targeted Completion Date, Q2 2024, In Support of the Following Crises: Housing, Climate, Inequality). Page 99 of 190

Page 64–190

Page 100

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 7 of 19

Building on the shorter-term updates outlined in Objective 1o, the City will be required to review the Zoning Bylaw following the completion of the updated Housing Needs Report (Objective 1k) and OCP Refresh (Objective 1a) in order to ensure that the projected housing need can be achieved on pre-zoned land. Further, while the Strategic Plan does include an objective to update the Amenity Contribution Policy, staff suggest updating the wording to reflect the new Amenity Contribution Charge financial tool to be introduced by the Province, as outlined below.  Replace the draft language in Objective 1b: Update Amenity Contribution Policy with the following: In light of recent announcements from the Province regarding amenity contributions in conjunction with rezoning, the City will review its Amenity Contribution Policy and bring this in line with the Province’s proposed Amenity Contribution Charge (ACC) financial tool. The objective of helping align the needs of the community with the financial value conveyed to development through rezoning will remain paramount. In light of this new body of work and provincially mandated timelines, Council may wish to amend the Targeted Completion Dates of the following objectives:  1d: Update the Design Guidelines and Consider an Advisory Design Panel: Change Targeted Completion Date from Q1 2025 to Q3 2025.  1e: Develop a Climate Action DPA Bylaw: Change Targeted Completion Date from Q1 2025 to Q3 2025.  1i: Review the Zoning Bylaw Parking Requirements in the City Centre: Change Targeted Completion Date from Q3 2024 to Q2 2025. In line with feedback received from the Public, staff will be requesting additional resources during the 2024 budget process to allow for the implementation of Objective 1g: Develop a Construction Impact Management Strategy and ‘Good Neighbour’ Policy (Partially Funded, Q2 2024). In addition to the above request from staff, Council may also wish to note that several other objectives within this strategic priority are unfunded or partially funded, and as such, staff will include these Objectives within the relevant budget process for Council’s consideration to meet the current timelines within the Strategic Plan. Staff do not recommend amending or removing Objective 1j: Review Downtown Public Parking Needs and Related Policies, despite the low support for this objective from the Public. The intent of this objective is to mitigate the impacts of the opening of the new West Shore Post Secondary Campus and its associated off-street and on-street parking needs on businesses, employees, and residents within Page 100 of 190

Page 64–190

Page 101

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 8 of 19

the downtown core. Further, City staff (both Bylaw and Economic Development) frequently hear growing frustrations from small local businesses that the demand on downtown parking has reached its limit. With increasing pressures from residents and business employees on downtown street parking, customers are finding it harder to park in downtown Langford and are also growing frustrated. The downtown parking review will actively seek to find timely and effective solutions to this growing challenge which will help small businesses already navigating a challenging economy. Beyond the above substantive considerations, staff recommend the following housekeeping amendments to this Strategic Priority in the Strategic Plan:  Label Objective 1m: Pursue Programs and Partnerships for Affordable Housing as partially funded instead of funded.  Label Objective 1j: Review Downtown Public Parking Needs and Related Policies partially funded instead of funded. Strategic Priority Two: Climate Change and Environmental Stewardship In this Strategic Priority, the following three objectives received the most support from the public:  2e: Develop Strategies for Disaster Mitigation Due to Climate Change and Build Resiliency as a Community (Partially Funded, Ongoing) – 142 votes  2a: Develop a Climate Action Master Plan Including Targets for Emissions Reductions (Unfunded, Q1 2025) – 110 votes  2d: Update the Storm Water Management Requirements (Unfunded, Q4 2024) – 102 votes The following objective received the least amount of support from the public:  2b: Hire a Climate Change Specialist Feedback from the public (received at the open house, via open-ended survey questions, and via email), suggests that the following area is not sufficiently addressed in this Strategic Priority:  Specific timelines and details around the City’s disaster mitigation efforts as it relates to climate change Based this community feedback received, along with further considerations from staff, Council may wish to make the following substantive amendments to the Strategic Plan:  Clarify Objective 2e: Develop Strategies for Disaster Mitigation Due to Climate Change and Page 101 of 190

Page 64–190

Page 102

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 9 of 19

Build Resiliency as a Community (Partially Funded, Ongoing) by including a specific timeline for an overarching disaster mitigation strategy and providing specific examples of potential initiatives. The amended Objective 2e would read: 2e: Develop an Overarching Disaster Mitigation Strategy with Respect to Climate Change and Build Resiliency as a Community Based on Specific Initiatives (Partially Funded, Targeted Completion Date for the Overarching Disaster Mitigation Strategy is Q4 2024) The City must act swiftly to develop a disaster mitigation strategy to manage the diverse types of climate impacts, including prolonged heat events, significant storms, floods, droughts, wildfires and associated smoke. Examples of specific initiatives include but are not limited to: implementing a FireSmart Neighbourhood Program, installing water fountains in new and existing parks, improving the tree canopy in the downtown core to reduce urban heat concerns, and updating bylaws to include best practices for developments in Wildfire Urban Interface areas. Staff do not recommend amending or removing 2b: Hire a Climate Change Specialist, as this role will be central to achieving the other objectives in this Strategic Priority. In fact, should Council wish to achieve the other objectives within this Strategic Priority (in particular 2a and 2e), staff recommend that Council amend the timeline for this objective from Q3 2024 to Q1 2024, as staff believe that the City has grant funding for this new role in the short-term. As this staff person will play a central role in developing the Climate Action Master Plan (Objective 2a), staff suggest that the Targeted Completion Date for Objective 2a be amended to Q3 2025 to account for the time it will take to recruit a Climate Change Specialist. Further, and in line with feedback received from the public, staff will be bringing forward a request in the 2024 budget process for resources in support of Objective 2d: Update the Storm Water Management Requirements (Unfunded, Q4 2024). Strategic Priority Three: Economic Development In this Strategic Priority, the following four objectives received the most support from the public:  3a: Develop an Economic Development Plan (Unfunded, Q4 2024) – 126 votes  3b: Actively Support the Evolution of the Downtown Post Secondary Campus (Partially Funded, Ongoing) – 120 votes  3c: Explore Ways to Incentivize and Attract Technology Companies (Funded, Q4 2025) – 98  3f: Create an Arts and Culture Strategic Plan (Unfunded, Q1 2025) - 91 votes Page 102 of 190

Page 64–190

Page 103

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 10 of 19

The following objective received the least amount of support from the public:  3d: Implement the Five-Year Tourism Strategy Feedback from the public (received at the open house, via open-ended survey questions, and via email), suggests that all areas of importance are sufficiently addressed in this Strategic Priority. In line with feedback received from the public, staff will be bringing forward a request in the 2024 budget process for resources in support of Objective 3a: Develop an Economic Development Plan (Unfunded, Q4 2024) and Objective 3f: Create an Arts and Culture Strategic Plan (Unfunded Q1, 2025). Staff do not recommend amending or removing Objective 3d: Implement the Five-Year Tourism Strategy, despite the low support for this objective from the public, as this objective supports Langford’s ongoing economic diversity and vibrancy, and supports community events, businesses, and sports teams located in Langford, such as Rugby Canada, Pacific FC and the West Shore Rebels, restaurants, cafes, hotels, shops, and other businesses that visitors to Langford support. Additionally, all costs associated with this objective are fully funded from the Municipal Regional Distance Tax (Hotel Tax), paid by visitors staying at local hotels, and not funded by the individual taxpayer. Strategic Priority Four: Transportation In this Strategic Priority, the following three objectives received the most support from the public:  4c: Improve and Expand Active Transportation Infrastructure (Funded, Ongoing) – 172 votes  4a: Develop a Transportation Master Plan (Unfunded, Q3 2025) – 137 votes  4b: Develop an Active Transportation Plan (Unfunded, Q3 2025) – 134 votes The following objective received the least amount of support from the public:  4d: Create Awareness and Opportunities for Transportation Mode Shift (Funded, Ongoing) Feedback from the public (received at the open house, via open-ended survey questions, and via email), suggests that the following area is not sufficiently addressed in this Strategic Priority:  Traffic near schools and safe routes to schools Based on the community feedback received, along with further considerations from staff, Council may wish to make the following substantive amendments to the Strategic Plan:  Amending the language in Objective 4a: Develop a Transportation Master Plan to read: Page 103 of 190

Page 64–190

Page 104

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 11 of 19

The Transportation Master Plan (TMP) will be Langford’s first official long-term guide for the planning, design, and development of multi-modal transportation infrastructure in accordance with Langford’s land use and growth strategies, neighbouring municipalities TMPs for continuity at borders, and any multi-modal regional or provincial transportation plans. This study will examine Langford’s current transportation system, identify the constraints and opportunities to improve traffic flow with mode shift, and assess potential infrastructure upgrades. The TMP will consider mitigating strategies for high traffic and high-risk areas (e.g., traffic near current and future schools).  Amending the language in Objective 4b: Develop an Active Transportation Plan to read: An Active Transportation Plan (ATP) will be developed in parallel with a Transportation Master Plan (TMP). It will reduce car dependency by improving the safety and connectivity of the multi-modal network throughout Langford for all travelers. The ATP will identify key corridors and connections, including safe routes to schools, and including recommendations for active transportation infrastructure upgrades that are healthy, enjoyable, and convenient for people of all ages and abilities who choose to travel in many different ways: walking, biking, skateboarding, scooters, wheelchairs, transit, and other active mobility options. Further, and in line with feedback received from the public, staff will be bringing forward a request in the 2024 budget process for resources in support of Objective 4a: Develop a Transportation Master Plan (Unfunded, Q3 2025) and Objective 4b: Develop an Active Transportation Plan (Unfunded, Q3 2025). Staff do not recommend amending or removing 4d: Create Awareness and Opportunities for Transportation Mode Shift (Funded, Ongoing), despite the low support for this objective from the public, as this objective aligns with the Active Transportation Plan (the top-rated objective in this Priority Area) and is a necessary consideration for every new project. Strategic Priority Five: Good Governance In this Strategic Priority, the following three objectives received the most support from the public:  5b: Ensure all Budgets are Fiscally Sustainable and Transparent (Funded, Ongoing) – 140 votes  5c: Expand Opportunities for Public Engagement (Partially Funded, Ongoing) – 87 votes  5a: Be at the Table for Strategic Regional Discussions and Decisions (Funded, Ongoing) – 75 votes The following objective received the least amount of support from the public: Page 104 of 190

Page 64–190

Page 105

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 12 of 19

 5e: Develop and Equity, Diversity and Inclusion Strategy (Unfunded, Q4 2024) Feedback from the public (received at the open house, via open-ended survey questions, and via email), suggests that the following area is not sufficiently addressed in this Strategic Priority:  Transparency of Financial Information Based on the community feedback received, along with further considerations from staff, Council may wish to make the following substantive amendments to the Strategic Plan:  Split Objective 5b: Ensure all Budgets are Fiscally Sustainable and Transparent (Funded, Ongoing) into two separate objectives: 5bi: Ensure all Budgets are Fiscally Sustainable (Funded, Ongoing) By ensuring strong financial controls, ensuring services are funded from the appropriate sources, building the City’s reserves, applying for a variety of grants, and ensuring that funds are allocated with a lens of equity and future generations, the City will ensure that its budgets are responsible and fiscally sustainable. 5bii: Ensure all Budget Documents are Transparent and User Friendly (Funded, Q1 2025) The City recognizes it is important for residents to be able to meaningfully participate in the annual budget process. While robust Council and Committee of the Whole meetings support this, the City will continually strive to improve the budget process and budget documents to ensure the public is best able to understand and participate in related decision-making. Staff do not recommend removing Objective 5e: Develop and Equity, Diversity and Inclusion Strategy (Unfunded, Q4 2024), despite the low support for this objective from the public. The intent of this objective is to ensure that all voices can equally participate, especially those who are underrepresented and marginalized (and therefore less likely to participate in the Strategic Plan public consultation). Staff do recommend extending the targeted completion date for this Objective to Q4 2025, to ensure that a meaningful strategy can be completed. In support of this objective, staff will be bringing forward a request for resources in the 2024 budget process. In addition, Council may also wish to note that other objectives within this Strategic Priority are partially funded, and as such, staff will include these objectives within the relevant budget process for Council’s consideration in order to meet the current timelines within the Strategic Plan. Strategic Priority Six: Quality of Life In this Strategic Priority, the following five objectives received the most support from the public: Page 105 of 190

Page 64–190

Page 106

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 13 of 19

 6b: Develop a Parks and Public Spaces Master Plan (Unfunded, Q3 2025) – 100 votes  6k: Explore Public Safety Options To Address Emerging Issues Around Unsheltered Populations (Funded, Ongoing) – 70 votes  6j: Support the Expansion of the RCMP Facility (Partially Funded, Ongoing) – 66 votes  6l: Increased Access to Recreation Services and Infrastructure (Partially Funded, Ongoing) – 60 votes  6d: Support the Efforts of Community Organizations to Expand Services to Youth, Seniors, and Other Underrepresented and Marginalized Groups (Partially Funded, Ongoing) – 56 votes The following objective received the least amount of support from the public:  6c: Continue to Take Action Towards Reconciliation (Funded, Ongoing) Feedback from the public (received at the open house, via open-ended survey questions, and via email), suggests that the following area is not sufficiently addressed in this Strategic Priority:  Libraries Based on the community feedback received, along with further considerations from staff, Council may wish to make the following substantive amendments to the Strategic Plan:  That the following objective be added to Strategic Priority Six: Quality of Life Objective 6m: Explore Current Library Capacity and Community Needs (Unfunded, Ongoing) Currently, the City provides for library services for the residents, through the membership in the Greater Victoria Public Library (GVPL), through the Juan de Fuca Branch (at West Shore Parks and Recreation), the Goudy Branch (on Goldstream) and the Heritage Branch (in Westhills). The City has not expanded the number or capacity of libraries since 2016, despite the significant growth in population. With this in mind, the City will work with the GVPL to review capacity and community needs, and to potentially identify opportunities to expand library capacity within Langford. Further, in line with feedback received from the public, staff will be bringing forward a request in the 2024 budget process for resources in support of Objective 6b: Develop a Parks and Public Spaces Master Plan (Unfunded, Q3 2025). In addition to this request, Council may also wish to note that other objectives within this Strategic Page 106 of 190

Page 64–190

Page 107

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 14 of 19

Priority are partially funded, and as such, staff will include these objectives within the relevant budget process for Council’s consideration in order to meet the current timelines within the Strategic Plan. Staff do not recommend removing 6c: Continue to Take Action Towards Reconciliation (Funded, Ongoing), despite the low support for this objective from the public. The intent of this objective is to ensure that the City implements the actions specific to local government as outlined in the Truth and Reconciliation Commission to Canada: Calls to Action, and that the City works with Indigenous partners, celebrates Indigenous culture and ensures its work is grounded with a meaningful lens of truth and reconciliation. Upon further review, staff recommend amending this objective to relabel it from funded to partially funded, given the volume of work that may be required to achieve this Objective. Should Council support this amendment, staff will be bringing forward a request in a future budget for additional resources. In addition to the above resource requests, Council may also wish to note that several other objectives within this Strategic Priority are unfunded or partially funded, and as such, staff will include these objectives within the relevant budget process for Council’s consideration in order to meet the current timelines within the Strategic Plan. Beyond the above substantive considerations, staff recommend the following housekeeping amendments to this Strategic Priority in the Strategic Plan:  That Objective 6b: Develop a Parks and Public Spaces Master Plan be renamed Objective 6b: Develop a Parks, Recreation and Trails Master Plan Collaborative Advocacy The Collaborative Advocacy section of the Strategic Plan recognizes that many critical services, especially those at the forefront of many urgent community needs, are not directly delivered by the City. As the population continues to rapidly grow, and complex and diverse challenges continue to emerge, advocacy will play a critical part in guiding Langford’s future. Of the seven advocacy areas in the Strategic Plan, all received a significant amount of support from the public. Only four respondents indicated that none of the collective advocacy areas were important to them. Staff are not recommending any substantive changes to the Collaborative Advocacy Section of the Strategic Plan. Staff are recommending the following housekeeping amendment to the Collaborative Advocacy Section:  Amend the Number of Schools in Langford advocacy item to note that schools are needed Page 107 of 190

Page 64–190

Page 108

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 15 of 19

both in Langford and the West Shore. The amended language would read: Number Of Schools in Langford and the West Shore: Schools in School District 62 are beyond capacity in many areas of Langford and the West Shore, including some schools that have not even opened yet. School District 62 has identified that five additional schools are needed in the near future but has not secured funding for all of those schools from the Provincial Government. The City will be at the table with School District 62 and the Province to help secure additional schools for Langford and the West Shore. FINANCIAL IMPLICATIONS: This Strategic Plan is very ambitious and the implementation of many of the objectives in the strategic plan will have costs. Approximately twenty to twenty-five of the strategic objectives are unfunded or partially funded, and will need to be further considered by Council through the 2024 budget process (and future budget processes). If Council determines it wishes to defer a Strategic Plan objective during a budget process as a result of financial considerations, the Strategic Plan will need to be amended to reflect the changing timelines. LEGAL IMPLICATIONS: While there are no legal implications with Council approving the Strategic Plan, each objective within the Strategic Plan may have its own legal considerations that will need to be considered.

