This site is in beta — data may be incomplete and features are still being added.

DocumentsAppendixSep 4, 2018Pages 65–67

Remaining Attachments / Meeting Materials (maps, appendices, signatures)

Final pages of the agenda package containing remaining attachments, maps, signatures or closing material for the meeting package.

Key facts

  • Covers last pages of the agenda package (65-67) not individually labelled in extracted text
  • Likely contains supplementary maps/appendices and meeting closing/adjournment information

Remaining Attachments / Meeting Materials (maps, appendices, signatures)

Bylaw No. 1801

(b) delete and replace section 5 (d) with: d. Every Soil permit shall expire on the date that is the number of days specified in the applicable “EXPIRY” column of Schedule A from the start date indicated on the permit, and where the Soil permit has not already expired, the City Engineer may approve extensions beyond the expiry date as follows: i. where a Soil permit is for a total volume less than 6000 m3, up to four (4) consecutive 90-day extensions of the Soil permit may be granted on payment of the appropriate administration fee, specified in the “Permit Fee” column of Schedule A, for each extension; and ii. where a Soil permit is for a total volume greater than or equal to 6000 m3, one (1) 90-day extension may be granted on payment of the appropriate administration fee, specified in the “Permit Fee” column of Schedule A, for each extension. If more than 180 days is required then a new permit must be applied for with both the administration fee and the appropriate volume or flat fee applicable.

  1. The Bylaw is further amended in Schedule A by deleting the table in Schedule A and replacing it with the following table:
CLASS TYPE of PERMIT, based on soil volume Permit Fee Highway Damage Deposit (if required*) EXPIRY
A Greater than 100 m3 but less than 300 m3, for the construction of a Single-Family Dwelling $250 administration fee $500 120 days
B Greater than or equal to 100m3, but less than 500m3 $65 administration fee plus $0.50 per m3 of soil to be removed or deposited $750 90 days
C Greater than or equal to 500m3 but less than 6000m3 $100 administration fee plus $0.50 per m3 of soil to be removed or deposited to a maximum of $3000 $1000 120 days
D Greater than or equal to 6000 m3 $100 administration fee plus a flat fee of $3000 $1000 90 days
E Commercial Soil Enterprise $500 per operation paid at application or renewal of business license n/a 1 year

*A highway damage deposit is not required for a soil permit if a highway damage deposit has already been paid in conjunction with a building permit or subdivision approval application for the property.

PART II: SHORT TITLE

This Bylaw may be cited as “Soil Removal and Deposit Bylaw, Amendment No. 1, Bylaw 1801, 2018”.

READ A FIRST TIME this 20th day of August, 2018.

READ A SECOND TIME this 20th day of August, 2018.

READ A THIRD TIME this 20th day of August, 2018.

ADOPTED this of, 2018.

MAYOR

(Certified Correct)
CORPORATE OFFICER

2

Page 65–67
Extracted from: 20180904-Agenda-Package(67 pages total)