This site is in beta — data may be incomplete and features are still being added.

DocumentsMinutesMay 7, 2018Pages 63–64

Minutes — Planning, Zoning and Affordable Housing Committee (March 12, 2018)

PZAH Committee minutes recommending First Reading of Bylaw No.1762 subject to conditions including amenity contributions, stormwater memo, frontage improvements, and Section 219 covenants.

Key facts

  • Recommendation: Rezoning 2158 Millstream Road to RS4, subject to conditions
  • Amenity contributions per lot: $3,960 to General Amenity Reserve; $660 to Affordable Housing Reserve
  • Conditions prior to Public Hearing: technical Stormwater Management Memo; prior to adoption require Section 219 covenant and frontage improvements
  • Requirement: extend sidewalk from Bear Mountain Parkway to Nirwan Place (additional 77.4 m)

Minutes — Planning, Zoning and Affordable Housing Committee (March 12, 2018)

Minutes of the PZAH Committee – March 12, 2018 (excerpts)

vi. That all frontage improvements to Bylaw 1000 standards are provided to the satisfaction of the Director of Engineering and Manager of Parks prior to issuance of a building permit; and

vii. That a detailed storm water management plan be provided prior to issuance of a building permit and implemented, as per Bylaw 1000, all to the satisfaction of the Director of Engineering.

  1. Direct the City Planner to permit onsite parking, through the Development Permit for Form and Character, to be at a ratio of 1.0 stall per 1 or 2 bedroom units, with any additional 0.25 for visitor parking.

  2. Direct the City Planner to permit onsite parking and loading facilities, through the Development Permit for Form and Character, to be located in the front or side yards for buildings located immediately next to the Galloping Goose.

CARRIED.

b) Application to Rezone 2158 Millstream Road from the R2, One and Two Family Residential, Zone to the RS4, Residential Small Lot 4, Zone to Allow for a 32 Lot Subdivision

  • Staff Report (Planning)

MOVED BY: COUNCILLOR WADE
SECONDED: D. HORNER

That the Planning, Zoning and Affordable Housing Committee recommend that Council:

  1. Give First Reading of Bylaw 1762, a Bylaw to amend the zoning designation of the property located at 2158 Millstream Road from the R2 (One and Two Family Residential) Zone to the RS4 (Residential Small Lot 4) Zone, subject to the following terms and conditions:

    a) That the owner agrees to provide, as a bonus for increased density, the following contributions per lot, prior to issuance of a building permit:

    i. $3,960 per small lot single family home towards the General Amenity Reserve Fund less the cost to construct the additional 77.4 m of sidewalk beyond the property frontage;
    ii. $660 per small lot single family home towards the Affordable Housing Reserve Fund;

    b) That the developer provides, prior to Public Hearing the following:

    i. A technical Stormwater Management Memo to the satisfaction of the Director of Engineering;

  2. (continued — conditions prior to Bylaw Adoption)

    c) That the applicant provides, prior to Bylaw Adoption, a Section 219 covenant, registered in priority of all other charges on title that agrees to the following:

    i. That the developer agrees to implement the approved storm water management plan and to complete any required improvements and/or upgrades to on site and off site infrastructure necessary to facilitate proper drainage on the subject property at the developer’s expense;
    ii. That the developer will construct full frontage improvements, including, but not limited to, boulevard planting, and light standards within the frontages of all internal roads and along the Millstream Road frontage. The installation of sidewalks on one side of internal roads as well as along the frontage of Millstream Road that connects the entrance of Bear Mountain Parkway to Nirwan Place. All frontage improvements shall be in accordance with Bylaw No.1000 and to the satisfaction of the Director of Engineering. These improvements shall be installed prior to subdivision approval or building permit issuance, whichever is first, or be the subject of a development servicing agreement to the satisfaction of the Director of Engineering;
    iii. That any necessary above or underground infrastructure or servicing upgrades, extensions or other required servicing requirements are to be fulfilled to the standards of Bylaw No. 1000 and the Director of Engineering, and that costs incurred will be the responsibility of the developer;
    iv. That the developer agrees to register a road dedication along Millstream Road as is necessary to accommodate any and all required frontage improvements prior to the issuance of any building permits or subdivision approvals, whichever is first, on the Lands;
    v. That developer agrees to register statutory right of way over the utility corridor to serve as a pedestrian path connection to Bear Mountain Parkway, prior to the issuance of any building permits or subdivision approvals, whichever is first, on the Lands;
    vi. That the developer agrees to construct a pedestrian path, approximately 4 m wide and 30 m long that is accessible and inclusive to those with mobility issues, to the satisfaction of the Manager of Parks and Recreation, prior to the issuance of any building permits on the Lands;
    vii. That the applicant will submit a construction parking management plan, to the satisfaction of the Director of Engineering prior to building permit issuance;
    viii. That the developer will endeavor to alert the future property owners of the proximity to Western Speed Way Recreation Park, and the nuisance this location may cause;
    ix. To extend the sidewalk from Bear Mountain Parkway to Niwan Place, an additional 77.4 m of sidewalk that is not within the subject property frontage.
    x. That the applicant submit FUS calculations to the satisfaction of the Director of Engineering prior to subdivision approval or building permit issuance, whichever is first.

CARRIED.

Page 63–64
Extracted from: 20180507-Agenda-Package-Redacted(211 pages total)