OPTIONS: Option 1

  1. THAT Council approves the 2023-2027 Council Strategic Plan with the following amendments:

a. Remove the words “and tenant assistance policies” from Objective 1m: Pursue Programs and Partnerships for Affordable Housing, and create the following new objective: 1n: Tenant Assistance Supports (Funded, Target Completion Date Q4 2025, and in support of the following crises: Housing, Climate and Inequality) The City recognizes that tenants experience housing issues in a different way than homeowners and require different forms of support as a result. The City will review best practices for tenant assistance from other similar British Columbia municipalities with the aim of developing tenant assistance supports that are suited for the Langford context. Page 108 of 190

Page 64–190

Page 109

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 16 of 19

b. Create the following new objective: 1o: Update the Zoning Bylaw to reflect the new Small-Scale, Multi-Unit Housing and Transit- Oriented Development legislation (Funded, Target Completion Date Q2 2025, and in support of the following crises: Housing, Climate and Inequality). The Zoning Bylaw will require updating to incorporate new or amended Zones that will implement Provincial Legislation aiming to increase the supply of small-scale multi-unit housing in traditional single-family neighbourhoods and to establish minimum heights/densities for new multi-unit housing near transit stations/hubs. c. Create the following new objective: 1p: Review the Zoning Bylaw to ensure alignment with the Housing Needs Report and OCP (Funded, Target Completion Date Q4 2025, and in support of the following crises: Housing, Climate and Inequality). Building on the shorter-term updates outlined in Objective 1o, the City will be required to review the Zoning Bylaw following the completion of the updated Housing Needs Report (Objective 1k) and OCP Refresh (Objective 1a) in order to ensure that the projected housing need can be achieved on pre-zoned land. d. Replace the draft language in Objective 1b: Update Amenity Contribution Policy with the following: In light of recent announcements from the Province regarding amenity contributions in conjunction with rezoning, the City will review its Amenity Contribution Policy and bring this in line with the Province’s proposed Amenity Contribution Charges (ACC). The objective of helping align the needs of the community with the financial value conveyed to development through rezoning will remain paramount. e. Amend the targeted completion date from Q1 2025 to Q3 2025 for Objective 1d: Update the Design Guidelines and Consider an Advisory Design Panel. f. Amend the targeted completion date from Q1 2025 to Q3 2025 for Objective 1e: Develop a Climate Action DPA Bylaw. g. Amend the targeted completion date from Q3 2024 to Q2 2025 for Objective 1i: Review the Zoning Bylaw Parking Requirements in the City Centre. h. Label Objective 1m: Pursue Programs and Partnerships for Affordable Housing as partially funded instead of funded. Page 109 of 190

Page 64–190

Page 110

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 17 of 19

i. Label Objective 1j: Review Downtown Public Parking Needs and Related Policies partially funded instead of funded. j. Clarify Objective 2e: Develop Strategies for Disaster Mitigation Due to Climate Change and Build Resiliency as a Community (Partially Funded, Ongoing) by (1) including a specific timeline for an overarching disaster mitigation strategy and providing specific examples of potential initiatives. The amended Objective 2e would read: 2e: Develop an Overarching Disaster Mitigation Strategy with Respect to Climate Change and Build Resiliency as a Community Based on Specific Initiatives (Partially Funded, Targeted Completion Date for the Overarching Disaster Mitigation Strategy is Q4 2024) The City must act swiftly to develop a disaster mitigation strategy to manage the diverse types of climate impacts, including prolonged heat events, significant storms, floods, droughts, wildfires and associated smoke. Examples of specific initiatives include but are not limited to: implementing a FireSmart Neighbourhood Program, installing water fountains in new and existing parks, improving the tree canopy in the downtown core to reduce urban heat concerns, and updating bylaws to include best practices for developments in Wildfire Urban Interface areas. k. Amend the targeted completion date for Objective 2b: Hire a Climate Change Specialist from Q3 2024 to Q1 2024. l. Amend the targeted completion date for Objective 2a: Develop a Climate Action Master Plan from Q1 2025 to Q3 2025. m. Amend the language in Objective 4a: Develop a Transportation Master Plan to read: The Transportation Master Plan (TMP) will be Langford’s first official long-term guide for the planning, design, and development of multi-modal transportation infrastructure in accordance with Langford’s land use and growth strategies, neighbouring municipalities TMPs for continuity at borders, and any multi-modal regional or provincial transportation plans. This study will examine Langford’s current transportation system, identify the constraints and opportunities to improve traffic flow with mode shift, and assess potential infrastructure upgrades. The TMP will consider mitigating strategies for high traffic and high-risk areas (e.g., traffic near current and future schools). n. Amend the language in Objective 4b: Develop an Active Transportation Plan to read: An Active Transportation Plan (ATP) will be developed in parallel with a Transportation Master Plan (TMP). It will reduce car dependency by improving the safety and connectivity of the multi-modal network throughout Langford for all travelers. The ATP will identify key corridors Page 110 of 190

Page 64–190

Page 111

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 18 of 19

and connections, including safe routes to schools, and including recommendations for active transportation infrastructure upgrades that are healthy, enjoyable, and convenient for people of all ages and abilities who choose to travel in many different ways: walking, biking, skateboarding, scooters, wheelchairs, transit, and other active mobility options. k. Remove Objective 5b: Ensure all Budgets are Fiscally Sustainable and Transparent (Funded, Ongoing) and replace it with the following two separate objectives: 5bi: Ensure all Budgets are Fiscally Sustainable (Funded, Ongoing) By ensuring strong financial controls, ensuring services are funded from the appropriate sources, building the City’s reserves, applying for a variety of grants, and ensuring that funds are allocated with a lens of equity and future generations, the City will ensure that its budgets are responsible and fiscally sustainable. 5bii: Ensure all Budget Documents are Transparent and User Friendly (Funded, Q1 2025) The City recognizes it is important for residents to be able to meaningfully participate in the annual budget process. While robust Council and Committee of the Whole meetings support this, the City will continually strive to improve the budget process and budget documents to ensure the public is best able to understand and participate in related decision-making. l. Amend the targeted completion date for Objective 5e: Develop and Equity, Diversity and Inclusion Strategy from Q4 2024 to Q4 2025. m. Add the following objective to Strategic Priority Six: Quality of Life Objective 6m: Explore Current Library Capacity and Community Needs (Unfunded, Ongoing) Currently, the City provides for library services for the residents, through the membership in the Greater Victoria Public Library (GVPL), through the Juan de Fuca Branch (at West Shore Parks and Recreation), the Goudy Branch (on Goldstream) and the Heritage Branch (in Westhills). The City has not expanded the number or capacity of libraries since 2016, despite the significant growth in population. With this in mind, the City will work with the GVPL to review capacity and community needs, and to potentially identify opportunities to expand library capacity within Langford. n. Relabel Objective 6c: Continue to Take Action Towards Reconciliation (Funded, Ongoing) from funded to partially funded. o. Rename Objective 6b from “Develop a Parks and Public Spaces Master Plan” to “Develop a Parks, Recreation and Trails Master Plan”. Page 111 of 190

Page 64–190

Page 112

Council’s 2023-2027 Strategic Plan Additional Information and Proposed Amendments 20231120 Council Report Page 19 of 19

p. Amend the Number of Schools in Langford advocacy item to note that schools are needed both in Langford and the West Shore. The amended language would read: Number Of Schools in Langford and the West Shore: Schools in School District 62 are beyond capacity in many areas of Langford and the West Shore, including some schools that have not even opened yet. School District 62 has identified that five additional schools are needed in the near future but has not secured funding for all of those schools from the Provincial Government. The City will be at the table with School District 62 and the Province to help secure additional schools for Langford and the West Shore. OR Option 2

  1. THAT Council approves the 2023-2027 Council Strategic Plan with the following amendments:

a. b. c.

OR Option 3

  1. THAT Council does not approve the strategic plan at this time.

SUBMITTED BY: Braden Hutchins, Director of Corporate Services Concurrence: Donna Petrie, Senior Manager of Economic Development and Communications Concurrence: Yari Nielsen, Director of Parks, Recreation and Facilities Concurrence: Matthew Baldwin, MCIP, RPP, Director of Planning and Subdivision Concurrence: Katelyn Balzer, P.Eng., Director of Engineering and Public Works Concurrence: Michael Dillabaugh, CPA, CA, Director of Finance Concurrence: Marie Watmough, Deputy Director of Corporate Services Concurrence: Darren Kiedyk, Chief Administrative Officer

Attachment 1: Analysis of Public Feedback on draft 2023-2027 Council Strategic Plan Attachment 2: Staff Report from October 23rd, 2023 Attachment 3: Draft 2023-2023 Council Strategic Plan Page 112 of 190

Page 64–190

Page 113

1 Open ended input from the consultation process In addition to the online input, additional open-ended input was received through four channels:

  1. Provided at the community consultation sessions,
  2. Provided by email and other correspondence,
  3. Provided from students during a consultation session at Belmont Secondary School
  4. Provided during the online consultation

It should be noted that the statistics below should not be read as input from single individuals. In some cases, a single individual provided multiple comments on different topics. The numbers below represent the number of times an issue was mentioned, not the number of people mentioning the topic.

It is also important to note that a small number of comments were not entirely clear, and it was difficult or impossible to determine exactly the topic being mentioned. Other comments were clearly in the domain of other jurisdictions, such as expanded parent involvement in schools. In some cases, it was not clear that the comment had to do with the draft strategic plan. For this reason, there is not an exhaustive list of every comment made, although every effort has been made to include all comments, positive and negative, that relate to the draft strategic plan. Summary General speaking, the open-ended input reflects much of the input collected by other means. Certain topics were dominant:

• Sustainable development • Housing • The environment and climate change • Urban forest and tree protection • Green spaces and public open spaces • Affordability • Public safety • Active transportation • Transit • The availability of healthcare • The unhoused

One noticeable difference in the open-ended input was the repeated emphasis on the needs of renters.

A second notable difference was the support among young people for a youth drop-in centre. However, the need for a youth drop-in centre was a direct question to the Belmont students, which was likely to generate a positive response. Page 113 of 190

Page 64–190

Page 114

2

There was a minor theme, mentioned 5-6 times, that the strategic plan should not reflect Council’s priorities, rather the public’s priorities. It should be noted that across Canada municipal strategic plans are overwhelmingly an articulation of the Council’s shared priorities.

It should be noted that the great majority of the responses received from all four input channels are requests for expanded or new City services.

Other suggestions are services (healthcare, schools) that are the responsibility of other levels of government or the School District, however the City as an important advocacy role in both areas. Comments from the public input sessions There were opportunities during the public input sessions for people to provide open-ended input, usually structured around the major issues facing the City, or the strategic themes themselves.

Quality of Life: The great majority of the input had to do with quality of life with 40 comments, some mentioned more than once.

There was support for:

• Placemaking when considering developments (particularly in the core) – 11 mentions • More parkland and greenspaces – 6 mentions • Additional police – 3 mentions • Crime reduction – 2 mentions • Reduced reliance on cars – 2 mentions • Lower taxes – 2 mentions • Free parking – 2 mentions • Light rail to downtown Victoria – 2 mentions • Expanded healthcare services – 2 mentions

There were concerns about:

• Mobility and accessibility (including in new developments) – 5 mentions • Homelessness and open drug use – 3 mentions • Unhoused in City parks – 2 mentions

The remaining topics were mentioned once and include; more urban forests, traffic, support for purchasing the YWCA, childcare availability, safe routes to schools, support for the RCMP facility expansion, compassion for the unhoused, using schools as an element of disaster planning. Page 114 of 190

Page 64–190

Page 115

3

Climate Crisis

There were nine comments that generally addressed the climate crisis, with two topics mentioned more than once.

There was support for:

• More cooling centres and community gardens– 3 mentions • Fire risk (especially on Bear Mountain) – 3 mentions

Other single mentions include; tree protection, heat islands, lighting for active transportation, and renters’ experience during heatwaves.

One person questioned whether there was a climate crisis, and suggested data would prove that there was not.

Housing/ Affordability

There were ten comments in this category including three issues that had multiple comments.

There was support for:

• Better defining affordability – 5 comments • The need for rent controls and public housing – 3 comments • Lower taxes – 2 comments

Other comments were mentioned only once each; the need for shelters for vulnerable populations, personal issues with mortgage rates, affordability for children and future generations.

Inequality

There were seven comments on this topic, none mentioned more than once, although several had to do directly or tangentially with renters.

The individual comments included; small business tax (relative to large industry), renter issues, the livability of condos.

One person was unsure that inequality was an issue.

Public Health

There were nine comments in this area, only one mentioned more than once. Page 115 of 190

Page 64–190

Page 116

4

There was support for:

• More clinics and doctor spaces in the City – 2 mentions

In addition, other topics were raised once including; the creation of a medical school in Langford, housing for doctors, the unreliability of the federal and provincial governments, creation a public health unit, greater emphasis on prevention, support for privatized healthcare.

Infrastructure Costs

There were ten issues raised in this topic, with two mentioned twice.

There was support for.

• Charging developers more – 3 mentions • Improved school capacity – 2 mentions

Individual comments included; the need for a homeless shelter, the need to end sprawl, insufficient service infrastructure, more healthcare space, the need to charge developers less to improve affordability.

Does the Strategic Plan go far enough to address the issues above?

There were fourteen comments raised in response to this question, some multiple times:

There was support for:

• The City reducing its use of contracted services – 4 mentions • Additional greenspace in the core – 3 mentions • Further protection of forests and wetlands – 3 mentions • Further protection of existing green spaces – 3 mentions

Other topics mentioned once include; greater focus on the need for public housing, building the economy, more input at city committees.

Two people made comments to the effect that life in the city is currently very good, and the issue of the various crises is overblown.

Are any other issues missing from the plan?

There were 20 topics raised in this entirely open-ended section, four more than once.

Page 116 of 190

Page 64–190

Page 117

5 There was support for:

• More focus on the concerns of renters– 7 mentions • Support for more coop housing – 3 mentions • Tax break for renters, inventory of available rentals – 2 mentions • Rent controls- 2 mentions

In addition, there was a wide variety of other issues raised once, including; compassion for the homeless, garden co-ops, trailer parks, parking, public participation at Council, the need for apartments with more bedrooms, safe spaces, concern that the public should have had more involvement in the creation of the strategic plan.

Collaborative Advocacy

In this section people were asked to check the areas most important to them (some may have checked more than one area).

In addition, there were write-in comments including:

• More funding for children with disabilities • Opposition to dedicated housing for seniors • Support for dedicated housing for seniors • Support for aging in place facilities • Affordable housing • Rent affordability 0 2 4 6 8 10 12 14 16 18 20 Numbder os Schools Transit and active transportation Health care and social services Social and non-market housing Public Safety Seniors housing and care Childcare Number Number Page 117 of 190

Page 64–190

Page 118

6 • Co-op housing

What is missing in collaborative advocacy?

There were 11 responses to this open-ended question, three with multiple responses.

There was support for:

• Encouraging other Greater Victoria municipalities to take their fair share of housing and density – 5 mentions • Ongoing engagement with the public – 3 mentions • A reconciliation task force – 3 mentions • More support for the unhoused – 2 mentions

In addition, there were single mentions of the following topics; community polarization, support for developers, renters’ issues, affordability. Emails and Correspondence Sixteen emails and letters were received covering a wide range of topics. As well, one person submitted an annotated copy of the draft strategic plan. Some of the emails covered multiple topics. Some individuals provided comments that they asked not to be publicly shared. For these reasons some comments have been rephrased to respect the confidentiality requests.

It should be noted that a few individuals took considerable time to write lengthy and thoughtful suggestions for improvement.

The key themes that were mentioned more than once in the emails included:

• General support for the plan (sometimes with some suggested minor amendments and wording changes) – 5 mentions • Strong support for more sustainable development – 3 mentions • Strong support for climate change initiatives – 3 mentions • Concerns about the process of developing the strategic plan. Some felt that the strategic plan should not be Council’s plan, but rather should have been developed to reflect the public’s priorities. - 3 mentions • The need for greater consultation on the draft plan – 3 mentions • Support for expanded urban forest – 2 mentions

There were single comments in the following areas:

• Expanded support for immigrants • Suggestions for reorganizing the layout of the draft plan Page 118 of 190

Page 64–190

Page 119

7 • Expanded library services • General support for expanded open government. • Construction fatigue (related to a specific site) • An exhortation for Council not to listen to extreme voices • Support for Council’s efforts to expand community engagement • The need for more playgrounds • Improve access to City information • Support for a five-year financial plan

Student Engagement To obtain input from a younger generation, a session was held at Belmont Secondary School. At this session a series of questions were explored that are related to the strategic plan, without undertaking a detailed review of the plan section by section.

What do you love about Langford?

Over 34 answers were provided, with only a few receiving multiple mentions; Those include

• Indigenous events (2), • Food Trucks (3), • Christmas decorations (2), • Wildlife (2), • Lakes (2), • Gyms (3) • Landscape (2).

Numerous other things were mentioned, including skate parks, Luxton fair, softball, air quality, bike trails, car show.

Do you plan to stay in Langford for work or school? Why and why not?

