DocumentsMinutesMay 7, 2018Pages 65–66
Minutes — Council Meeting (March 19, 2018)
Council minutes recording that Council gave First Reading to Bylaw No.1762 (2158 Millstream Rd) and noting conditions and other Transportation & Public Works Committee business.
Key facts
- Council gave First Reading to Bylaw No.1762 (motion carried)
- Conditions included full frontage improvements to Bylaw 1000 standards and stormwater management requirements
- Transportation & Public Works Committee item: Lippincott Bridge Replacement contract awarded (~$148,800) funded from Infrastructure Replacement Fund (recorded on same minutes page)
Minutes — Council Meeting (March 19, 2018)
Parking Directives
Direct the City Planner to permit onsite parking, through the Development Permit for Form and Character, to be at a ratio of 1.0 stall per 1 or 2 bedroom units, with any additional 0.25 for visitor parking.
Direct the City Planner to permit onsite parking and loading facilities, through the Development Permit for Form and Character, to be located in the front or side yards for buildings located immediately next to the Galloping Goose.
CARRIED.
Application to Rezone 2158 Millstream Road from the R2, One and Two Family Residential, Zone to the RS4, Residential Small Lot 4, Zone to Allow for a 32 Lot Subdivision
MOVED BY:
COUNCILLOR BLACKWELL
SECONDED:
COUNCILLOR WADE
That Council:
- Give First Reading of Bylaw 1762, a Bylaw to amend the zoning designation of the property located at 2158 Millstream Road from the R2 (One and Two Family Residential) Zone to the RS4 (Residential Small Lot 4) Zone, subject to the following terms and conditions:
a) That the owner agrees to provide, as a bonus for increased density, the following contributions per lot, prior to issuance of a building permit:
i. $3,960 per small lot single family home towards the General Amenity Reserve Fund less the cost to construct the additional 77.4 m of sidewalk beyond the property frontage;
ii. $660 per small lot single family home towards the Affordable Housing Reserve Fund;
b) That the developer provides, prior to Public Hearing the following:
i. A technical Stormwater Management Memo to the satisfaction of the Director of Engineering;
c) That the applicant provides, prior to Bylaw Adoption, a Section 219 covenant, registered in priority of all other charges on title that agrees to the following:
i. That the developer agrees to implement the approved storm water management plan and to complete any required improvements and/or upgrades to on site and off site infrastructure necessary to facilitate proper drainage on the subject property at the developer’s expense;
ii. That the developer will construct full frontage improvements, including, but not limited to, boulevard planting, and light standards within the frontages of all internal roads and along the Millstream Road frontage. The installation of sidewalks on one side of internal roads as well as along the frontage of Millstream Road that connects the entrance of Bear Mountain Parkway to Nirwan Place. All frontage improvements shall be in accordance with Bylaw No.1000 and to the satisfaction of the Director of Engineering. These improvements shall be installed prior to subdivision approval or building permit issuance, whichever is first, or be the subject of a development servicing agreement to the satisfaction of the Director of Engineering;
iii. That any necessary above or underground infrastructure or servicing upgrades, extensions or other required servicing requirements are to be fulfilled to the standards of Bylaw No. 1000 and the Director of Engineering, and that costs incurred will be the responsibility of the developer;
iv. That the developer agrees to register a road dedication along Millstream Road as is necessary to accommodate any and all required frontage improvements prior to the issuance of any building permits or subdivision approvals, whichever is first, on the Lands;
v. That developer agrees to register statutory right of way over the utility corridor to serve as a pedestrian path connection to Bear Mountain Parkway, prior to the issuance of any building permits or subdivision approvals, whichever is first, on the Lands;
vi. That the developer agrees to construct a pedestrian path, approximately 4 m wide and 30 m long that is accessible and inclusive to those with mobility issues, to the satisfaction of the Manager of Parks and Recreation, prior to the issuance of any building permits on the Lands;
vii. That the applicant will submit a construction parking management plan, to the satisfaction of the Director of Engineering prior to building permit issuance;
viii. That the developer will endeavor to alert the future property owners of the proximity to Western Speed Way Recreation Park, and the nuisance this location may cause;
ix. To extend the sidewalk from Bear Mountain Parkway to Niwan Place, an additional 77.4 m of sidewalk that is not within the subject property frontage.
x. That the applicant submit FUS calculations to the satisfaction of the Director of Engineering prior to subdivision approval or building permit issuance, whichever is first.
CARRIED.
Transportation and Public Works Committee – March 13th, 2018
1. Lippincott Bridge Replacement Contract Award
MOVED BY:
COUNCILLOR WADE
SECONDED:
COUNCILLOR SZPAK
That Council approve the award of the Lippincott Bridge Replacement to Mainroad South Island Contracting to install a Prefabricated Timber Deck for an estimated cost of $148,800 and fund the project from the Infrastructure Replacement Fund.
CARRIED.