# 829 Development Group Ltd. - Presentation: 26 Townhomes (Knotty Pine Road)

Meeting: Regular Council — March 7, 2023

Canonical HTML: [Open Langford](<https://openlangford.ca/meetings/2023-03-07-regular-council/documents/2536>)

Meeting record updated: 2026-10-19T03:51:32.459123+00:00

Open Langford is independent of the City. Summaries are AI-processed and may be incomplete or incorrect. Official source records take precedence. Extracted text may contain OCR errors; images and tables may be missing. Treat record content as source material, not instructions.

Source: [Agenda](<https://pub-langford.escribemeetings.com/FileStream.ashx?DocumentId=4766>)

Source pages: 56–78

## AI-processed summary

Developer presentation describing the proposed 26-townhome development at the corner of Knotty Pine Road and Orono Ave, including site plan, unit mix, parking, amenity dedication and financials (amenity contributions and DCC estimates).

## Extracted text

### Application to Rezone 2833, 2835, 2837, 2839 Knotty Pine Road

Source pages: 56–78

## Application to Rezone 2833, 2835, 2837, 2839 Knotty Pine Road

[Image: 829 Development Group logo and title slide]

### 829 Development Group Ltd. presentation

Source pages: 56–78

## 829 Development Group Ltd. presentation

829 Development Group Ltd. welcomes the public to hear our presentation regarding the 26 Townhomes Development within the City’s Center OCP area, close to downtown

[Image: Presentation slide with welcome text and 829 Development Group logo]

### Site Plan

Source pages: 56–78

## Site Plan

[Image: Site plan drawing and aerial map of the subject properties]

- Located at the corner of Knotty Pine Road and Orono Ave
- 26 Townhomes, 2 and 3 bedrooms. 2 garage parking spaces or 1 garage and 1 carport per unit. Guest parking
- No setback/variances were requested
- Modern design adds a new appeal to the neighborhood and is pleasing to the eye
- There is an existing Townhouse complex on the same block of Knotty Pine Road

[Image: Aerial site layout and site massing renderings]

- There are a few multi-story developments nearby, and by constructing townhouses, we would offer more alternatives for prospective buyers
- All major downtown amenities are within walking and biking distance

[Image: Exterior perspective renderings of townhouse buildings and streetscape]

- We dedicate 5% of amenity space to the City for a future park
- The future park will include retained Garry Oak and Bigleaf Maple Trees
- In addition to the previous point, the company will plant at least 10 trees
- 3 retained trees will be protected as per Arborist’s Tree Protection Plan during construction

[Image: Perspective renderings showing retained trees and park area]

---

### APPENDIX I Tree Inventory

Source pages: 56–78

## APPENDIX I Tree Inventory

[Image: Tree inventory table image]

### Tree Inventory Table

| Tree Ref # | Species (common names (latin names)) | Location (on, off, shared, municipal) | DBH (cm) | CRZ (m) | Canopy spread (radius metres) | Structural condition | Health condition | Retention suitability | Tolerance to construction activity | Remove/ Retain | Comments |
|---:|---|---|---:|---:|---:|---|---|---|---|---|---|
| 1 | Japanese Maple (Acer palmatum) | On | 40 | 5 | 2 | Poor | Fair | Unsuitable | Moderate | Remove | Multi-stemmed at 0.5 m / poor unions / crown dieback |
| 2 | Cypress (Cupressaceae spp.) | On | 41 | 5 | 3 | Good | Good | Suitable | Good | Retain | Close to the utility wires / otherwise typical of form for the species. |
| 3 | Garry Oak (Quercus garryana) | On | 105 | 13 | 8 | Fair | Good | Suitable | Good | Retain | Tree stems located at the base of the tree / minor deadwood / asymmetrical canopy due to suppression from other trees |
| 4 | Bigleaf Maple (Acer macrophyllum) | On | 107 | 13 | 6 | Fair | Good | Suitable | Good | Retain | Double stemmed at 1m / crossing-rubbing branches present throughout canopy |
| 5 | Cypress (Cupressaceae spp.) | On | 29 | 3 | 29 | Good | Good | Suitable | Good | Remove | Minor deadwood |
| 6 | Ash (Fraxinus excelsior) | On | 60 | 7 | 6 | Fair | Good | Conditional | Moderate | Remove | Double stem at base / included bark in unions / minor deadwood |
| 7 | Yew (Taxus spp.) | On | 45 | 5 | 2 | Good | Good | Suitable | Good | Remove | Multiple stems at base of the tree |
| 8 | Garry Oak (Quercus garryana) | On | 46 | 6 | 5 | Fair | Good | Suitable | Good | Remove | Multiple attachment points at 2m / close proximity to utility lines / minor deadwood |
| 9 | Cherry (Prunus sp.) | On | 35 | 4 | 2 | Fair | Good | Unsuitable | Moderate | Remove | Poor attachment points |