There were sixteen responses to this question. Three had multiple responses, including:

• Cost of living is a challenge - 3 responses • Need better transit – 2 mentions • Moving back to another country – 3 mentions

In addition, many indicated they have firm plans to go elsewhere for school or work, Langford lacks student housing, they will be staying in Langford to be close to family, want to take a trade program.

Page 119 of 190

Page 64–190

Page 120

8 Which recreation programs do you use? What do you enjoy about them? What can be improved.

There were 22 responses to this, only one topic mentioned more than once:

• YWCA pool – 2 mentions

Beyond that there were numerous and highly varied responses, to the first part of the question. They include; gyms, rugby, hiking trails, turf fields, Starlight Stadium, parks.

There were also some suggestions for improvements, including: More arenas, more basketball courts, more turf fields, better dog parks, more hiking trails, more drop-in sports, skate park, more specialized training facilities

Cities across the world are facing a climate crisis, what do you think government needs to do?

There were 26 responses to this question, all different, although many had to do with varying aspects of tree protection and forests. They include; more transit, end sprawl, clean up days, more gardens, forest protection, zero carbon buildings, better land use planning, active transportation infrastructure, invasive species, clean energy, litter, planning for extreme weather events.

What activities do you participate in outside of school?

There were 17 responses to this question including three areas with multiple responses:

• Volleyball – 2 mentions • Basketball – 2 mentions • Badminton – 2 mentions

In addition, there were number other responses; music, gym, running, climbing, air cadets, hockey, MMA, roller derby, hanging out at Tim’s.

What facilities or amenities do you wish to see more of in Langford?

There were 41 responses to this question, including five with multiple responses:

• Go karts – 5 mentions • Sidewalks – 2 mentions • More busses (currently too full) – 2 mentions • Swimming spots – 2 mentions • Mini golf – 2 mentions

Page 120 of 190

Page 64–190

Page 121

9 In addition, there was a wide range of other suggestions including (this may not be exhaustive): fast food, gyms, speedway, transit, concerts, festivals, sky trains, turf fields, Apple store, trampoline park, women’s clinic, murals, libraries, student parking at Belmont.

Do you think Langford should have a youth drop-in centre? If so, what activities would you want to see?

Twelve students supported the idea of creating a youth drop-in centre.

There were numerous areas of programming ideas where there was similar input:

• Swimming – 7 mentions • Pool table – 6 mentions • Karaoke and open mike nights – 4 mentions • Roller-skating – 4 mentions • Air hockey – 3 mentions • Dance studio – 2 mentions • Art – 2 mentions • Crafts – 2 mentions • Music lessons – 2 mentions • Music area – 2 mentions

In addition, numerous other programming ideas were suggested including (this may not be exhaustive), gaming, pinball, badminton, cooking, maker’s space, study spaces,

Do you feel connected to your community? Tell us why or why not.

Although the answers are difficult to quantify, many felt connected to the community due to the various things the city had to offer, such as sports, community events, outdoor spaces, friends, farmer’s markets. Others felt there was not a lot to do, and the city was boring.

Some suggestions on how to improve connection with the City included (this may not be exhaustive); more volunteer opportunities, more to do, diversity celebrations, more gathering spaces.

Open ended input from the online survey

The online survey allowed people to provide more detail about their rankings of the strategic objectives, and the challenges facing the City. The many hundreds of more detailed thinking have been reviewed by City staff. However, respondents’ priorities have been reported out in a previous report to Council, and the results are not changed by the more detailed explanations of their priorities. Page 121 of 190

Page 64–190

Page 122

10

However, the online survey also contained two fully open-ended questions:

Is there anything significant missing from the strategic plan?

There were numerous thoughts on this topic. In many cases people used this question as an opportunity to make general comments about the plan. Many were complimentary about the plan, while a smaller number thought it was overly broad. In terms of specific issues that people felt were missing there was a lengthy list, with some issue mentioned by more than one person:

• Unhoused -7 mentions (5 of the 7 mentions recommended that the City provide more supports for the unhoused, while 2 recommended that the unhoused be moved out of the City) • Safety – 5 mentions • Active Transportation – 5 mentions • Public health and health services – 5 mentions • Housing – 4 mentions • Traffic and road safety – 4 mentions • Economic development – 4 mentions • Recreation facilities – 3 mentions • Taxes – 2 mentions • Public spaces – 2 mentions • Food security – 2 mentions • Dog parks – 2 mentions • Infrastructure • Sports • City expenditure control • Transit • Worker’s rights • Over regulation • Short term rentals • RCMP facility • Parks maintenance • Arts and culture • Over development • Additional arena • More schools

In addition to the issues listed above, many respondents indicated they could not think of any missing elements.

Page 122 of 190

Page 64–190

Page 123

11 Langford currently has a population of approximately 50,000 residents. What are the most important things the City can do to plan for Langford at 80,000 residents, while increasing quality of life and sustainability?

Answers to this question were highly varied with some topics receiving multiple mentions.

• Expand active transportation – 20 mentions (19 in support, 1 opposed) • Expand/protect public and green spaces – 18 mentions • Intensification/densification -14 mentions (11 in support, 3 opposed) • Address traffic congestion – 12 mentions • Expand infrastructure (especially roads) – 11 mentions • Affordable housing – 11 mentions • Expanded transit – 10 mentions • More healthcare services – 9 mentions • Improved public safety (police fire, emergency preparedness) – 8 mentions • Expand public consultation/communications – 6 mentions • Economic development/support for business – 5 mentions • Address the unhoused – 4 mentions (2 support more services, and 2 support removing the unhoused) • More schools – 3 mentions • Lower taxes – 3 mentions • Improved parking – 2 mentions • More festivals and events • Lower cost of living • Short term rentals • New arena • Loser development charges • Construction impact mitigation Page 123 of 190

Page 64–190

Page 124

t 250.478.7882 e administration@langford.ca 2nd Floor, 877 Goldstream Avenue Langford, BC V9B 2X8

Staff Report to Council

DATE: Monday, October 23, 2023 DEPARTMENT: Administration SUBJECT: 2023-2027 Draft Council Strategic Plan – Initial Rollup of Public Engagement Feedback

BACKGROUND: In January of 2023, the City issued a request for proposals to several consultants who specialize in assisting local governments with strategic planning. Through this process, James Ridge was selected to support the creation of Langford’s strategic plan. The selection was based on his background in local government and the wealth of experience Mr. Ridge has in this area. In addition, he is a Langford resident, and brings an understanding of the local community.

Throughout the spring and summer of 2023, Mr. Ridge conducted a series of workshops with Council and senior staff to guide the strategic planning process. The 2023-2027 Draft Council Strategic Plan was made available to the public for input in September 2023.

The draft Plan articulates Council’s vision and values and sets bold objectives that will guide the City in addressing the urgent challenges related to continued growth in population, public health, housing unaffordability, increasing infrastructure costs, social inequity, and climate change. It is centred around six strategic priority areas, and individual objectives in each of those areas. For each objective, the Plan sets out an estimated timeline and whether the planned work is currently funded or will be funded in future budgets. The Plan enables Council – and staff – to carefully prioritize and maximize the use of available resources to ensure that Langford remains sustainable, healthy, vibrant, inclusive, affordable and innovative for generations to come.

The 2023-2027 Draft Council Strategic Plan also recognizes the City’s important role as an advocate for those critical services beyond a typical local government mandate, including health care, transportation, housing, and education, and commits to proactively supporting partners undertaking this critical work for the community.

Lastly, in developing the 2023-2027 Draft Council Strategic Plan, it was clear that Langford, like all communities across Canada, is facing a diverse and complex set of crises so immense that they require the entire community to work towards a shared vision and set of goals and to collaboratively address these crises. Engagement on the 2023-2027 Draft Council Strategic Plan was the public’s first opportunity to comment on the objectives of Council, recognizing that many of the objectives in the Plan will require robust community engagement in the coming months and years. Page 124 of 190

Page 64–190

Page 125

2023-2027 Council Strategic Plan 20231023 – Report to Council Page 2 of 3

The intent of this report is to provide Council with the initial roll-up of feedback received from the public regarding the draft 2023-2027 Draft Council Strategic Plan. Given the volume and quality of written responses received, staff suggest that Council defer approval of the Strategic Plan until staff have had sufficient time to analyze the feedback.

COMMENTARY: Council invited input from the public through a variety of forums on the 2023-2027 Draft Council Strategic Plan to ensure that the diverse needs of all citizens are heard.

Public engagement opportunities included:

• Online Survey (LetsChatLangford.ca) o Launched September 21, 2023 and closed October 15, 2023 • Public Open House o Wednesday, October 4, 2023, 3pm to 8 pm, Eagle Ridge Community Centre • Council Engagement Pop-up Events o Goldstream Farmers Market, October 7, 2023, 10 am to 2 pm o Poncho's Café, 115-755 Goldstream Avenue, October 10, 2023, 10 am to 12 pm • Written Submissions o Received from September 21, 2023, to October 15, 2023.

Through these engagement opportunities, almost 200 individuals completed the online survey, approximately 75 individuals attended the public open house and contributed their feedback on poster boards, and approximately 15 individuals contributed written submissions.

This report provides an initial roll-up of the feedback received through the online surveys (see Appendix 1). Given the volume and quality of the feedback received from the public, staff require additional time to review and analyze the results, and to be able to recommend any amendments to the 2023-2027 Draft Council Strategic Plan, based on the public feedback.

FINANCIAL IMPLICATIONS: The objectives of the 2023-2027 Draft Council Strategic Plan are ambitious and will require substantial resources, with many of the objectives currently unfunded or partially funded. For example, Objective 6h (implementing the recently developed Fire Master Plan) and Objective 6j (support the expansion of the RCMP facility) will both require substantial financial contributions (as detailed during the City’s 2023 budget process).

It is important to note that the approval of the 2023-2027 Draft Council Strategic Plan does not secure funding for any of the objectives contained therein. Rather, it is anticipated that for any objective that is Page 125 of 190

Page 64–190

Page 126

2023-2027 Council Strategic Plan 20231023 – Report to Council Page 3 of 3

partially funded or unfunded, that further discussion and approval by Council will be required on a case- by-case basis, through the annual budget process or an individual report to Council.

LEGAL IMPLICATIONS: While there is no legal requirement in provincial legislation for a local government to have a strategic plan, it is considered best practice for local governments to have one, especially those the size of Langford. OPTIONS: Option 1 THAT Council receive this report for information and given the volume and quality of written responses received from the public, that Council defers approval of the Strategic Plan until after staff has had sufficient time to analyze the public feedback and present it to Council for consideration.

OR Option 2 THAT Council direct staff to make the following amendments to the 2023-2027 Council Strategic Plan, recognizing there is additional public input to come forward:

a. _______ b. _______ c. _______

Option 3 THAT Council approve the 2023-2027 Council Strategic Plan.

SUBMITTED BY: Braden Hutchins, Director of Corporate Services Donna Petrie, Senior Manager of Communications and Economic Development Concurrence: Yari Nielsen, Director of Parks, Recreation and Facilities Concurrence: Matthew Baldwin, MCIP, RPP, Director of Planning and Subdivision Concurrence: Katelyn Balzer, P.Eng., Director of Engineering and Public Works Concurrence: Michael Dillabaugh, CPA, CA, Director of Finance Concurrence: Marie Watmough, Deputy Director of Corporate Services Concurrence: Darren Kiedyk, Chief Administrative Officer

Attachment 1 – Graphs from Let’s Chat Langford Attachment 2 – Draft 2023-2027 Council Strategic Plan Page 126 of 190

Page 64–190

Page 127

2023-2027 Council Strategic Plan DRAFT Page 127 of 190

Page 64–190

Page 128

Land Acknowledgment The City of Langford acknowledges and honours the traditional territories of the Coast Salish, specifically Xwsepsum (Esquimalt), Lekwungen (Songhees), Sc’ianew (Beecher Bay), and the W̱SÁNEĆ Peoples represented by the Tsartlip, Pauquachin, Tsawout, Tseycum, and Malahat Nations. Page 128 of 190

Page 64–190

Page 129

Contents Message from Mayor and Council 3 A Pathway Forward 5 Vision 7 Core Values 8 Our Shared Crises Unite Us for a Better Tomorrow 9 Strategic Priority One:

Sustainable Development 11 Strategic Priority Two:

Climate Change and Environmental Stewardship 15 Strategic Priority Three: Economic Development 17 Strategic Priority Four: Transportation 19 Strategic Priority Five: Good Governance 21 Strategic Priority Six: Quality of Life 24 Collaborative Advocacy 28 Throughout this document you will notice a variety of icons that detail whether an objective is funded, partially funded or not funded and whether an objective aims to support one of the five noted crises in the introductory commentary.

FUNDED

NOT FUNDED

PARTIALLY FUNDED

HOUSING

PUBLIC HEALTH INFRASTRUCTURE COST

CLIMATE

INEQUALITY LEGEND 2023-2027 STRATEGIC PLAN CITY OF LANGFORD 2 Page 129 of 190

Page 64–190

Page 130

Message from Mayor and Council Langford is a dynamic, vibrant city. As one of the fastest growing cities in Canada, it is culturally diverse, a sports and recreation hub, and the commercial centre for the West Shore. The City offers educational options for people of all ages (a unique post-secondary campus is scheduled to open in 2024), a range of housing opportunities including an innovative attainable home ownership program, and consistently delivers a wide range of services to enhance the quality of life for residents. Individually, and collectively as Council, we are grateful for the opportunity to serve such a vibrant and diverse community and look forward to following through on our promises to: Increase deep listening, transparency, and access to the municipal government; Establish a shared vision for Langford; Consider the diverse needs of all citizens in decision-making; Apply the lens of Reconciliation with First Nations to City decisions and projects and; Develop and maintain important partnerships with individuals and organizations that can support Langford to achieve its long-term goals. A critical component of being accountable to these commitments is the development of Langford Council’s first strategic plan. Developed over the past months, the plan articulates our vision and values, and sets bold objectives that will guide the City in addressing the urgent challenges related to continued growth in population, public health, housing unaffordability, increasing infrastructure costs, social inequity and climate change. As we work together to meet these commitments and achieve the objectives in this strategic plan, we commit to governing responsibly, respectfully and strategically, with a focus on transparency, fiscal responsibility, and the careful management of assets. We will do this in collaboration with our key partners, whether local, regional or national, and by expanding public engagement opportunities. From left to right: Mary Wagner, Colby Harder, Mark Morley, Scott Goodmanson, Keith Yacucha, Kimberley Guiry, Lillian Szpak Page 130 of 190

Page 64–190

Page 131

We plan to address the climate crisis by taking urgent, intentional action to both mitigate and adapt to the dramatic changes faced by all. We want Langford to be as prepared as possible to make sound decisions to address the impacts of climate change on every aspect of the community, not just in the short term, but for future generations. We commit to addressing the housing affordability and inequity crisis by approving a variety of housing options, in a way that is sustainable, and focused on high quality design and amenities in both public and private spaces. We will support quality of life by creating opportunities for community connection through creative placemaking projects. We will continue to promote the thriving economic engine in Langford with a focus on supporting existing businesses and diversifying the economic base to reduce the need for Langford residents to commute outside of the City for work. We commit to improving transportation choices for residents by expanding active transportation infrastructure and planning for growth in a way that allows for and encourages a variety of transportation options. We seek to enhance our role as advocates for those critical services beyond our purview including health care, transportation, housing, and education. Proactive and collaborative working relationships will be essential to building a complete community. While the strategic plan sets out bold and meaningful steps to address current and future issues, we—and future councils—will need to carefully prioritize and maximize the use of available resources to ensure beneficial and long-lasting outcomes. Our vision is to ensure that Langford remains sustainable, healthy, vibrant, inclusive, and innovative for generations to come. We look forward to working with you to make this strategic plan a reality. Sincerely, 2023-2027 STRATEGIC PLAN CITY OF LANGFORD 4 Page 131 of 190

Page 64–190

Page 132

This is the City of Langford’s first strategic plan. It sets out the shared strategic vision of Council for the next four years, and in some cases beyond. The plan reflects Council’s six strategic priorities, and individual objectives in each of those areas. For each objective, the plan sets out an estimated timeline and whether or not the planned work is currently funded or will be funded in future budgets. A Pathway Forward Page 132 of 190

Page 64–190

Page 133

In many cases the objectives include the development of other plans. Langford has never had a Master Transportation Plan, an Urban Forest Management Plan, an Economic Development Plan, an Arts and Culture Plan, a Comprehensive Asset Management Plan, and other plans that are best practices for a City the size of Langford. This strategic plan is the catalyst for beginning that work. Collectively, the objectives in the plan are ambitious and will require substantial resources and innovative leadership from both Council and City staff. However, once implemented they will substantially improve the quality of life in Langford. Many of the objectives in this plan will require robust community engagement, and Council is committed to ensuring that happens. Lastly, this plan will be reviewed by Council annually and new priorities considered as appropriate to reflect the community’s changing needs. In many cases the objectives include the development of other plans. Langford has never had a Master Transportation Plan, an Urban Forest Management Plan, a Parks and Public Space Master Plan, an Economic Development Plan, an Arts and Culture Plan, a Comprehensive Asset Management Plan, or other plans that are best practices for a City the size of Langford. This strategic plan is the catalyst for beginning that work. Collectively, the objectives in the plan are ambitious and will require substantial resources and innovative leadership from both Council and City staff. However, once implemented they will substantially improve the quality of life in Langford. Many of the objectives in this plan will require robust community engagement, and Council is committed to ensuring that happens. Lastly, this plan will be reviewed by Council annually, and new priorities will be considered as appropriate to reflect the community’s changing needs. 2023-2027 STRATEGIC PLAN CITY OF LANGFORD 6 Page 133 of 190

