DocumentsStaff ReportJul 30, 2018Pages 68–71
Staff Report (Planning) - Z17-0051 / Bylaw No. 1762 - 2158 Millstream Road (Rezoning to RS4 for 33-lot subdivision)
Report regarding Bylaw No. 1762 to rezone 2158 Millstream Road from R2 to RS4 to allow a 33-lot subdivision, summarizing Council resolution conditions, covenant requirements and recommending adoption.
Key facts
- Address: 2158 Millstream Road (LOT 4, PID: 005-476-020)
- Proposal: Rezone R2 to RS4 to allow a 33-lot subdivision
- Developer contributions (per small lot): $3,960 to General Amenity Reserve Fund and $660 to Affordable Housing Reserve Fund
- Conditions include stormwater memo, construction parking plan, sidewalk extension of 77.4 m, and Section 219 covenant; Council first reading March 19, 2018; Public Hearing May 7, 2018
Staff Report to Council
2nd Floor · 877 Goldstream Avenue · Langford, BC Canada · V9B 2X8
T · 250-478-7882 F · 250-478-7864
Date:
July 30, 2018
Department:
Planning
Application No.:
Z17-0051
Subject:
Bylaw No. 1762 - Application to Rezone 2158 Millstream Road from the R2, One and Two Family, Zone to the RS4, Residential Small Lot, Zone to Allow a 33 lot subdivision
At their Regular Meeting of 19 March 2018, Council passed the following resolution with respect to the property at 2158 Millstream Road:
- Give First Reading of Bylaw 1762, a Bylaw to amend the zoning designation of the property located at 2158 Millstream Road from the R2 (One and Two Family Residential) Zone to the RS4 (Residential Small Lot 4) Zone, subject to the following terms and conditions:
a) That the owner agrees to provide, as a bonus for increased density, the following contributions per lot, prior to issuance of a building permit:
i. $3,960 per small lot single family home towards the General Amenity Reserve Fund less the cost to construct the additional 77.4 m of sidewalk beyond the property frontage;
ii. $660 per small lot single family home towards the Affordable Housing Reserve Fund;
b) That the developer provides, prior to Public Hearing the following:
i. A technical Stormwater Management Memo to the satisfaction of the Director of Engineering; (COMPLETED)
c) That the applicant provides, prior to Bylaw Adoption, a Section 219 covenant, registered in priority of all other charges on title that agrees to the following: (COMPLETED)
i. That the developer agrees to implement the approved storm water management plan and to complete any required improvements and/or upgrades to on site and off site infrastructure necessary to facilitate proper drainage on the subject property at the developer’s expense;
ii. That the developer will construct full frontage improvements, including, but not limited to, boulevard planting, and light standards within the frontages of all internal roads and along the Millstream Road frontage. The installation of sidewalks on one side of internal roads as well as along the frontage of Millstream Road that connects the entrance of Bear Mountain Parkway to Nirwan Place. All frontage improvements shall be in accordance with Bylaw No.1000 and to the satisfaction of the Director of Engineering. These improvements shall be installed prior to subdivision approval or building permit issuance, whichever is first, or be the subject of a development servicing agreement to the satisfaction of the Director of Engineering;
iii. That any necessary above or underground infrastructure or servicing upgrades, extensions or other required servicing requirements are to be fulfilled to the standards of Bylaw No. 1000 and the Director of Engineering, and that costs incurred will be the responsibility of the developer;
iv. That the developer agrees to register a road dedication along Millstream Road as is necessary to accommodate any and all required frontage improvements prior to the issuance of any building permits or subdivision approvals, whichever is first, on the Lands;
v. That developer agrees to register statutory right of way over the utility corridor to serve as a pedestrian path connection to Bear Mountain Parkway, prior to the issuance of any building permits or subdivision approvals, whichever is first, on the Lands;
vi. That the developer agrees to construct a pedestrian path, approximately 4 m wide and 30 m long that is accessible and inclusive to those with mobility issues, to the satisfaction of the Manager of Parks and Recreation, prior to the issuance of any building permits on the Lands;
vii. That the applicant will submit a construction parking management plan, to the satisfaction of the Director of Engineering prior to building permit issuance;
viii. That the developer will endeavor to alert the future property owners of the proximity to Western Speed Way Recreation Park, and the nuisance this location may cause;
ix. To extend the sidewalk from Bear Mountain Parkway to Nirwan Place, an additional 77.4 m of sidewalk that is not within the subject property frontage.
x. That the applicant submit FUS calculations to the satisfaction of the Director of Engineering prior to subdivision approval or building permit issuance, whichever is first.
COMMENTS
The applicant has registered a Sec. 219 covenant against the title of the subject property that agrees to items 1. c) i. – x. in Council’s resolution of March 19th, 2018. As there were no additional conditions placed on the approval of Bylaw No. 1762, Council may wish to give the Bylaw fourth and final reading.
OPTIONS
That Council:
Adopt Bylaw No. 1762;
Take no action at this time with respect to Bylaw No. 1762;
Respectfully Submitted,
Submitted by:
Lauren Morhart, MCIP, RPP Planner
Concurrence:
Matthew Baldwin, MCIP, RPP Director of Planning
Concurrence:
Cory Manton, Manager of Parks and Recreation
Concurrence:
George Henshall, Deputy Director of Engineering
Concurrence:
Leah Stohmann, MCIP, RPP, Deputy Director of Planning
Concurrence:
Michael Dillabaugh, CPA, CA, Director of Finance
Concurrence:
Braden Hutchins, Director of Corporate Services
Concurrence:
Darren Kiedyk, Chief Administrative Officer
:lhm