# Written Submission / Correspondence - Brian Belcher (detailed)

Meeting: Regular Council — June 20, 2022

Canonical HTML: [Open Langford](<https://openlangford.ca/meetings/2022-06-20-regular-council/documents/2965>)

Meeting record updated: 2026-10-19T03:51:37.612218+00:00

Open Langford is independent of the City. Summaries are AI-processed and may be incomplete or incorrect. Official source records take precedence. Extracted text may contain OCR errors; images and tables may be missing. Treat record content as source material, not instructions.

Source: [Agenda](<https://pub-langford.escribemeetings.com/FileStream.ashx?DocumentId=2946>)

Source pages: 47–49

## AI-processed summary

Detailed written submission from Brian Belcher outlining objections on ecological grounds, listing habitat loss estimates and requesting postponement of decisions until subdivision and development permit applications are considered together.

## Extracted text

### Written Submission / Correspondence - Brian Belcher (detailed)

Source pages: 47–49

## Written Submission / Correspondence - Brian Belcher (detailed)

From: Brian Belcher  
Sent: June 14, 2022 3:53 PM  
To: Langford Planning General Mailbox  
Subject: Written Submission to Public Hearing on amendment to Bylaw no. 300  
Re: Public Hearing to amend City of Langford Bylaw no. 300

Dear Mayor Young and Langford City Councilors,

I am writing to express my concerns about the proposed amendment of Zoning Bylaw No. 300 and further decisions about the development of the property at 2750 Leigh Road. I have comments in three categories: 1. Use designation and implications; 2. Ecological and environmental considerations; 3. Coherence in decision making.

### 1. Use designation and implications

The proposed amendment is to increase the area designated as Area A, to decrease the area designated as Area B, to increase the maximum allowable floor area of non‐residential uses in Area B, and to adjust parking ratios. If I understand correctly, Area A is only for Light Industrial Use and area B allows both Light Industrial and Residential. In other words, the current boundary does not limit Light industrial use anywhere on the property, but the proposed change reduces the area available for residential use. Indeed, the proposal for increased floor space implies the intention to use Area B for non‐residential purposes. It is not clear why there is even a need for the two zones or why it is desirable to reduce the area potentially available for residential use? Substantial Light Industrial development in Area B would clash with the established residential character along Goldstream Ave. Further, it seems likely to increase the scale and intensity of blasting required to prepare the site for construction, especially as previous Bylaw 1809 allows underground vehicle storage. The subject property has shallow soils over bedrock. Preparing underground vehicle storage would require a long period of intensive rock hammering and blasting. Langford is already an extremely noisy and stressful city due to continuous construction on a massive scale. For the livability of Langford and the health and well‐being of Langford citizens, every effort should be made to reduce rock hammering and blasting during construction and to preserve and enhance the residential character along Goldstream Ave.

I am also concerned about the increasing traffic on Goldstream Ave. The ongoing construction of apartments at the end of Goldstream will significantly increase traffic. The proposed site plan for 2750 Leigh Rd. includes road access via Goldstream Ave. In previous Planning Committee and Council meetings about the property it was indicated that the Goldstream exit would be for emergency use only. That should be confirmed on the record. It should also be noted that the access road is not included in the Phase I development permit.

### 2. Ecological and Environmental Considerations

The subject property is within the Habitat and Biodiversity and Woodland Development Permit Area. Previous zoning amendments have substantially eroded its environmental protection. Notably, the 2014 re‐zoning from R2 and RR4 to MUE instead of to Hillside and Shoreline, exempted the property from the requirement to retain a minimum of 40% open space on greenfield sites. The proposed site plan from Beedie shows an extremely small area of greenspace (much less even than the earlier Pacific Hill plan). According to the environmental impact assessment for the property commissioned by the City of Langford, completely developing the area as planned would result in the loss of:

- 4.40 ha Garry oak / Arbutus (red‐listed) (100% of total).  
- 11.84 ha Douglas‐fir — Dull Oregon‐grape (red‐listed) (100% of total).  
- 8.81 ha woodland/terrestrial herbaceous mosaic (WD/HT) (100% of total).  
- 0.16 ha wetland (17% of total).  
- 0.40 ha riparian (30% of total).

A pond alongside the Trans‑Canada Highway will be retained, but the watershed for that pond, which feeds Langford Lake, as well as other ephemeral ponds and streams, will be thoroughly degraded.

Considering the OCP’s sustainability goals, the rapid and widespread loss of forest and natural vegetation in watersheds in Langford, Langford’s commitment to climate action, and the widely expressed desire by Langford citizens for more and better protection of trees and greenspace in the municipality, the remaining forest on the property should be given priority for conservation. The growing population in the area will need accessible parks and it would take decades to replace mature trees. The current Development Permit (DP15‐0038) is for Phase I, the eastern half of the property, which has been cleared for some time and is heavily infested with Scotch Broom. Phase II will require another development permit. The current amendment, and a pending application (SUB21‐0053) to subdivide the property, offer a wonderful opportunity to increase the protection of the substantial ecological, ecosystem and amenity values on the property. Certainly Langford should be able conserve more than 7% of a 22 ha. area of valuable (including red‐listed) habitat and watershed!

### 3. Coherence in Decision Making

The public and Mayor and Council are being asked to consider this amendment while other important decisions concerning the property are pending. There is a forthcoming application to subdivide the property and an application for a development permit for the so‐called Phase II (the forested west half). The development permit will be approved by City staff, with no opportunity for public input. It would seem sensible to postpone the current decision until all the applications can be considered together, with a clear presentation of the land‐use plan, instead of piece‐meal. It would be wise to postpone Phase II development until Phase I is very well advanced to avoid prematurely clearing the remaining forest only to be replaced by invasive species during an economic downturn.

Yours sincerely,

Brian Belcher  
1231 Goldstream Ave.