Page 64–190

Page 134

To create a vibrant, thriving, inclusive and climate resilient community by making informed decisions for current and future generations including residents, businesses, and visitors. Vision Page 134 of 190

Page 64–190

Page 135

COMMUNITY INVOLVEMENT embodies inclusivity, collective progress, and active democracy. It is the commitment to engaging within the community, valuing every voice, and fostering equality. By going further together, we forge unity through diverse participation, communicating democratic ideals of fairness and shared decision-making. ETHICS AND INTEGRITY encompass a set of unwavering principles that shape our actions. It involves being reliable and dedicated, consistently choosing the right path. It demands accountability and fairness, upholding moral values that guide our conduct. It’s about distinguishing right from wrong and committing to doing what is just and trustworthy. ENVIRONMENTAL STEWARDSHIP is the conscientious practice of safeguarding our surroundings for present and future generations. It involves cultivating resilience in the face of an uncertain climate future, responsibly managing and conserving natural resources and spaces. This approach establishes the bedrock for sustainable land use decisions, treating the environment as essential infrastructure, warranting investment and prioritization. FINANCIAL STABILITY is the ability to balance current and future needs and demands, while directing resources to maximize social benefits. It ensures goal attainment, while preparing for unforeseen events, creating a resilient and sustainable financial state, while maintaining community well-being. CONTINUOUS LEARNING is an ongoing and lifelong pursuit of knowledge, skills, and personal and organizational development. It involves staying receptive to new ideas, adapting to changing circumstances, and consistently acquiring fresh insights. This process fosters adaptability, growth, and improvement. Core Values 2023-2027 STRATEGIC PLAN CITY OF LANGFORD 8 Page 135 of 190

Page 64–190

Page 136

Langford, like so many communities across Canada, is facing a diverse and complex set of crises so immense that they require the entire community to define a shared set of goals and to continually come together so that we may thrive, and potentially overcome, these crises. The Climate Crisis poses a looming shadow over our collective livelihoods. From the current drought and wildfires throughout much of British Columbia, to the ever-increasing risk of wildfires and smoke on Vancouver Island, to the heat dome and atmospheric river in 2021, Langford and its residents are not immune from the impacts of climate change. While we grapple with a changing climate, Langford and the rest of the region are also in the midst of a Housing Affordability Crisis. Single family homes are now out of reach for the average family, monthly rental costs take up an unsustainable portion of take-home incomes, and the lack of housing is forcing some Langford residents into compromised living situations. Linked to housing challenges is a growing Inequality Crisis. Income levels are not keeping pace with increasing costs of basic needs and inflation is at levels that has not been seen in over twenty years. These pressures are requiring everyone, but in particular single parent families, low-income earners and underrepresented and marginalized groups, to make trade-offs between the necessities of life – shelter, healthy food, and access to basic amenities. Both the housing affordability crisis and the inequality crisis are, of course, linked with the ongoing Public Health Crisis. Langford and the region are struggling to attract and retain doctors, nurses and other healthcare professionals and, at the same time, the lack of primary care physicians is placing additional demands on hospital emergency rooms, urgent primary care centres and social service providers. Moreover, Langford is encountering an increase in individuals experiencing mental health and addiction challenges. Our Shared Crises Unite Us for A Better Tomorrow Page 136 of 190

Page 64–190

Page 137

The increased Infrastructure Cost Crisis – driven by the rising price of good and services is causing all local governments, including Langford, to either significantly raise taxes or reduce service levels to maintain existing public amenities and build essential infrastructure. This strategic plan is built around the urgent need to collectively address these five crises, all while ensuring quality of life and good governance for the entire community. In the strategic themes that follow, icons are used to illustrate how each objective may support one or more of the five crises. While working together for a better tomorrow, Council will remain grounded in our core values of community involvement, environmental stewardship, continuous learning, ethics, integrity, and financial stability. We must ensure that all residents and community partners, regardless of their background or views, are seen and heard when working collectively to solve these complex challenges, even if we disagree. Council will strive to enable everyone to feel not only safe – but encouraged – to participate in our democratic system, as it is only when everyone is included that we are capable of meaningful change. And lastly, we must use these overlapping crises as our inspiration, our driving force, to work together, as we have in the past, for the betterment of current residents, businesses, and community organizations, and, perhaps most importantly, for the generations still to come. DESPITE THESE CHALLENGES – THESE OVERLAPPING CRISES – WE MUST NOT GIVE UP HOPE. 2023-2027 STRATEGIC PLAN CITY OF LANGFORD 10 Page 137 of 190

Page 64–190

Page 138

Sustainable Development STRATEGIC PRIORITY ONE The City is committed to continuing to develop Langford with an intentional and sustainable approach. This requires the careful and deliberate consideration of each decision regarding land use, housing, recreation, transportation and infrastructure. The City must consider the environmental impact of designs, materials and processes used for all new and renovated buildings, consistently and carefully with the lens of current residents and businesses, as well as future generations. The City will take active steps to help mitigate and manage the impact of construction on the environment. The City’s Official Community Plan will be refreshed. This will stimulate revised and new policies, standards, practices, and initiatives, each designed to support development while protecting the environment and supporting Langford’s long-term sustainable development goals.

FUNDED

NOT FUNDED

PARTIALLY FUNDED

HOUSING

PUBLIC HEALTH INFRASTRUCTURE COST

CLIMATE

INEQUALITY LEGEND Page 138 of 190

Page 64–190

Page 139

OBJECTIVES An Urban Forest Management Plan will provide detailed information, recommendations and resources needed for the City to effectively and proactively manage and enhance its urban tree canopy. 1a | REFRESH THE OFFICIAL COMMUNITY PLAN (OCP) The Official Community Plan does not require a full rewrite, but rather needs a refresh to reflect the current realities facing Langford and the region. This refresh will include community and partner engagement to obtain feedback on what is working and not working with the current plan, and to ensure the goals and priorities of the community and Council are incorporated. It will also address inconsistencies between the Official Community Plan and the South Langford Neighbourhood Plan which preceded it. Targeted Completion Date: Q2 2025

1b | UPDATE AMENITY CONTRIBUTION POLICY An updated amenity contribution policy will help align the needs of the community with the financial value conveyed to development lands through rezoning. Targeted Completion Date: Q4 2024

1c | CREATE EARLY GUIDANCE FOR THE DEVELOPMENT COMMUNITY The Early Guidance was approved by Council on May 18, 2023. It provides the development community and residents with information regarding Council’s initial priorities and expectations for new development proposals. It is expected that elements of the Early Guidance will be the subject of specific work programs that will include appropriate processes and public engagement and will ultimately lead to Council consideration and decisions. Targeted Completion Date: Complete

1d | UPDATE DESIGN GUIDELINES AND CONSIDER AN ADVISORY DESIGN PANEL The Design Guidelines provide guidance and direction on a variety of features related to site layout, architectural design and landscaping. Updated Design Guidelines will incorporate relevant elements of the objectives outlined in the early guidance to the development community and this strategic plan. Part of this update will be the consideration of an advisory design panel, which could support both the review and the implementation of the updated guidelines. Targeted Completion Date: Q1 2025

Develop an Urban Forest Management Plan CITY OF LANGFORD 2023-2027 STRATEGIC PLAN 12 Page 139 of 190

Page 64–190

Page 140

1e | DEVELOP A CLIMATE ACTION DEVELOPMENT PERMIT AREA BYLAW A Climate Action Development Permit Area Bylaw will enable the City to employ new powers granted by the Province, as well as direction set in the forthcoming Climate Action Master Plan, to ensure that development is resilient to a growing community and changing climate. Targeted Completion Date: Q1 2025

1f | DEVELOP A CONSTRUCTION IMPACT MANAGEMENT STRATEGY AND ‘GOOD NEIGHBOUR’ POLICY This strategy and policy will result in a written commitment from each developer and business at the earliest stage of permitting on how they intend to be a “good neighbour”. It is in everyone’s best interest to accommodate growth, development, and business operations in such a way that is reasonably livable for neighbouring residents. Its success will require an additional Bylaw officer dedicated to site inspections and enforcement of these commitments. Targeted Completion Date: Q2 2024

1g | DEVELOP AN URBAN FOREST MANAGEMENT PLAN An Urban Forest Management Plan will provide detailed information, recommendations and resources needed for the City to effectively and proactively manage and enhance its urban tree canopy. Targeted Completion Date: Q3 2024

1h | DEVELOP AN INTERIM TREE PROTECTION BYLAW The Interim Tree Protection Bylaw is a stop-gap measure to regulate the cutting of trees outside of the development permit areas until the Urban Forest Management Plan is completed. Targeted Completion Date: Complete

1i | REVIEW THE ZONING BYLAW PARKING REQUIREMENTS IN THE CITY CENTRE This review will ensure that off-street parking standards, and other transportation demand management requirements, are suitable for a densifying City Centre, encourage the development of affordable housing in the downtown, and support local business and the new post-secondary campus. Targeted Completion Date: Q3 2024

1j | REVIEW DOWNTOWN PUBLIC PARKING NEEDS AND RELATED POLICIES This review will enable the City to better understand the parking needs of residents, businesses, commuters and the forthcoming Langford post-secondary campus, all with the goal of building a thriving downtown core. Targeted Completion Date: Q2 2024

OBJECTIVES

FUNDED

NOT FUNDED

PARTIALLY FUNDED

HOUSING

PUBLIC HEALTH INFRASTRUCTURE COST

CLIMATE

INEQUALITY LEGEND Page 140 of 190

Page 64–190

Page 141

1k | UPDATE THE HOUSING NEEDS REPORT A Housing Needs Report is a Provincial requirement for determining current and projected housing needs, especially in the areas of affordable housing, rental housing, housing for families, housing for people with disabilities, housing for seniors and housing for the unhoused. A report and subsequent updates are required every 5-years. Targeted Completion Date: Q4 2024

1l | CONTINUE TO MAKE STRATEGIC LAND AND FACILITY ACQUISITIONS To achieve City goals and objectives (including those outlined in this document), each year the City budgets for strategic acquisitions of land and/or facilities. For example, the City recently secured the last of four residential houses on Atkins and Winster to allow for the planned RCMP facility expansion. The City keeps most planned land/facility acquisitions confidential so not to affect costs or create unnecessary uncertainty and competition. Targeted Completion Date: Ongoing

1m | PURSUE PROGRAMS AND PARTNERSHIPS FOR AFFORDABLE HOUSING The City can and does support affordable housing through its Affordable Housing Program, Attainable Housing Program, grants to the not-for-profit sector, tax exemptions, and activation of City owned land. It can also support affordable housing through the strategic development and application of land use and tenant assistance policies. Lastly, the City can pursue Provincial and Federal grants, such as the Housing Accelerator Fund, to support the development of affordable housing. The City will continue to aggressively pursue these initiatives to help address the housing affordability crisis that so many residents are facing. Targeted Completion Date: Ongoing

A Housing Needs Report is a Provincial requirement for determining current and projected housing needs, especially in the areas of affordable housing, rental housing, housing for families, housing for people with disabilities, housing for seniors and housing for the unhoused. A report and subsequent updates are required every 5-years. Update the Housing Needs Report OBJECTIVES CITY OF LANGFORD 2023-2027 STRATEGIC PLAN 14 Page 141 of 190

Page 64–190

Page 142

Climate Change and Environmental Stewardship STRATEGIC PRIORITY TWO Few issues are more critical to health, well-being and, indeed, our very survival, than climate change. The City has a key role to play in mitigating the effects of climate change on the community. It can, for example, reduce the environmental impact of its own activities, particularly with city vehicles and facilities. It can identify and implement food security initiatives, continue to improve stormwater and emergency response systems, and develop strategies for disaster mitigation due to climate change. The City’s intentional climate change work will require extensive collaboration and partnerships, as well as ongoing monitoring and creative solutions to issues large and small.

FUNDED

NOT FUNDED

PARTIALLY FUNDED

HOUSING

PUBLIC HEALTH INFRASTRUCTURE COST

CLIMATE

INEQUALITY LEGEND Page 142 of 190

Page 64–190

Page 143

OBJECTIVES In coordination with the City’s Emergency Program, and all city departments, this role would coordinate all City climate action and sustainability initiatives. 2a | DEVELOP A CLIMATE ACTION MASTER PLAN INCLUDING TARGETS FOR EMISSION REDUCTIONS The climate crisis is bearing down on communities across the country and immediate action is needed. The Climate Action Master Plan will guide Langford’s next steps. Targeted Completion Date: Q1 2025

2b | HIRE A CITY CLIMATE CHANGE SPECIALIST In coordination with the City’s Emergency Program, and all city departments, this role would coordinate all City climate action and sustainability initiatives. Targeted Completion Date: Q3 2024

2c | REVIEW AND ACTION THE FOOD SECURITY POLICY AS DETAILED IN THE OCP Identify and implement food security initiatives (e.g. community gardens) and support local farmers through partnerships and funding programs. Targeted Completion Date: Q2 2025

2d | UPDATE THE STORM WATER MANAGEMENT REQUIREMENTS Complete an in-depth review and update of the Storm Water Management requirements including consideration for intensity, duration and frequency of significant storm events due to climate change. Targeted Completion Date: Q4 2024

2e | DEVELOP STRATEGIES FOR DISASTER MITIGATION DUE TO CLIMATE CHANGE AND BUILD RESILIENCY AS A COMMUNITY The City must act swiftly to develop and update strategies to manage the diverse types of climate impacts predicted for the region, including prolonged heat events, significant storms, droughts, wildfires and associated smoke. Targeted Completion Date: Ongoing

Hire a City Climate Change Specialist CITY OF LANGFORD 2023-2027 STRATEGIC PLAN 16 Page 143 of 190

Page 64–190

Page 144

Economic Development STRATEGIC PRIORITY THREE Langford enjoys a resilient and economically diverse economy. To sustain and enhance this vitality, the City will need to develop a robust economic development plan that sets out specific goals to retain existing businesses, attract new ones, and in cooperation with partners, grow and diversify employment opportunities, all in a way that mitigates harm to the environment and contributes to sustainable development. The opening of a downtown post-secondary campus will revitalize the downtown core in many ways, will enable the City to better attract and retain talent, and will contribute to Langford’s sustained economic vibrancy. Soulful Sister

FUNDED

NOT FUNDED

PARTIALLY FUNDED

HOUSING

PUBLIC HEALTH INFRASTRUCTURE COST

CLIMATE

INEQUALITY LEGEND Page 144 of 190

Page 64–190

Page 145

3a | DEVELOP AN ECONOMIC DEVELOPMENT PLAN An Economic Development Plan will support existing businesses, attract needed talent and work to attract new investment into the community. Targeted Completion Date: Q4 2024

3b | ACTIVELY SUPPORT THE EVOLUTION OF THE DOWNTOWN POST SECONDARY CAMPUS A downtown post secondary campus will enhance the development and vitality of Langford’s downtown core, remove barriers to post-secondary and ongoing education for residents, provide an innovation studio for entrepreneurs, and inspire West Shore youth to plan for their future. Targeted Completion Date: Ongoing

3c | EXPLORE WAYS TO INCENTIVIZE AND ATTRACT TECHNOLOGY COMPANIES The technology sector will provide well paying jobs and will further diversify Langford’s economy. Targeted Completion Date: Q4 2025

3d | IMPLEMENT THE FIVE-YEAR TOURISM STRATEGY The Five-Year Tourism Strategy will expand Langford’s visitor economy, support destination development and add revenue to Langford businesses. Targeted Completion Date: Ongoing

3e | CONTINUE TO SUPPORT THE FILM INDUSTRY The film economy is critical to supporting the local economy as noted in the five-year tourism strategy. The City is working with the Film Commission and developers to attract a Studio which will further support Langford’s position as an economic hub, support destination development strategies, provide well-paid jobs and sector specific educational opportunities for youth. Targeted Completion Date: Ongoing

3f | CREATE AN ARTS AND CULTURE STRATEGIC PLAN An arts and culture strategic plan will set the path forward for Langford to become a destination for the arts and will showcase and celebrate the diverse cultures in Langford. It will also clarify the arts and culture space needs of Langford residents, with a focus on inclusivity and accessibility. Targeted Completion Date: Q1 2025

OBJECTIVES An Economic Development Plan will support existing businesses, attract needed talent and work to attract new investment into the community. Develop an Economic Development Plan CITY OF LANGFORD 2023-2027 STRATEGIC PLAN 18 Page 145 of 190

Page 64–190

Page 146

Transportation STRATEGIC PRIORITY FOUR Langford’s extensive road network primarily accommodates traditional vehicular traffic. With some roads reaching capacity at peak hours, in a rapidly growing community, and given the urgent need for climate action, there is an immediate opportunity to create awareness and to encourage and support residents shift to alternatives modes of transportation. Advances in wide-spread transportation research, technology, and resource availability makes incorporating changes to the City’s transportation planning and network feasible now. Providing additional alternative modes of public and active transportation infrastructure that are protected, connected, convenient, and cost effective will encourage mode shift, reduce road congestion and reduce greenhouse gas emissions.

