# Staff Report: Bylaw No. 1859 - Application to amend the lakefront lot subdivision regulations of the R2 Zone for the property at 3030 Glennan Rd

Meeting: Regular Council — November 4, 2019

Canonical HTML: [Open Langford](<https://openlangford.ca/meetings/2019-11-04-regular-council/documents/1568>)

Meeting record updated: 2026-10-19T03:54:16.086477+00:00

Open Langford is independent of the City. Summaries are AI-processed and may be incomplete or incorrect. Official source records take precedence. Extracted text may contain OCR errors; images and tables may be missing. Treat record content as source material, not instructions.

Source: [20191104-Agenda-Package](<https://langford.ca/wp-content/uploads/2021/05/20191104-Agenda-Package.pdf>)

Source pages: 47–48

## AI-processed summary

Report recommending adoption of Bylaw No. 1859 to amend R2 zone lakefront lot subdivision rules to include SPEA in minimum lot size calculations and allow creation of 550+ m² lots behind the lakefront lot, subject to engineering verification and amenity contributions.

## Extracted text

### Introduction

Source pages: 47–48

2nd Floor · 877 Goldstream Avenue · Langford, BC Canada · V9B 2X8  
T · 250-478-7882 F · 250-478-7864

### Staff Report: Bylaw No. 1859 - Application to amend the lakefront lot subdivision regulations of the R2 Zone for the property at 3030 Glennan Rd

Source pages: 47–48

## Staff Report: Bylaw No. 1859 - Application to amend the lakefront lot subdivision regulations of the R2 Zone for the property at 3030 Glennan Rd

### Date
November 4, 2019

### Department
Planning

### Application No.
Z19-0015

### Subject
Bylaw No. 1859 - Application to amend the lakefront lot subdivision regulations of the R2 Zone for the property at 3030 Glennan Rd

At their Regular Meeting of 3 September 2019, Council passed the following resolution with respect to the property at 3030 Glennan Rd:

> That Council direct staff to prepare a bylaw to amend the text within the R2 Zone for the subject property at 3030 Glennan Road such that the SPEA may be included in the minimum lot size calculation of lakefront lots and to allow 550+ m2 lot to be created within a lakefront parent parcel, behind the lot that directly adjoins the lake;  
> Subject to the following:  
> (a) That the applicant provides, prior to Public Hearing, a technical memo from an engineer that verifies storm water can be adequately managed on-site for the proposed development, to the satisfaction of the Director of Engineering; and  
> (b) That the applicant provides, as a bonus for increased density, the following contributions prior to subdivision approval:  
> i. $6,000 towards the General Amenity Reserve Fund; and  
> ii. $1,000 towards the Affordable Housing Reserve Fund.  
> CARRIED.

### COMMENTS

Source pages: 47–48

## COMMENTS

Bylaw No. 1859 includes the amenity contributions required by Council’s above-noted resolution and was signed by the Minister of Transportation on October 21, 2019.

As Council’s resolution does not specify any further conditions, it may wish to consider adopting Bylaw 1859 at this time.

### OPTIONS

Source pages: 47–48

## OPTIONS

That Council:

1. Adopt Bylaw No. 1859;

2. Take no action at this time with respect to Bylaw No. 1859;

### Respectfully Submitted

Source pages: 47–48

## Respectfully Submitted

Submitted by:  
Leah Stohmann, MCIP, RPP, Deputy Director of Planning

Concurrence:  
Matthew Baldwin, MCIP, RPP Director of Planning

Concurrence:  
Adriana Proton, Manager of Legislative Services

Concurrence:  
Michelle Mahovlich, P.Eng, P.Geo, Director of Engineering

Concurrence:  
Michael Dillabaugh, CPA, CA, Director of Finance

Concurrence:  
Braden Hutchins, Director of Corporate Services

Concurrence:  
Darren Kiedyk, Chief Administrative Officer

:ls