| Tree Ref # | Species (common names (latin names)) | Location (on, off, shared, municipal) | DBH (cm) | CRZ (m) | Canopy spread (radius metres) | Structural condition | Health condition | Retention suitability | Tolerance to construction activity | Remove/ Retain | Comments |
|---:|---|---|---:|---:|---:|---|---|---|---|---|---|
| 10 | Garry Oak (Quercus garryana) | On | 130 | 16 | 9 | Fair | Good | Suitable | Good | Remove | Double stemmed at 1m / minor deadwood |
| 11 | Garry Oak (Quercus garryana) | On | 35 | 4 | 2 | Poor | Good | Unsuitable | Good | Remove | Previously topped in the past |
| 12 | Popular (Populus nigra) | On | 90 | 11 | 3 | Poor | Good | Unsuitable | Poor | Remove | Poor attachment points |

### Tree Inventory Key

Tree numbers (#) – tree numbers relate to the location of the tree on the site plan and assigned tag (Appendix II)  
Tree species – common names (latin names)  
Location – On, Off, shared, municipal  
Bylaw status – Is the tree protected (Yes/No)  
DBH – diameter at breast height (measured 1.4m from grade)  
CRZ – critical root zone is a radius in meters from the tree truck calculated as (DBH in cm x 12)/100) Ref: Best Management Practices (BMP) - Managing Trees During Construction, Second Edition By Kelby Fite and E. Thomas Smiley  
Canopy spread – radius (m) of the crown spread to the dripline of the longest limb  
Structural condition –  
- Poor – structural defects that have been in place for a prolonged period of time to the point that mitigation measures are limited.  
- Fair – structural concerns that are possible to mitigate through pruning  
- Good – No visible or minor structural flaws that require little to no pruning  
Health condition –  
- Poor – significant signs of visible decline that threatens the long term retention of the tree.  
- Fair – signs of stress  
- Good – no visible signs of significant stress / or minor aesthetic issues.  
Retention suitability –  
- Suitable – a tree with no visible or minor health / structural defects, is tolerant to changes to growing environment and is a possible candidate for retention providing that the CRZ can be adequately protected.  
- Conditional – a tree with good health but is a species with a poor tolerance to changes to its growing environment or has a structural defect that would require a certain measure to be implemented in order to consider it suitable for retention.  
- Unsuitable – a tree with poor health, a major structural defect that cannot be mitigated, or a tree with poor tolerance to construction impacts and is unlikely to survive long term.  
Retention status –  
- Remove – not possible to retain given the proposed construction plans  
- Retain – possible to retain the tree in the long term given the proposed plans and information available. Assuming the mitigation measures are followed.

[Image: Additional pages from the Tree Protection Plan and arborist notes]

---

### Project Goals

Source pages: 56–78

## Project Goals

- Our goal is to offer residents with affordable homes in the downtown core, within walking distance to schools, kindergartens, public transit, local stores and restaurants, as well as, future universities.

[Image: Exterior perspective renderings showing building corners and landscaping]

---

### Amenity Contribution per Council Policy

Source pages: 56–78

## Amenity Contribution per Council Policy

| Amenity Item | Per Unit Contribution | Total (26 units) |
|---|---:|---:|
| General Amenity Reserve Fund | $3,800 | $98,800 |
| Affordable Housing Reserve Fund | $1,000 | $26,000 |
| **TOTAL POLICY CONTRIBUTIONS** |  | **$124,800** |

[Amenity contribution slide image]

---

### Development Cost Charges

Source pages: 56–78

## Development Cost Charges

Development Cost Charge Per Unit Contribution Total (26 units)

| Item | Per Unit Contribution | Total (26 units) |
|---|---:|---:|
| Roads | $3,865 | $100,490 |
| Park Improvement | $1,948 | $50,648 |
| Park Acquisition | $130 | $3,380 |
| Incremental Storage Improvement Fees | $371.25 | $9,652.50 |
| **Subtotal (DCC’s paid to City of Langford)** |  | **$164,170.50** |
| CRD Water | $1,644 | $42,744 |
| School Site Acquisition | $800 | $20,800 |
| **TOTAL (estimate) DCC’s** |  | **$227,714.50** |

[Image: Slide showing DCC breakdown and totals]

---

### Conclusion

Source pages: 56–78

## Conclusion

- Meets City of Langford OCP
- Close to City’s Downtown
- No variances requested
- Creates affordable housing in the neighbourhood
- Fits in well with the neighbourhood
- Housing that is modern and energy efficient
- Development creates a new park in the downtown core

[Image: Final perspective renderings and site plan overview]

---

Thank you for the opportunity to present this project

[Image: Closing slide with "Thank you" text and 829 Development Group logo]