FUNDED

NOT FUNDED

PARTIALLY FUNDED

HOUSING

PUBLIC HEALTH INFRASTRUCTURE COST

CLIMATE

INEQUALITY LEGEND Page 146 of 190

Page 64–190

Page 147

OBJECTIVES 4a | DEVELOP A TRANSPORTATION MASTER PLAN The Transportation Master Plan (TMP) will be Langford’s first official long-term guide for the planning, design, and development of multi-modal transportation infrastructure in accordance with Langford’s land use and growth strategies, neighbouring municipalities TMPs for continuity at borders, and any multi-modal regional or provincial transportation plans. This study will examine Langford’s current transportation system, identify the constraints and opportunities to improve traffic flow with mode shift, and assess potential infrastructure upgrades. Targeted Completion Date: Q3 2025

4b | DEVELOP AN ACTIVE TRANSPORTATION PLAN An Active Transportation Plan (ATP) will be developed in parallel with a Transportation Master Plan (TMP). It will reduce car dependency by improving the safety and connectivity of the multi-modal network throughout Langford for all travelers. The ATP will identify key corridors and connections including recommendations for active transportation infrastructure upgrades that are healthy, enjoyable, and convenient for people of all ages and abilities who choose to travel in many different ways: walking, biking, skateboarding, scooters, wheelchairs, transit, and other active mobility options. Targeted Completion Date: Q3 2025

4c | IMPROVE AND EXPAND ACTIVE TRANSPORTATION INFRASTRUCTURE In accordance with Langford’s Sidewalk and Multi-Use Path Matrix (until the Active Transportation Plan is established), projects will be identified and completed annually. Targeted Completion Date: Ongoing

4d | CREATE AWARENESS AND OPPORTUNITIES FOR TRANSPORTATION MODE SHIFT Staff will continue to work with BC Transit to improve bus-stop infrastructure and allow for more stops where ridership dictates, accommodate requests for car and bike share stalls, expand public EV charging infrastructure, encourage densification in Langford’s city-center, and incentivise developments to integrate active transportation infrastructure in their design. Targeted Completion Date: Ongoing

CITY OF LANGFORD 2023-2027 STRATEGIC PLAN 20 Page 147 of 190

Page 64–190

Page 148

Good Governance STRATEGIC PRIORITY FIVE The City is strongly committed to providing high-quality and responsive public service. As such, it strives to provide services that reflect growing community needs, with the lens of continual evaluation, also improvement, transparency, and fiscal responsibility. Council is also strongly committed to govern in ways that are responsive, collegial and respectful of the public’s need to be informed and engaged. Council strives to foster greater public engagement and to demonstrate, in all of its work, the highest level of fiscal responsibility. It also seeks to work closely with regional partners and provide leadership whenever feasible. Working collaboratively with staff, Council also must ensure that the City meets all provincially mandated legislative responsibilities; that the City’s assets are properly maintained for future generations; and that the City administration is appropriately resourced to provide modern, efficient, high-quality and professional services.

FUNDED

NOT FUNDED

PARTIALLY FUNDED

HOUSING

PUBLIC HEALTH INFRASTRUCTURE COST

CLIMATE

INEQUALITY LEGEND Page 148 of 190

Page 64–190

Page 149

OBJECTIVES 5a | BE AT THE TABLE FOR STRATEGIC REGIONAL DISCUSSIONS AND DECISIONS As the third largest municipality in the region, and the economic centre of the West Shore, the City will take a leadership role in regional discussions and decision-making. Targeted Completion Date: Ongoing

5b | ENSURE ALL BUDGETS ARE FISCALLY SUSTAINABLE AND TRANSPARENT By ensuring services are funded from the appropriate sources, building the City’s reserves, applying for a variety of grants, and ensuring that amenity funds are spent with a lens of equity and future generations, the City will ensure that its budgets are responsible and fiscally sustainable. Targeted Completion Date: Ongoing

5c | EXPAND OPPORTUNITIES FOR PUBLIC ENGAGEMENT Improved public engagement will better connect the residents with City Hall by promoting inclusivity, collective progress, and active democracy. Council has already implemented the hiring of additional staff and the City has launched its Facebook page and Let’s Chat Langford to support this objective. Targeted Completion Date: Ongoing

While the City has a Freedom of Information program, the City will explore an open data program for information that can be routinely released and may provide benefit for business or other public needs. Improve Access to City Information CITY OF LANGFORD 2023-2027 STRATEGIC PLAN 22 Page 149 of 190

Page 64–190

Page 150

5d | IMPROVE ACCESS TO CITY INFORMATION While the City has a Freedom of Information program, the City will explore an open data program for information that can be routinely released and may provide benefit for businesses or other public needs. Targeted Completion Date: Q4 2026

5e | DEVELOP AN EQUITY, DIVERSITY, AND INCLUSION STRATEGY Langford’s residents, including newcomers, represent a wide range of cultural backgrounds and diverse voices. An Equity, Diversity and Inclusion Strategy will enable all City representatives, be it elected officials, committee members, City staff, contractors, and other volunteers, to understand, respect and celebrate what makes us each unique, and importantly, help to ensure all residents are treated equally. Targeted Completion Date: Q4 2024

5f | IMPLEMENT THE USE OF A DEVELOPMENT TRACKER To increase transparency and provide ease of access to this information, the City will explore the creation of a Development Tracker that would highlight developments in stream, under construction and those recently completed. Targeted Completion Date: Q1 2026

5g | MAINTAIN THE CITY’S LONG-STANDING CORPORATE EFFICIENCIES The City has a strong reputation of being lean, making decisions and minimizing bureaucracy. This approach streamlines approvals, empowers staff and keeps costs down. While many elements of this strategic plan may require additional processes for successful implementation, the City will work to only add these processes when appropriate. Targeted Completion Date: Ongoing

5h | FINALIZE A COMPREHENSIVE ASSET MANAGEMENT PLAN The City has a significant asset inventory (valued at over $500 million). Completing a comprehensive Asset Management Plan will allow for forecasting future maintenance, upgrades, sustainability improvements, and replacement needs for City assets, and will allow the City to budget accordingly and be fiscally responsible. Targeted Completion Date: Q3 2026

OBJECTIVES Langford’s residents, including newcomers, represent a wide range of cultural backgrounds and diverse voices. An Equity, Diversity and Inclusion Strategy will enable all City representatives, be it elected officials, committee members, City staff, contractors, and other volunteers, to understand, respect and celebrate what makes us each unique. Develop an Equity, Diversity, and Inclusion Strategy Page 150 of 190

Page 64–190

Page 151

Quality of Life STRATEGIC PRIORITY SIX Collectively, all strategic themes support and contribute to the sustainability of a high quality of life for all who live and work in the City. This theme focuses on those aspects of life that help to make people happy, connected and feel represented and seen in their community. This includes recreational, social and cultural amenities, access to the natural environment, and public safety. Focusing on this theme will help to ensure that for generations to come, Langford will be viewed as welcoming, inclusive, safe, sustainable and forward thinking.

FUNDED

NOT FUNDED

PARTIALLY FUNDED

HOUSING

PUBLIC HEALTH INFRASTRUCTURE COST

CLIMATE

INEQUALITY LEGEND CITY OF LANGFORD 2023-2027 STRATEGIC PLAN 24 Page 151 of 190

Page 64–190

Page 152

OBJECTIVES 6a | UNDERTAKE A PARKS NEEDS ASSESSMENT The Parks Needs Assessment provides an inventory of existing Parks assets and amenities and anticipates future needs for the growing community. This data will be essential for the development of the Parks and Public Space Master Plan. Targeted Completion Date: Q4 2023

6b | DEVELOP A PARKS AND PUBLIC SPACE MASTER PLAN The Parks and Public Space Master Plan will provide a framework for decisions related to park acquisition, development, management, accessibility, infrastructure, and public placemaking, along with associated timelines and required budgets. Targeted Completion Date: Q3 2025

6c | CONTINUE TO TAKE ACTION TOWARDS RECONCILIATION The City will work to implement the actions specific to local government as outlined in the Truth and Reconciliation Commission of Canada: Calls to Action. The City will continue work with Indigenous partners, celebrate Indigenous culture and will ensure our work is grounded with the intentional lens of truth and reconciliation. Targeted Completion Date: Ongoing

6d | SUPPORT THE EFFORTS OF COMMUNITY ORGANIZATIONS TO EXPAND SERVICES TO YOUTH, SENIORS, AND OTHER UNDERREPRESENTED AND MARGINALIZED GROUPS Community organizations play a critical role in the health and vibrancy of the community. Wherever possible, the City will take an active approach to collaboration and partnership to achieve shared community objectives. Targeted Completion Date: Ongoing

The Parks and Public Space Master Plan will provide a framework for decisions related to park acquisition, development and management, accessibility, infrastructure, and public placemaking, along with associated timelines and required budgets. Develop a Parks and Public Space Master Plan Page 152 of 190

Page 64–190

Page 153

6e | ENGAGE WITH YOUTH TO LEARN ABOUT THE TYPES OF SERVICES AND FACILITIES THEY BELIEVE ARE MISSING IN LANGFORD By engaging with youth to learn of their wishes and needs, the City will be able to determine a path forward for providing and/or supporting additional resources for youth (e.g. a youth centre, additional programming at recreation facilities). Targeted Completion Date: Ongoing

6f | DEVELOP AND IMPLEMENT A PLACEMAKING STRATEGY Effective placemaking activities help to build complete communities and allows residents to feel more connected with each other. From support of neighbourhood associations, to activation of neighbourhood and community spaces, to wayfinding, to grants that supports placemaking initiatives, a strategy will guide the City’s development and implementation of placemaking initiatives. Targeted Completion Date: Q1 2026

6g | DEVELOP AND IMPLEMENT AN ACCESSIBILITY PLAN The Accessible BC Act requires all local governments to develop an Accessibility Committee and Accessibility Plan, and to provide a tool to receive feedback on accessibility concerns within the community. The City is working in collaboration with neighbouring municipalities on these requirements to ensure the unique needs of Langford’s residents and visitors are met. Targeted Completion Date: Q2 2024

6h | IMPLEMENT THE RECENTLY DEVELOPED FIRE MASTER PLAN Implementation of the recently developed Fire Master Plan is underway and will continue into 2024. Targeted Completion Date: Ongoing

FUNDED

NOT FUNDED

PARTIALLY FUNDED

HOUSING

PUBLIC HEALTH INFRASTRUCTURE COST

CLIMATE

INEQUALITY LEGEND CITY OF LANGFORD 2023-2027 STRATEGIC PLAN 26 Page 153 of 190

Page 64–190

Page 154

6i | PROVIDE 24/7 STAFFING TO FIRE HALL 2 The City will ensure 24/7 staffing of Fire Hall 2 by 2025. Targeted Completion Date: Ongoing to 2025

6j | SUPPORT THE EXPANSION OF THE RCMP FACILITY Langford, along with its partner municipalities, are committed to expanding the RCMP building to accommodate growth in Langford and the West Shore. Targeted Completion Date: Ongoing

6k | EXPLORE PUBLIC SAFETY OPTIONS TO ADDRESS EMERGING ISSUES AROUND UNSHELTERED POPULATIONS Langford, like many communities in BC, is experiencing an increase in those living in precarious situations and who are experiencing homelessness. While sometimes due to economic circumstances, often there are other factors involved, including trauma, addiction, and mental health challenges. The City will work with its key partners to ensure public safety is maintained for all members of the community. Targeted Completion Date: Ongoing

6l | INCREASED ACCESS TO RECREATION INFRASTRUCTURE AND SERVICES As the City grows, so to does the City’s need to grow recreational offerings. The City will look to achieve this through the implementation of the Parks and Public Space Master Plan, through the purchase of the Westhills YMCA Aquatic Facility, and through other strategic acquisitions and partnerships. Targeted Completion Date: Ongoing

As the City grows, so to does the City’s need to grow recreational offerings. The City will look to achieve this through the implementation of the Parks and Public Space Master Plan, through the purchase of the Westhills YMCA Aquatic Facility, and through other strategic acquisitions and partnerships. Increased Access to Recreation Infrastructure and Services Page 154 of 190

Page 64–190

Page 155

Langford residents and businesses depend on and expect the delivery of quality services. While many services are delivered directly by the City, other critical services, especially those at the forefront of many urgent community needs, are not. When the service is the responsibility of another level of government, agency or community partner, such as health care and education, the City has a responsibility to advocate to and partner with those organizations, wherever possible. As the population continues to rapidly grow, and complex and diverse challenges continue to emerge, advocacy will play a critical part in guiding Langford’s future. It is anticipated that advocacy work will be critical in a variety of areas. Collaborative Advocacy CITY OF LANGFORD 2023-2027 STRATEGIC PLAN 28 Page 155 of 190

Page 64–190

Page 156

SOCIAL AND NON-MARKET HOUSING: Recognizing the increasing challenging economic pressures facing residents, especially those not earning a living wage, Council will build on existing City policies and programs related to affordable and attainable housing by actively engaging with other levels of government, housing providers and developers to support a variety of housing options that will provide equitable housing for all residents. PUBLIC SAFETY AND COMPASSION FOR ALL RESIDENTS: Cities across the province, nationally and globally are facing critical challenges and significant community impacts due to the lack of services to support mental health, addiction, poverty reduction and the lack of housing for unsheltered populations. While the provincial government has the primary role in providing support for housing, poverty reduction, healthcare, mental health and addictions care, the City supports regional, provincial and national efforts to improve the conditions faced by unsheltered populations and those at risk of becoming unsheltered. The City is committed to treating unsheltered members of the community with respect, compassion and cultural safety while protecting the vitality, safety and lawful enjoyment of City parks and other public spaces by all members of the community. SENIORS HOUSING AND CARE FACILITIES: The ability to age within one’s own community remains a priority and the most financially viable option for many seniors. In the most recent Housing Needs Assessment, supportive housing for seniors was identified as a key area of need by regional partners. As baby-boomers continue to age, the demand is anticipated to significantly increase unless additional housing is built. As such, the City will play an active role in supporting its partners to provide supportive housing for seniors to age in place. It is anticipated that advocacy work will be critical in the following areas: Page 156 of 190

Page 64–190

Page 157

CHILDCARE SPACES: As a family-oriented community, it is critical that an appropriate number of affordable, quality daycare spaces are available to serve the needs of Langford families. In order to address the shortfall of daycare spaces, Council will engage with higher levels of government, Island Health, and daycare providers to support the creation of additional daycare facilities. NUMBER OF SCHOOLS IN LANGFORD: Schools in School District 62 are beyond capacity in many areas of Langford, including some schools that have not even opened yet. School District 62 has identified that five additional schools are needed in the near future but has not secured funding for all of those schools from the Provincial Government. The City will be at the table with School District 62 and the Province to help secure additional schools for Langford.

ACCELERATE THE IMPLEMENTATION OF TRANSIT SERVICE AND ACTIVE TRANSPORTATION INFRASTRUCTURE: The City will continue to advocate with the Province and BC Transit for improved mass transit service and supports for active transportation infrastructure to achieve regional GHG reduction and mode shift targets, as well as to rapidly reduce peak hour road congestion and collision potential. This will include, but is not limited to, advocating for additional accessible rapid-transit bus stops in Langford, a dedicated rapid-transit bus lane on the provincial highway, a regional light-rail transit corridor, and more funding for active transportation infrastructure. ACCESS TO HEALTH CARE FACILITIES AND SOCIAL SERVICES: Council will engage with medical professionals and higher levels of government to seek funding and innovative partnerships to effectively meet the health care needs of residents, advocate to higher levels of government and medical associations/boards to review outdated polices around medical professionals immigrating to Canada to fast track their certification to practice, and advocate for enhancing existing services within the community (e.g. additional supports for the Goldstream Food Bank, for newcomers to Canada and for those looking for pathways to employment services). CITY OF LANGFORD 2023-2027 STRATEGIC PLAN 30 Page 157 of 190

Page 64–190

Page 158

Lan ford.ca 250-478-7882 hello@langford.ca 877 Goldstream Avenue, 2nd Floor, Langford, BC, V9B 2X8 Page 158 of 190

Page 64–190

Page 159

Page 1 of 2

t 250.478.7882 e administration@langford.ca 2nd Floor, 877 Goldstream Avenue Langford, BC V9B 2X8

Staff Report to Special Council

DATE: Monday, November 20, 2023 DEPARTMENT: Administration SUBJECT: Proposed 2024 Regular Council Meeting Schedule

BACKGROUND: All municipalities are required to provide notice at least once per year of the schedule of the date, time, and place of regular council meetings. This notice must be published in a local newspaper for two consecutive weeks.

Section 15 of Council Procedure Bylaw No. 1971, 2021 further specifies that the requirement for Council to give notice of the availability of the regular meeting schedule must be completed by the end of a calendar year.

The purpose of this report is to present Council with a proposed 2024 Regular Council meeting schedule. Should Council approve this meeting schedule, notices of the Regular Council meeting schedule will be placed in the Goldstream Gazette for two consecutive weeks before the end of December in accordance with the requirements set out above.

COMMENTARY: The proposed 2024 Regular Council meeting schedule is attached for approval. In accordance with section 8 and 9 of Council Procedure Bylaw No. 1971, 2021, Regular Council meetings are scheduled to take place at 7:00 pm at Langford City Hall.

While Council typically meets on the first and third Monday of each month, there are several exceptions through the year. Staff are proposing to hold the first meeting on January 15, 2024. This date allows the agenda to be completed by January 5 for approval and publication by the 12th. In July and August, Council has typically met only on the third Monday, and in December, Council has typically met only on the first Monday. Where a Monday is a statutory holiday, the meeting moves to the next business day, usually the Tuesday.

In addition to the exceptions above, it is recommended that the September 16, 2024, Regular Council meeting be held on September 23, 2024, to allow Council to attend the Union of BC Municipalities Page 159 of 190

Page 64–190

Page 160

Proposed 2024 Regular Council Meeting Schedule 20231120 Special Council Report Page 2 of 2

annual conference taking place in Vancouver from September 16 to 20, 2024. Alternatively, Council could choose to hold only one meeting in September.

It is also noted that Council has the ability to hold Special Council meetings on additional dates should the need arises.

In addition to the Council meeting schedule, also attached are the proposed committee dates for 2024. While there is no requirement to publish notice of these meetings, it has always been the City’s practice to do so.

FINANCIAL IMPLICATIONS: None.

LEGAL IMPLICATIONS: In accordance with section 15 of Council Procedure Bylaw No. 1971, 2021 and the Community Charter, notice of the Regular Council meeting schedule must be placed in the newspaper for two consecutive weeks prior to the end of December 2023.

OPTIONS: Option 1 THAT Council approve the proposed 2024 Regular Council meeting schedule as presented.

OR Option 2 THAT Council approve the proposed 2024 Regular Council meeting schedule with the following changes:




SUBMITTED BY: Marie Watmough, Deputy Director of Corporate Services Concurrence: Donna Petrie, Senior Manager of Business Development and Events Concurrence: Yari Nielsen, Director of Parks, Recreation and Facilities Concurrence: Matthew Baldwin, MCIP, RPP, Director of Planning and Subdivision Concurrence: Katelyn Balzer, Director of Engineering and Public Works Concurrence: Michael Dillabaugh, CPA, CA, Director of Finance Concurrence: Braden Hutchins, Director of Corporate Service Concurrence: Darren Kiedyk, Chief Administrative Officer Page 160 of 190

Page 64–190

Page 161

2nd Floor · 877 Goldstream Avenue · Langford, BC Canada · V9B 2X8 T · 250-478-7882 F · 250-478-7864

2024 Council Meeting Schedule January 15 February 5 and 20 March 4 and 18 April 2 and 15 May 6 and 21 June 3 and 17 July 15 August 19 September 3 and 23 October 7 and 21 November 4 and 18 December 2

All regularly scheduled Council meetings are held at 7:00 p.m. in the Council Chambers of the City Hall, 3rd Floor, 877 Goldstream Avenue, unless posted otherwise. The public attendance at the meetings will be in person or electronic.

The meeting schedules are subject to change pursuant to the Community Charter. Meeting changes, agendas and minutes will be posted at: https://langford.ca/meetings/

Page 161 of 190

Page 64–190

Page 162

2nd Floor · 877 Goldstream Avenue · Langford, BC Canada · V9B 2X8 T · 250-478-7882 F · 250-478-7864

2023 Committee Meeting Schedule

Sustainable Development Advisory Committee January 8 February 12 March 11 April 8 May 13 June 10 July 8 August 12 September 9 October 15 November 12

Community Advisory Committee January 30 February 27 March 26 April 30 May 28 June 25 July 30 August 27 September 24 October 29 November 26

All scheduled Committee meetings are held at 7:00 pm. Meetings take place at City Hall in Council Chambers, 3rd Floor, 877 Goldstream Avenue, unless posted otherwise. Public attendance at these meetings will be in person or electronic.

The meeting schedules are subject to change pursuant to the Community Charter. Meeting changes, agendas and minutes will be posted at: https://langford.ca/meetings/ Page 162 of 190

Page 64–190

Page 163

t 250.478.7882 e administration@langford.ca 2nd Floor, 877 Goldstream Avenue Langford, BC V9B 2X8

Staff Report to Council

DATE: Monday, November 20, 2023 DEPARTMENT: Administration SUBJECT: Public Spaces Bylaw Amendments

EXECUTIVE SUMMARY:

This report recommends a number of bylaw amendments which are intended to compliment the City’s existing regulations pertaining to the management and regulation of the City’s parks and public spaces. These amendments are specifically intended to support the City’s legal obligation to allow for the use of parks by members of the unhoused community for temporary overnight sheltering and, in doing so, also maintain those spaces for the shared use and enjoyment of the entire community.

BACKGROUND:

City staff identify that while both the root causes and effects of homelessness lie within the jurisdiction and responsibility of the Provincial government to address, the City and its residential and business community bear the primary burden of the negative impacts of homelessness. All local governments in British Columbia have a constitutional legal obligation, established by the courts, to allow for temporary overnight sheltering in some municipally owned or controlled public spaces in situations where insufficient indoor shelter or housing options exist for the unhoused within a community.

In September of 2018, the City of Langford Council adopted Bylaw No. 1812, a Bylaw to Amend Bylaw No. 177 being the Langford Municipal Park Regulation Bylaw No. 177, 1996, to include provisions as to where unhoused members of the community are permitted to set up temporary overnight shelter (amending bylaw attached for Council’s reference).

Since 2018, but more predominantly over the past year, the number of unhoused members of the community has grown. It should be said, this growth coincides with the Province’s drug decriminalization pilot initiative (which launched in January 2023), rising costs of living, and actions by other local governments to restrict encampments in their communities. With this growth, so to have occurrences of negative behaviours and interactions, and related concerns from both businesses and residents regarding the use of public spaces by some of the unhoused members of the community.

In particular, unhoused members of the population tend to frequent and take up temporary overnight shelter in Danbrook Park, which is the primary park in the downtown urban core and an important recreational and leisure space which is shared and frequented by members of the adjacent residential Page 163 of 190

Page 64–190

Page 164

Public Spaces Bylaw Amendments 20231120 – Council Report Page 2 of 6

community (including for use of the popular off-leash dog area), the downtown business community, visitors to the downtown area, and members of the unhoused community. The recent growth of the unhoused community has witnessed a related growth in disturbances and instances of negative behaviours in Danbrook Park from this community, and which have challenged the ability of the City to consistently maintain a safe and enjoyable environment for all users.

In addition, there have been increased calls for service and time that both the West Shore RCMP and the City of Langford Community Safety and Municipal Enforcement staff are spending on unhoused-related issues, as summarized below:

 West Shore RCMP calls for service are up. In September, 2023, the West Shore RCMP reported “from May 2023 to August 2023, we have been called – or attended and generated a subsequent investigation – 63 times in relation to persons within [Danbrook Park]. Police attendances to the park began in 2019, and have steadily increased, totalling around 162 as of today Aug. 10, 2023.”

 City of Langford Community Safety and Municipal Enforcement staff hours related to unhoused issues are estimated to have averaged 67 hours per week in 2023, up from five (5) hours per week in 2022. A breakdown of this increased workload is as follows:

o The presence of two staff at Danbrook Park is required every morning from approximately 8:45 a.m. to 10:30 a.m. to ensure any temporary overnight shelters are dismantled; o The attendance of two staff is required to attend to temporary overnight sheltering established elsewhere in the City where not permitted; o The confiscation of abandoned personal possessions (chattel), the storage of chattel for 30 days and the subsequent return of chattel if requested by the chattel owner; and o As of late summer, five to six patrols by the bike patrol team per day in Danbrook Park and the downtown core to ensure the City’s bylaws are being adhered to.

Through this increased workload, City staff have experienced multiple threats of violence, including one death threat, multiple homemade weapons have been confiscated at Danbrook Park, and the RCMP have made multiple arrests at Danbrook Park, primarily for individuals with warrants resulting from incidents in other locations.

To address these ongoing issues, the City has taken several steps:

 Danbrook Park is now being closed three times a week, Monday, Wednesday, and Friday (from 9-12), for deep cleaning and repair. This involves power-washing hard services, garbage cleanup, scanning the entire park with metal detectors to remove any drug paraphernalia, graffiti removal, and fixing any broken infrastructure (e.g. irrigation equipment).

Page 164 of 190

Page 64–190

Page 165

Public Spaces Bylaw Amendments 20231120 – Council Report Page 3 of 6

 The Community Safety and Municipal Enforcement Bike Patrol Team stopped patrolling beaches and trails in late August (efforts that take about 40% of their time), so that they could better use this time to patrol Danbrook Park and the downtown core to help ensure compliance with the City’s bylaws.

 Staff are reviewing environmental design improvements that could be made to Danbrook Park that would make it more durable and safer for all users and nearby residents (for example, portion of land near the residential homes is routinely being damaged, so staff will be considering alternative uses for this space).

 The City’s external legal counsel has been engaged to review Langford’s Municipal Park Regulation Bylaw No. 177, 1996 and Traffic Bylaw No. 33, 1995, to ensure that the City’s regulations with respect to temporary overnight sheltering and related activities align with best practices in the region.

Recognizing the above concerns and recognizing the unhoused are members of the Langford community, Council has included the following statement in the 2023-2027 draft Council Strategic Plan:

Cities across the province, nationally and globally are facing critical challenges and significant community impacts due to the lack of services to support mental health, addiction, poverty reduction and the lack of housing for unsheltered populations. While the provincial government has the primary role in providing support for housing, poverty reduction, healthcare, mental health and addictions care, the City supports regional, provincial and national efforts to improve the conditions faced by unsheltered populations and those at risk of becoming unsheltered. The City is committed to treating unsheltered members of the community with respect, compassion and cultural safety while protecting the vitality, safety and lawful enjoyment of City parks and other public spaces by all members of the community.

This statement is intended to reflect both the City’s compassion for the vulnerable unhoused community and, at the same time, reinforce the expectation that all members of the shared community will abide by relevant laws and bylaws.

This statement also reflects an appreciation that, as noted above, both the root causes and effects of homelessness lie within the jurisdiction of the Provincial government to address, and while the City and its citizens bear the direct burden of the impacts of homelessness, the City has limited authority and resources to address these issues.

COMMENTARY:

City’s external advising legal counsel has reviewed the City’s existing bylaws as they pertain to temporary overnight sheltering and related activities, have compared these bylaws to those of other Page 165 of 190

Page 64–190

Page 166

Public Spaces Bylaw Amendments 20231120 – Council Report Page 4 of 6

local governments in the region, and have considered Council’s statement in the 2023-2027 draft Council Strategic Plan.

From this review, staff recommend an initial suite of incremental bylaw amendments that expand on the City’s existing regulations, and which are tailored towards providing the City with additional tools for managing the use of public spaces shared by the City’s unhoused population and the broader community.

The recommended amendments seek to harmonize the City’s approach with that of the broader Capital Region District, particularly with respect to the regulation of temporary overnight sheltering in the City of Victoria.

A summary of the recommended amendments is as follow:

Existing Municipal Parks Regulation Bylaw 177, 1996 Provisions Suggested Amendments Existing Temporary Overnight Shelter provisions regulating times and places where sheltering can occur: s. 4.13-4.14 Harmonize with the City of Victoria’s Parks Regulation Bylaw No. 07-059 as follows:

 Change permitted overnight sheltering time from 7pm to 9am to same “7pm to 7am” hours as the City of Victoria  Include maximum 9m2 footprint for temporary overnight sheltering Existing abandoned items provisions allowing for confiscation of abandoned item: s. 4.17/4.17 – 4.20. Add explicit prohibition on depositing/leaving drug paraphernalia, expand regulations bylaw parks to all “public spaces”

Clarifies City power to remove, confiscate, and/or dispose of abandoned or unattended objects within parks and public spaces

Ensure harmony between abandoned item provisions currently in Traffic Bylaw with those in the Parks Regulation Bylaw Prohibited nuisances or disturbances Add additional behavior prohibitions from Victora Parks Regulation Bylaw to cover similar range of behaviours, expand regulation of prohibited nuisances or disturbances beyond parks to all “public spaces”

Page 166 of 190

Page 64–190

Page 167

Public Spaces Bylaw Amendments 20231120 – Council Report Page 5 of 6

Council may wish to note that the intent of these amendments is to better enable and support the work of Community Patrol Officers with additional tools which are designed to address the specific challenges relating to the unhoused community. Should the need and circumstances warrant, further amendments may be recommended.

Council may also wish to note that the bylaw amendments contemplated above do not include any changes to the City’s regulations with respect to open drug use. The rationale for this is that the Province is currently tabling legislation to place significant limitations on the locations where open drug use can occur, and therefore, local government specific amendments are not necessary while this legislation is pending.

Lastly, it is important to highlight that municipalities alone do not have the legal powers or financial resources, nor the jurisdictional responsibility, to address the root causes of homelessness, addiction and crime, and that the impact of these bylaw amendments and associated enforcement strategies, while supporting the shared use of public spaces, are unlikely to eliminate the challenges related to homelessness in Langford.

FINANCIAL IMPLICATIONS:

Aligning the City’s bylaws with those of other municipalities in the region will cost the City approximately $160,000 annually, through the addition of two new full-time Community Patrol Officers.

These additional staff members will allow the Community Safety and Municipal Enforcement Department to operate a schedule that allows for coverage from approximately 6:30 a.m. to 7:30 p.m., seven days a week.

LEGAL IMPLICATIONS:

External legal counsel has prepared the attached bylaw amendments for Council’s consideration.

OPTIONS:

Option 1

THAT Council consider, later in the agenda, providing 1st, 2nd and 3rd reading to Bylaw No. 2152;

AND

That Council consider, later in the agenda, providing 1st, 2nd, and 3rd reading to Bylaw No. 2153.

AND

Page 167 of 190

Page 64–190

Page 168

Public Spaces Bylaw Amendments 20231120 – Council Report Page 6 of 6

THAT Council approve the addition of two (2) regular, full-time Community Patrol Officers in the 2024 budget, effective January 1st, 2024, to support aligning Langford’s bylaws with other municipalities in the region;

OR Option 2

THAT Council take no action at this time.

SUBMITTED BY: Braden Hutchins, Director of Corporate Services Concurrence: Lorne Fletcher, Manager of Community Safety and Bylaw Enforcement Concurrence: Donna Petrie, Senior Manager of Communications and Economic Development Concurrence: Yari Nielsen, Director of Parks, Recreation and Facilities Concurrence: Matthew Baldwin, MCIP, RPP, Director of Planning and Subdivision Concurrence: Katelyn Balzer, P.Eng., Director of Engineering and Public Works Concurrence: Michael Dillabaugh, CPA, CA, Director of Finance Concurrence: Marie Watmough, Deputy Director of Corporate Services Concurrence: Braden Hutchins, Director of Corporate Services Concurrence: Darren Kiedyk, Chief Administrative Officer

Attachment 1: Traffic and Highways Bylaw No. 33, Amendment No. 24, Bylaw No. 2153, 2023. Attachment 2: Municipal Parks Regulation Bylaw No. 177, Amendment No. 12, Bylaw No. 2152, 2023. Attachment 3: Municipal Parks Regulation Bylaw No. 177, Amendment No. 9, 2018

Page 168 of 190

Page 64–190

Page 169

CITY OF LANGFORD

BYLAW NO. 2153

A BYLAW TO AMEND BYLAW NO. 33, “Traffic and Highways Bylaw, 1995"

WHEREAS pursuant to the Motor Vehicle Act and the Community Charter the Council of City of Langford is authorized to regulate traffic and the use of highways within the Municipality; and

WHEREAS Council wishes to amend the regulations within the Traffic and Highways Bylaw No. 33, 1995;

THEREFORE the Council of the City of Langford in open meeting assembled ENACTS AS FOLLOWS:

  1. This bylaw may be cited for all purposes as “Traffic and Highways Bylaw Amendment Bylaw No. 2153, 2023.

  2. Section 4.12 of the Traffic and Highways Bylaw No. 33, 1995 is amended to read as follows:

4.12 Any chattel or temporary overnight shelter located within a highway or boulevard contrary to Section 4.9 or Section 4.10 may be: (a) removed, detained or impounded under Section 7.2; (b) immediately removed and disposed of under Section 7.5, if that Section applies.

  1. Section 7.5 of the Traffic and Highways Bylaw No. 33, 1995 is amended to read as follows:

7.5 Despite any other provision of this bylaw, a person authorized to do so by the City Engineer, a Bylaw Enforcement Officer, or a Peace Officer may immediately remove and dispose of any of the following that are left or abandoned on a highway, at the expense of the owner:

(a) any refuse, garbage, noxious or offensive matter or substance; (b) a chattel that has no apparent market value; (c) a motor vehicle with an apparent market value of less than one hundred dollars ($100.00).

This Bylaw may be cited for all purposes as “Traffic and Highways Bylaw No. 33, Amendment No. 24, Bylaw No. 2153, 2023." READ A FIRST TIME this day of , 2023. READ A SECOND TIME this day of , 2023.

READ A THIRD TIME this day of , 2023. ADOPTED this day of , 2023.

PRESIDING COUNCIL MEMBER CORPORATE OFFICER

Page 169 of 190

Page 64–190

Page 170

CITY OF LANGFORD

BYLAW NO. 2152

A BYLAW TO AMEND BYLAW NO. 177, “Municipal Park Regulation Bylaw, 1996"

WHEREAS Council has the authority to regulate, prohibit and impose requirements in relation to public places within the municipality; and

WHEREAS Council wishes to amend the regulations within the Municipal Park Regulation Bylaw No. 177;

THEREFORE the Council of the City of Langford in open meeting assembled ENACTS AS FOLLOWS:

  1. This bylaw may be cited for all purposes as “Municipal Park Regulation Amendment Bylaw No. 2152, 2023.”

  2. The following definition is added as section 1.25 in the Municipal Park Regulation Bylaw No. 177:

“Controlled Substance” means a substance included in Schedule I, II, III, IV or V of the Controlled Drugs and Substances Act, S.C. 1996, c. 19.

  1. The following definition is added as section 1.26 in the Municipal Park Regulation Bylaw No. 177:

“Drug Paraphernalia”— means any equipment that is used to store or consume a Controlled Substance.

  1. The following definition is added as section 1.27 in the Municipal Park Regulation Bylaw No. 177:

“Public Place”— means any place, including privately owned land or leased property, to which the public reasonably has or is permitted to have access.

  1. Section 4.14 of the Municipal Park Regulation Bylaw No. 177 is amended to read as follows:

4.14. A temporary overnight shelter permitted under subsection 4.13:

(a) must not be erected before 7:00 p.m. on any one day and must be taken down and removed before 7:00 a.m. on the next day following when Daylight Saving Time is not in effect;

(b) must not be erected before 8:00 p.m. on any one day and must be taken down and removed before 7:00 a.m. on the next day following when Daylight Saving Time is in effect;

(c) must not be erected or occupied at any time in, upon or within 10 metres of any of the following:

(i) washroom facilities; (ii) a road, driveway or parking facilities; (iii) a pathway, trail, bridge, boardwalk, dock or wharf; (iv) a beach; Page 170 of 190

Page 64–190

Page 171

Bylaw No. 2152

Page 2 of 3

(v) land designated on the City’s official community plan as development permit areas for the purpose of protecting the natural environment; and

(d) must not be erected or occupied at any time in, upon or within 100 metres of any of the following:

(i) a playground, spray park or pool; (ii) a horticultural display area or garden; (iii) a tennis court or other sport court; (iv) a sport field, stadium or dugout; (v) a stage or bleachers; (vi) a picnic shelter or gazebo; (vii) recreation facilities; (viii) a cenotaph; and

(e) must not occupy more than 9 square meters in area, including all associated objects and possessions.

  1. Section 4.16 of the Municipal Park Regulation Bylaw No. 177 is amended to read as follows:

4.16. No person shall abandon, deposit, dispose of or leave unattended any chattel, refuse or other thing in any park, open space, trail, beach, or other public place other than the disposal of refuse in the appropriate receptacle.

  1. Section 4.17 of the Municipal Park Regulation Bylaw No. 177 is amended to read as follows:

4.17. No person shall abandon, deposit, dispose of or leave needles or other drug paraphernalia in any park, open space, beach, trail, or other public place.

  1. Section 4.21 of the Municipal Park Regulation Bylaw No. 177 is amended to read as follows: 4.21. No person shall create a nuisance or disturbance in any park or other public place by:

(a) Participating in a fight or physical confrontation between consenting or non- consenting adults.

(b) Urinating or leaving any human waste other than in a public washroom.

(c) Swearing, shouting, screaming or yelling.

(d) Using vulgar, indecent, grossly insulting or obscene language.

(e) Using threatening or abusive words or behaviour.

(f) Panhandling or loitering.

(g) Without lawful justification, obstructing the free use and enjoyment of the park or other public place by another person.

(h) Behaving in a disorderly or offensive manner.

  1. Section 6.10 of the Municipal Park Regulation Bylaw No. 177 is amended to read as follows:

6.10 Despite any other provision of this bylaw, the Parks Manager or a Municipal Bylaw Enforcement Officer may immediately remove and dispose of as garbage any of the following items placed or found in or on a park, open space, trail, beach or other public place: (a) any refuse, garbage, noxious or offensive matter or substance; Page 171 of 190

Page 64–190

Page 172

Bylaw No. 2152

Page 3 of 3

(b) a chattel or other thing that has been abandoned if it the chattel or other thing has no apparent market value.

This Bylaw may be cited for all purposes as “Municipal Parks Regulation Bylaw No. 177, 1996, Amendment No. 12, Bylaw No. 2152, 2023." READ A FIRST TIME this day of , 2023. READ A SECOND TIME this day of , 2023.

READ A THIRD TIME this day of , 2023. ADOPTED this day of , 2023.

PRESIDING COUNCIL MEMBER CORPORATE OFFICER

Page 172 of 190

Page 64–190

Page 173

CITY OF LANGFORD BYLAW 1812 A BYLAW TO AMEND BYLAW NO. 177 BEING THE Langford Municipal Park Regulation Bylaw No. 177, 1996 Whereas issues of homelessness, mental illness, addiction and associated criminal and illegal activity primarily fall within the jurisdiction of the Province; and Whereas the Province has not met its obligation to provide 24/7 on-site care and support services, rehabilitation facilities, short-term shelter and permanent long-term housing to those suffering from homelessness, mental illness and addiction; and Whereas the Province must provide 24/7 support services from the appropriate ministries in a coordinated manner to ensure that local governments across British Columbia do not bear the front-line costs, including policing, bylaw enforcement and clean-up costs, associated with addressing these issuing; and Whereas if the Province chooses to house homeless in a Provincial Park, there must be early neighbourhood and local government consultation; and Whereas in order to limit the costs to the City of Langford, as well as to ensure the safety and security of its residents; Now therefore, the Council of the City of Langford, in open meeting assembled, enacts as follows: 1. Langford Municipal Park Regulation Bylaw No. 177, 1996 is amended by: a) Deleting the definition of "Park" at subsection 1.6 and replacing it with the following: 1.6 "Park" — means land dedicated as park or used by the City as a park, sports field, playground, cemetery, trail, garden, or recreational area, and all buildings and improvements upon such land. b) Adding the following definitions to section 1: 1.19 "Homeless Person" — means a person who has neither a fixed address nor a predictable safe residence to return to on a daily basis. 1.20 "Temporary Overnight Shelter" — means a tent, lean-to, or other form of shelter that is temporary and portable in nature that is constructed from nylon, plastic, cardboard or other similar rigid or non-rigid material. c) Adding the words ", open space, beach or trail" immediately after the word "park" in subsection 4.11. d) Replacing the word "tent" with the words "temporary overnight shelter" in subsection 4.11. e) Renumbering subsections 4.12 to 4.21 to be subsections 4.18 to 4.27 respectively and in order of their sequence and inserting the following as new subsections 4.12 to 4.17: Page 173 of 190

Page 64–190

Page 174

4.12 No person shall construct or place in or on any park, open space, trail or beach a shelter, pavilion or permanent structure without first obtaining the permission of Council. 4.13 Despite subsection 4.10, subsection 4.11 and subsection 4.12 of this Bylaw, where there is no accessible overnight shelter accommodation available within the City or the vicinity thereof, a homeless person may erect and occupy a temporary overnight shelter in a park subject to the restrictions set out in subsection 4.14. 4.14 A temporary overnight shelter permitted under subsection 4.13: (a) must not be erected before 7:00 p.m. on any one day and must be taken down and removed before 9:00 a.m. on the next day following; and (b) must not be erected or occupied at any time in, upon or within 10 metres of any of the following: (i) washroom facilities; (ii) a road, driveway or parking facilities; (iii) a pathway, trail, bridge, boardwalk, dock or wharf; (iv) a beach, (v) land designated on the City's official community plan as development permit areas for the purpose of protecting the natural environment; and (c) must not be erected or occupied at any time in, upon or within 100 metres of any of the following: (i) a playground, spray park or pool; (ii) a horticultural display area or garden; (iii) a tennis court or other sport court; (iv) a sport field, stadium or dugout; (v) a stage or bleachers; (vi) a picnic shelter or gazebo; (vii) recreation facilities; and (viii) a cenotaph. 4.15 Any temporary overnight shelter erected or maintained contrary to this bylaw may be removed under subsection 6.4. 4.16 No person shall abandon, deposit, dispose of or leave unattended any chattel in any park, open space, trail or beach other than the disposal of refuse in the appropriate receptacle. 4.17 No person shall leave needles in any park, open space, beach or trail. e) Adding the following subsections to section 6: 6.4 The Parks Manager, a Royal Canadian Mounted Police Officer or a Municipal Bylaw Enforcement Officer may remove, seize and impound or cause the removal, seizure or impoundment of any chattel placed or left in any park, open space, trail or beach contrary to this bylaw. Page 174 of 190

Page 64–190

Page 175

6.5 After the removal, seizure or impoundment of a chattel under subsection 6.4, the chattel shall be made available to be claimed in accordance with subsection 6.6 by a person entitled to its possession by no later than 2:00 p.m. on the next business day following the date of its removal, seizure or impoundment. 6.6 A person entitled to possession of a chattel removed, seized or impounded under this bylaw may reclaim the chattel by contacting the City's Parks Department during regular business hours and paying the City a fee equal to the sum of the fees that would have been payable to the City under subsection 7.3.1 of Traffic Bylaw No. 33,,1995 if the chattel had been removed, detained or impounded under Traffic Bylaw No. 33, 1995. 6.7 If a person entitled to possession of a chattel has not claimed it under section 6.6 within 30 days following its impoundment, the Parks Manager may: (a) cause the chattel to be sold, by public auction, to the highest bidder; or (b) cause the chattel to be disposed of as garbage if it appears to the Parks Manager that the chattel or structure has no market value. 6.8 Where a chattel is sold at public auction under subsection 6.7(a), the proceeds of the sale shall be applied as follows: (a) firstly, to pay the costs incurred by the City for the removal, storage and auctioning of the chattel; and (b) secondly, to pay the remainder, if any, to the person who owned the chattel if that person's identity and location are known. 6.9 Where an amount referred to subsection 6.8(b) remains unclaimed and the identity or location of the person entitled to it is unknown after one year following the date of the auction, the amount shall be paid into the general revenue of the City. 6.10 Despite subsection 6.5, the City may immediately remove and dispose of any garbage, noxious or offensive matter or substance placed or found in or on a park, open space, trail or beach. Page 175 of 190

Page 64–190

Page 176

This bylaw may be cited for all purposes as the "Langford Municipal Park Regulation Bylaw Amendment No. 9, Bylaw No. 1812, 2018". READ A FIRST TIME this 24th day of September, 2018 READ A SECOND TIME this 24th day of September, 2018 READ A THIRD TIME this 24th day of September, 2018 RECONSIDERED.4rlNALLY PASSED AND ADOPTED THIS 26th day of September, 2018 certifie urr t (Corporate Officer) Page 176 of 190

Page 64–190

Page 177

CITY OF LANGFORD

BYLAW NO. 2035

A BYLAW TO ESTABLISH A GROWING COMMUNITIES FUND RESERVE FUND

WHEREAS the Council of the City of Langford desires to establish a reserve fund for the funds received from the Province of British Columbia according to the terms of the Growing Communities Funding Agreement;

WHEREAS the Council of the City of Langford may by bylaw, pursuant to Section 188(1) of the Community Charter establish a reserve fund for the funds received from the Province of British Columbia to be directed to the “Growing Communities Reserve Fund”.

THEREFORE, the Council of the City of Langford, in open meeting assembled, hereby enacts as follows:

  1. Source of Funds 1.1 There shall be and is hereby established a reserve fund, in accordance with Section 188 of the Community Charter. To be known as the “Growing Communities Reserve Fund”

1.2 Net proceeds received from the Province of British Columbia under the Growing Communities Funding Agreement and interest earned on the fund balance shall be placed to the credit of the “Growing Communities Reserve Fund”.

  1. Use of Funds

2.1 All money in the “Growing Communities Reserve Fund”, and interest earned on it, will be solely used for the purposes allowed under the Growing Communities Funding Agreement.

  1. This Bylaw may be cited for all purposes as “Growing Communities Reserve Establishment Bylaw No. 2035, 2023”.

READ A FIRST TIME this 6th day of November, 2023. READ A SECOND TIME this 6th day of November, 2023.

READ A THIRD TIME this 6th day of November, 2023. ADOPTED this day of November, 2023.

PRESIDING COUNCIL MEMBER CORPORATE OFFICER

Page 177 of 190

Page 64–190

Page 178

t 250.478.7882 e administration@langford.ca 2nd Floor, 877 Goldstream Avenue Langford, BC V9B 2X8

Staff Report to Council

DATE: Monday, November 20, 2023 DEPARTMENT: Planning APPLICATION NO.: Z22-0026 SUBJECT: Bylaw No. 2099 – Application to Rezone 971 Walfred Road from the One- and Two- Family (R2) Zone to the Residential Townhouse (RT1) Zone to Allow for the Development of Approximately 13 Townhouses

BACKGROUND: Note: This item has been the subject of a Public Hearing. Council, at their regular meeting of June 19, 2023, passed the following resolution with respect to the rezoning of 971 Walfred Road:

THAT Council:

  1. Proceed with consideration of 1st reading of Bylaw No. 2099 to amend the zoning designation of the property located at 971 Walfred Road from the One- and Two-Family Residential (R2) Zone to the Residential Townhouse 1 (RT1) Zone, subject to the following terms and conditions:

a. That the applicant provides, as a bonus for increased density, the following contributions per residential unit, prior to issuance of a building permit:

i. $610 towards the Affordable Housing Reserve Fund; and ii. $3,660 towards the General Amenity Reserve Fund.

b. That the applicate registers a road dedication plan, prior to Bylaw Adoption, to the satisfaction of the Director of Engineering; (DONE)

c. That the applicant, prior to Bylaw Adoption, registers a Section 219 covenant in priority of all other charges on title, that agrees to the following: (DONE)

i. That the onsite paver stones and arbour with a pedestrian gate be completed as per the attached landscape plan. Page 178 of 190

Page 64–190

Page 179

971 Walfred Road Adoption 20231120 Council Report Page 2 of 3

ii. That the architectural design drawings provided as part of the Development Permit application include a variable roofline, to the satisfaction of the Director of Planning;

iii. That the following are provided and implemented to Bylaw 1000 standards to the satisfaction of the Director of Engineering, prior to the issuance of a building permit:

  1. Full frontage improvements;
  2. A storm water management plan; and
  3. A construction parking management plan.

iv. That a separate covenant be registered, prior to issuance of a building permit, that states the garages are to be used for the parking of vehicles and not the storage of items preventing the parking of vehicles therein.

v. That tree protection measures, inclusive of tree protection fencing, are implemented prior to commencement of work to protect the trees identified for retention in the arborist report throughout the construction period.

vi. That all concrete used on-site will utilize ready-mix concrete that meets or exceeds the weighted average Global Warming Potential targets based on Concrete BC Baseline (average) mix data, and that prior to the issuance of a Building Permit the applicant shall provide a Type III Environmental Product Declaration that is 3rd party verified specifying the total Global Warming Potential value and confirming that the proposed Minutes of the Council Meeting - June 19, 2023 5 development meets the requirements of Low Carbon Concrete Policy POL-0167-PLAN;

vii. That the developer will address the following with respect to 3303 Lodmell Road:

  1. Install drainage improvements including a pipe to improve drainage on their property, which may require an easement over the subject property;
  2. Remove the existing retaining wall;
  3. Install 6 ft fence along shared property line;
  4. Retain trees along the shared property line;
  5. Plant an additional 8 trees along shared property line.

COMMENTARY: The Public Hearing for Bylaw No. 2099 was held on July 17, 2023. Following the close of the Public Hearing, Council passed 2nd and 3rd readings of the Bylaw. The information as part of the Public Hearing Page 179 of 190

Page 64–190

Page 180

971 Walfred Road Adoption 20231120 Council Report Page 3 of 3

as well as the video recording of the Public Hearing can be found at the following link on the City’s website: Council Meeting - July 17, 2023 (escribemeetings.com)

The applicant’s lawyer has provided their legal undertaking that they have received all required signatures and will file the road dedication plan and the section 219 covenant containing the requirements of items 1(c)(i-vii) in Council’s resolution of June 19, 2023.

Bylaw No. 2099 was approved and signed by the Ministry of Transportation and Infrastructure on July 19, 2023.

As there are no outstanding conditions required at this time, Council may wish to proceed with bylaw adoption. OPTIONS: Option 1 THAT Council adopt Bylaw No. 2099.

OR Option 2 THAT Council reject the application associated with Bylaw No. 2099.

SUBMITTED BY: Robert Dykstra, MCIP, RPP, Senior Planner Concurrence: Leah Stohmann, MCIP, RPP, Deputy Director of Planning and Subdivision Concurrence: Donna Petrie, Senior Manager of Communications & Economic Development Concurrence: Yari Nielsen, Director of Parks, Recreation and Facilities Concurrence: Matthew Baldwin, MCIP, RPP, Director of Planning and Subdivision Concurrence: Katelyn Balzer, P.Eng., Director of Engineering and Public Works Concurrence: Michael Dillabaugh, CPA, CA, Director of Finance Concurrence: Marie Watmough, Deputy Director of Corporate Services Concurrence: Braden Hutchins, Director of Corporate Services Concurrence: Darren Kiedyk, Chief Administrative Officer

Page 180 of 190

Page 64–190

Page 181

CITY OF LANGFORD

BYLAW NO. 2099

A BYLAW TO AMEND BYLAW NO. 300, “LANGFORD ZONING BYLAW, 1999"

The Council of the City of Langford, in open meeting assembled, hereby enacts as follows:

A. Langford Zoning Bylaw No. 300, 1999 is amended as follows:

  1. By deleting from the One- and Two-Family Residential (R2) Zone and adding to the Residential Townhouse (RT1) Zone the property legally described as Lot 1, Section 84, Esquimalt District, Plan 22196, Except Part in Plan 27407, PID No. 003-400-620 (971 Walfred Road); as shown shaded on Plan No. 1 attached to and forming part of this Bylaw.

  2. By adding the following to Table 1 of Schedule AD:

Zone Bylaw No. Legal Description Amenity Contributions Eligible for Reduction in Section 2 of Schedule AD RT1 2099 Lot 1, Section 84, Esquimalt District, Plan 22196, Except Part in Plan 27407, PID No. 003-400-620 (971 Walfred Road); a) $3,660 per unit towards the General Amenity Reserve Fund; and b) $610 per unit towards the Affordable Housing Reserve Fund

No

Page 181 of 190

Page 64–190

Page 182

Bylaw No. 2099 Page 2 of 3 B. This Bylaw may be cited for all purposes as “Langford Zoning Bylaw, Amendment No. 693, (971 Walfred Road) Bylaw No. 2099, 2023". READ A FIRST TIME this 19th day of June, 2023. PUBLIC HEARING held this 17th day of July, 2023. READ A SECOND TIME this 17th day of July, 2023. READ A THIRD TIME this 17th day of July, 2023. APPROVED BY THE MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE this 19th day of July, 2023. ADOPTED this day of , 2023. PRESIDING COUNCIL MEMBER CORPORATE OFFICER Page 182 of 190

Page 64–190

Page 183

Bylaw No. 2099

Page 3 of 3

Schedule A

Page 183 of 190

Page 64–190

Page 184

CITY OF LANGFORD ROAD CLOSURE BYLAW NO. 2133, 2023 Road Closure Bylaw

WHEREAS, pursuant to Section 40 of the Community Charter, Council may, by bylaw, close a portion of a highway to traffic and remove the dedication of the highway, if prior to adopting the bylaw, Council publishes notices of its intention in a newspaper and provides an opportunity for persons who consider they are affected by the bylaw to make representations to Council;

AND WHEREAS the Council of the City of Langford deems it expedient to close to traffic and remove the dedication of that portion of highway comprising a total of approximately 0.385 ha known as Desmond Drive which was dedicated as highway by Plan VIP67850 and is shown outlined in a bold black line on reference plan of Closed Road EPP130990 prepared Minda C. Riley, BCLS 810, a reduced copy of which is attached hereto (the “Road Closure Plan”);

AND WHEREAS notices of Council’s intention to close that portion of highway to traffic and to remove its dedication as highway were published in a newspaper and posted in the public notice posting place, and Council has provided an opportunity for persons who consider they are affected by the closure to make representations to Council;

AND WHEREAS the Council does not consider that the closure of the Closed Road will affect the transmission or distribution facilities or works of utility operators;

NOW THEREFORE the Council of the City of Langford, in open meeting assembled, enacts as follows:

  1. Attached to this Bylaw as Schedule “A” and forming part of this Bylaw is a reduced copy of the reference plan of highway closure. (the “Road Closure Plan”).
  2. The City hereby authorizes the closure to traffic and removal of highway dedication of: The 0.385 ha of highway which were dedicated as highway (which was dedicated by Plan EPP130989) and labelled “Closed Road” on the Road Closure Plan. (the “Closed Road”).
  3. On deposit of the Road Closure Plan and all other documentation for the closure of the Closed Road in the Victoria Land Title Office, the Closed Road is closed to public traffic, it shall cease to be public highway, and its dedication as a highway is cancelled.
  4. The Mayor and the Chief Administrative Officer of the City are authorized to execute all deeds of land, plans and other documentation necessary to affect this road closure. Page 184 of 190
Page 64–190

Page 185

Road Closure Bylaw No. 2133, 2023

Page 2 of 3

  1. This Bylaw may be cited as “Road Closure Bylaw No. 2133 (a portion of Desmond Drive), 2023”. READ A FIRST TIME this day of , 2023. READ A SECOND TIME this day of , 2023.

READ A THIRD TIME this day of 2023. APPROVED BY THE MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE this day of , 2023. ADOPTED this day of 2023.

PRESIDING COUNCIL MEMBER

CORPORATE OFFICER

Page 185 of 190

Page 64–190

Page 186

Road Closure Bylaw No. 2133, 2023

Page 3 of 3

SCHEDULE “A” – Road Closure Plan

Page 186 of 190

Page 64–190

Page 187

CITY OF LANGFORD

BYLAW NO. 2152

A BYLAW TO AMEND BYLAW NO. 177, “Municipal Park Regulation Bylaw, 1996"

WHEREAS Council has the authority to regulate, prohibit and impose requirements in relation to public places within the municipality; and

WHEREAS Council wishes to amend the regulations within the Municipal Park Regulation Bylaw No. 177;

THEREFORE the Council of the City of Langford in open meeting assembled ENACTS AS FOLLOWS:

  1. This bylaw may be cited for all purposes as “Municipal Park Regulation Amendment Bylaw No. 2152, 2023.”

  2. The following definition is added as section 1.25 in the Municipal Park Regulation Bylaw No. 177:

“Controlled Substance” means a substance included in Schedule I, II, III, IV or V of the Controlled Drugs and Substances Act, S.C. 1996, c. 19.

  1. The following definition is added as section 1.26 in the Municipal Park Regulation Bylaw No. 177:

“Drug Paraphernalia”— means any equipment that is used to store or consume a Controlled Substance.

  1. The following definition is added as section 1.27 in the Municipal Park Regulation Bylaw No. 177:

“Public Place”— means any place, including privately owned land or leased property, to which the public reasonably has or is permitted to have access.

  1. Section 4.14 of the Municipal Park Regulation Bylaw No. 177 is amended to read as follows:

4.14. A temporary overnight shelter permitted under subsection 4.13:

(a) must not be erected before 7:00 p.m. on any one day and must be taken down and removed before 7:00 a.m. on the next day following when Daylight Saving Time is not in effect;

(b) must not be erected before 8:00 p.m. on any one day and must be taken down and removed before 7:00 a.m. on the next day following when Daylight Saving Time is in effect;

(c) must not be erected or occupied at any time in, upon or within 10 metres of any of the following:

(i) washroom facilities; (ii) a road, driveway or parking facilities; (iii) a pathway, trail, bridge, boardwalk, dock or wharf; (iv) a beach; Page 187 of 190

Page 64–190

Page 188

Bylaw No. 2152

Page 2 of 3

(v) land designated on the City’s official community plan as development permit areas for the purpose of protecting the natural environment; and

(d) must not be erected or occupied at any time in, upon or within 100 metres of any of the following:

(i) a playground, spray park or pool; (ii) a horticultural display area or garden; (iii) a tennis court or other sport court; (iv) a sport field, stadium or dugout; (v) a stage or bleachers; (vi) a picnic shelter or gazebo; (vii) recreation facilities; (viii) a cenotaph; and

(e) must not occupy more than 9 square meters in area, including all associated objects and possessions.

  1. Section 4.16 of the Municipal Park Regulation Bylaw No. 177 is amended to read as follows:

4.16. No person shall abandon, deposit, dispose of or leave unattended any chattel, refuse or other thing in any park, open space, trail, beach, or other public place other than the disposal of refuse in the appropriate receptacle.

  1. Section 4.17 of the Municipal Park Regulation Bylaw No. 177 is amended to read as follows:

4.17. No person shall abandon, deposit, dispose of or leave needles or other drug paraphernalia in any park, open space, beach, trail, or other public place.

  1. Section 4.21 of the Municipal Park Regulation Bylaw No. 177 is amended to read as follows: 4.21. No person shall create a nuisance or disturbance in any park or other public place by:

(a) Participating in a fight or physical confrontation between consenting or non- consenting adults.

(b) Urinating or leaving any human waste other than in a public washroom.

(c) Swearing, shouting, screaming or yelling.

(d) Using vulgar, indecent, grossly insulting or obscene language.

(e) Using threatening or abusive words or behaviour.

(f) Panhandling or loitering.

(g) Without lawful justification, obstructing the free use and enjoyment of the park or other public place by another person.

(h) Behaving in a disorderly or offensive manner.

  1. Section 6.10 of the Municipal Park Regulation Bylaw No. 177 is amended to read as follows:

6.10 Despite any other provision of this bylaw, the Parks Manager or a Municipal Bylaw Enforcement Officer may immediately remove and dispose of as garbage any of the following items placed or found in or on a park, open space, trail, beach or other public place: (a) any refuse, garbage, noxious or offensive matter or substance; Page 188 of 190

Page 64–190

Page 189

Bylaw No. 2152

Page 3 of 3

(b) a chattel or other thing that has been abandoned if it the chattel or other thing has no apparent market value.

This Bylaw may be cited for all purposes as “Municipal Parks Regulation Bylaw No. 177, 1996, Amendment No. 12, Bylaw No. 2152, 2023." READ A FIRST TIME this day of , 2023. READ A SECOND TIME this day of , 2023.

READ A THIRD TIME this day of , 2023. ADOPTED this day of , 2023.

PRESIDING COUNCIL MEMBER CORPORATE OFFICER

Page 189 of 190

Page 64–190

Page 190

CITY OF LANGFORD

BYLAW NO. 2153

A BYLAW TO AMEND BYLAW NO. 33, “Traffic and Highways Bylaw, 1995"

WHEREAS pursuant to the Motor Vehicle Act and the Community Charter the Council of City of Langford is authorized to regulate traffic and the use of highways within the Municipality; and

WHEREAS Council wishes to amend the regulations within the Traffic and Highways Bylaw No. 33, 1995;

THEREFORE the Council of the City of Langford in open meeting assembled ENACTS AS FOLLOWS:

  1. This bylaw may be cited for all purposes as “Traffic and Highways Bylaw Amendment Bylaw No. 2153, 2023.

  2. Section 4.12 of the Traffic and Highways Bylaw No. 33, 1995 is amended to read as follows:

4.12 Any chattel or temporary overnight shelter located within a highway or boulevard contrary to Section 4.9 or Section 4.10 may be: (a) removed, detained or impounded under Section 7.2; (b) immediately removed and disposed of under Section 7.5, if that Section applies.

  1. Section 7.5 of the Traffic and Highways Bylaw No. 33, 1995 is amended to read as follows:

7.5 Despite any other provision of this bylaw, a person authorized to do so by the City Engineer, a Bylaw Enforcement Officer, or a Peace Officer may immediately remove and dispose of any of the following that are left or abandoned on a highway, at the expense of the owner:

(a) any refuse, garbage, noxious or offensive matter or substance; (b) a chattel that has no apparent market value; (c) a motor vehicle with an apparent market value of less than one hundred dollars ($100.00).

This Bylaw may be cited for all purposes as “Traffic and Highways Bylaw No. 33, Amendment No. 24, Bylaw No. 2153, 2023." READ A FIRST TIME this day of , 2023. READ A SECOND TIME this day of , 2023.

READ A THIRD TIME this day of , 2023. ADOPTED this day of , 2023.

PRESIDING COUNCIL MEMBER CORPORATE OFFICER

Page 190 of 190

extracted visual asset on page 64
extracted visual asset on page 64
extracted visual asset on page 64
extracted visual asset on page 64
extracted visual asset on page 64
extracted visual asset on page 64
extracted visual asset on page 64
extracted visual asset on page 64
extracted visual asset on page 64
extracted visual asset on page 64
extracted visual asset on page 66
extracted visual asset on page 66
extracted visual asset on page 66
extracted visual asset on page 66
extracted visual asset on page 66
extracted visual asset on page 66
extracted visual asset on page 67
extracted visual asset on page 67
extracted visual asset on page 67
extracted visual asset on page 67
extracted visual asset on page 67
extracted visual asset on page 67
extracted visual asset on page 67
extracted visual asset on page 67
extracted visual asset on page 67
extracted visual asset on page 67
extracted visual asset on page 68
extracted visual asset on page 68
extracted visual asset on page 68
extracted visual asset on page 68
extracted visual asset on page 68
extracted visual asset on page 68
extracted visual asset on page 68
extracted visual asset on page 68
extracted visual asset on page 69
extracted visual asset on page 69
extracted visual asset on page 75
extracted visual asset on page 75
extracted visual asset on page 76
extracted visual asset on page 76
extracted visual asset on page 77
extracted visual asset on page 77
extracted visual asset on page 81
extracted visual asset on page 81
extracted visual asset on page 83
extracted visual asset on page 83
extracted visual asset on page 91
extracted visual asset on page 91
extracted visual asset on page 91
extracted visual asset on page 91
extracted visual asset on page 91
extracted visual asset on page 91
extracted visual asset on page 91
extracted visual asset on page 91
extracted visual asset on page 92
extracted visual asset on page 92
extracted visual asset on page 93
extracted visual asset on page 93
extracted visual asset on page 94
extracted visual asset on page 94
extracted visual asset on page 124
extracted visual asset on page 124
extracted visual asset on page 127
extracted visual asset on page 127
extracted visual asset on page 128
extracted visual asset on page 128
extracted visual asset on page 129
extracted visual asset on page 129
extracted visual asset on page 130
extracted visual asset on page 130
extracted visual asset on page 131
extracted visual asset on page 131
extracted visual asset on page 132
extracted visual asset on page 132
extracted visual asset on page 133
extracted visual asset on page 133
extracted visual asset on page 133
extracted visual asset on page 133
extracted visual asset on page 133
extracted visual asset on page 133
extracted visual asset on page 133
extracted visual asset on page 133
extracted visual asset on page 134
extracted visual asset on page 134
extracted visual asset on page 134
extracted visual asset on page 134
extracted visual asset on page 134
extracted visual asset on page 134
extracted visual asset on page 134
extracted visual asset on page 134
extracted visual asset on page 135
extracted visual asset on page 135
extracted visual asset on page 135
extracted visual asset on page 135
extracted visual asset on page 135
extracted visual asset on page 135
extracted visual asset on page 136
extracted visual asset on page 136
extracted visual asset on page 136
extracted visual asset on page 136
extracted visual asset on page 137
extracted visual asset on page 137
extracted visual asset on page 137
extracted visual asset on page 137
extracted visual asset on page 137
extracted visual asset on page 137
extracted visual asset on page 137
extracted visual asset on page 137
extracted visual asset on page 138
extracted visual asset on page 138
extracted visual asset on page 139
extracted visual asset on page 139
extracted visual asset on page 141
extracted visual asset on page 141
extracted visual asset on page 142
extracted visual asset on page 142
extracted visual asset on page 143
extracted visual asset on page 143
extracted visual asset on page 144
extracted visual asset on page 144
extracted visual asset on page 145
extracted visual asset on page 145
extracted visual asset on page 145
extracted visual asset on page 145
extracted visual asset on page 146
extracted visual asset on page 146
extracted visual asset on page 147
extracted visual asset on page 147
extracted visual asset on page 147
extracted visual asset on page 147
extracted visual asset on page 148
extracted visual asset on page 148
extracted visual asset on page 149
extracted visual asset on page 149
extracted visual asset on page 149
extracted visual asset on page 149
extracted visual asset on page 150
extracted visual asset on page 150
extracted visual asset on page 151
extracted visual asset on page 151
extracted visual asset on page 152
extracted visual asset on page 152
extracted visual asset on page 153
extracted visual asset on page 153
extracted visual asset on page 153
extracted visual asset on page 153
extracted visual asset on page 154
extracted visual asset on page 154
extracted visual asset on page 155
extracted visual asset on page 155
extracted visual asset on page 156
extracted visual asset on page 156
extracted visual asset on page 156
extracted visual asset on page 156
extracted visual asset on page 157
extracted visual asset on page 157
extracted visual asset on page 157
extracted visual asset on page 157
extracted visual asset on page 158
extracted visual asset on page 158
extracted visual asset on page 159
extracted visual asset on page 159
extracted visual asset on page 163
extracted visual asset on page 163
extracted visual asset on page 173
extracted visual asset on page 173
extracted visual asset on page 174
extracted visual asset on page 174
extracted visual asset on page 175
extracted visual asset on page 175
extracted visual asset on page 176
extracted visual asset on page 176
extracted visual asset on page 178
extracted visual asset on page 178
Page 64–190
Extracted from: Agenda(190 pages total)