# Bylaw No. 1669 – Subdivision and Development Servicing Bylaw, Amendment No. 15, 2017 (Omnibus)

Meeting: Regular Council — February 20, 2017

Canonical HTML: [Open Langford](<https://openlangford.ca/meetings/2017-02-20-regular-council/documents/513>)

Meeting record updated: 2026-10-19T04:00:56.862092+00:00

Open Langford is independent of the City. Summaries are AI-processed and may be incomplete or incorrect. Official source records take precedence. Extracted text may contain OCR errors; images and tables may be missing. Treat record content as source material, not instructions.

Source: [20170220-Agenda-Package-council](<https://langford.ca/wp-content/uploads/2021/05/20170220-Agenda-Package-council.pdf>)

Source pages: 74–103

## AI-processed summary

Text and related materials for Subdivision and Development Servicing Bylaw, Amendment No. 15, 2017 (Bylaw No. 1669), presented for adoption/reading as part of the agenda package.

## Extracted text

### Bylaw No. 1669 – Subdivision and Development Servicing Bylaw, Amendment No. 15, 2017 (Omnibus) - Part 1 of 3

Source pages: 74–103

## Bylaw No. 1669 – Subdivision and Development Servicing Bylaw, Amendment No. 15, 2017 (Omnibus)

The Council of the City of Langford, in open meeting assembled, enacts as follows:

A. City of Langford Subdivision and Development Servicing Bylaw No. 1000 is amended as follows:

### 1. In Definitions by amending the following definitions to read:

i)  
“City Engineer” means the company, person or persons appointed from time to time by the Council as City Engineer or Director of Engineering, or any employee authorized to act on their behalf.

ii)  
“Final Approval” means the Approving Officer’s signature on the final plan of subdivision.

iii)  
“Warranty Period” means a period of one year starting from the date of Substantial Performance, unless a greater period is specified in this Bylaw in relation to particular Works or Services, during which the Developer must remedy any defects in materials or workmanship and other deficiencies that become apparent in the Works and Services.

### 2. In Definitions by adding the following definitions:

i)  
“Substantial Performance” means the stage of construction completion when all Works and Services as certified by the Engineer of Record, are capable of completion or correction and are ready for use or being used for the purpose intended.

ii)  
“Acceptance of Substantial Performance” means the Director of Engineering’s acceptance in writing of the Engineer of Record’s issuance of Substantial Performance of the approved Works and Services as defined by the Master Municipal Construction Documents (MMCD) (latest edition).

### 3. By replacing Section 1.1.2.3 in Schedule 1 with the following:
1.1.2.3 One (1) paper copy and a digital PDF drawing of the proposed subdivision

### 4. By replacing Section 1.9.2 in Schedule 1 with the following:
1.9.2 The applicant shall submit one (1) copy of drawings for those Works and Services prepared by a Professional Engineer for approval by the City Engineer.  See Schedule 12 for Drafting Requirements.

### 5. By replacing Section 1.9.3.1 in Schedule 1 with the following:
1.9.3.1 The Professional Engineer’s scope of engagement shall include, but is not limited to, assurance of the completeness of the design, certification and submission of construction drawings, coordination of engineering sub-consultants and Record drawings and certification that the design and construction of all Works and Services substantially meet Bylaw 1000 requirements.

### 6. By replacing Section 1.9.3.2 in Schedule 1 with the following:
1.9.3.2 States the following:  
“I                                        a Professional Engineer qualified and eligible to practice in the Province of British Columbia, hereby certify that the following works                                as set out on the drawings submitted currently with this letter have been designed to good engineering standards and in substantial accordance with the latest edition of Subdivision and Development Servicing Bylaw No. 1000, and the Master Municipal Construction Documents (MMCD – latest edition), adopted by the City of Langford.”  
(Signature)

### 7. By replacing Section 1.9.3.4 in Schedule 1 with the following:
1.9.3.4 sets out construction cost estimates for the Works and Services, certified by the Record Engineer

### 8. By replacing Section 1.10 in Schedule 1 with the following:
1.10 Acceptance of Civil Works and Services by the City

1.10.1 The City will not issue Construction Acceptance of Civil Works and Services that are to be owned and maintained by the City until the Works and Services have been approved and installed, and:

1.10.1.1 The Record Engineer has certified Substantial Performance and concurrently identifies all defects and deficiencies in the Works and Services and any outstanding items; and  
1.10.1.2 An application is made by the Record Engineer to the Director of Engineering to acknowledge Substantial Performance.

1.10.2 Upon being satisfied with the application and certifications of the Record Engineer, the Director of Engineering will issue, in writing, an Acknowledgement of Substantial Performance.

1.10.3 Upon Acknowledgement of Substantial Performance the City will add the Works and Services to the City’s maintenance contract.

1.10.4 The developer shall remedy any defects or deficiencies and complete all uncompleted work identified at time of Acknowledgement of Substantial Performance and shall provide to the City, in addition to the security required by Section 1.14.1, security in the amount of 2 times the amount estimated by the Record Engineer as the cost of remedying defects and deficiencies and completing the Works and Services.  The return of this security is conditional upon correction of defects and deficiencies and completion of the Works and Services. Security may be in the form of cash or a letter of credit.

1.10.5 Any defects or uncompleted work identified at time of Acknowledgement of Substantial Performance shall be completed within 2 months (or other period as agreed with the Director of Engineering), failing which the City may perform the work and recover its cost from the security. Construction Acceptance by the City will not be issued until all deficient matters are addressed to the satisfaction of the Director of Engineering.

1.10.6 Geotechnical certification required by Schedule 3 of this bylaw shall be submitted prior to Acknowledgement of Substantial Performance.

1.10.7 The developer shall provide to the Director of Engineering within 2 months of Acknowledgement of Substantial Performance:

1.10.7.1 One AutoCAD and one PDF copy of the Record drawings.

1.10.7.2 As-constructed inventory sheet, supplied by the City, to be completed and submitted to the City as a signed and sealed document by a Professional Engineer.

1.10.7.3 Acceptance by the appropriate utility of all utilities installed within road rights of way.

1.10.7.4 Electrical declaration from the provincial safety authority.

### 9. In Section 1.11.2.1 of Section 1 by deleting the third bullet that reads:
- Two (2) paper copies of the subdivision plan

### 10. By removing Sections 1.13, 1.13.1 and 1.13.2

### 11. By replacing Section 1.14.1 in Schedule 1 as follows:
1.14.1 During the Warranty Period, the developer shall remedy all defects and deficiencies becoming apparent in the Works and Services, and shall provide upon Acknowledgement of Substantial Performance by way of cash or a letter of credit, security in the amount of 10% of the actual cost of the Works and Services as certified by the Record Engineer, to ensure performance of the Developer’s obligations during the Warranty Period, which shall be returned to the Developer upon Final Acceptance.

### 12. By replacing Section 2.2.3 of Schedule 2 as follows:
2.2.3 Rights of way for storm or sanitary services, where permitted, shall have a width equal to twice the depth of the service, unless certified for trench stability and construction safety by the geotechnical engineer of record or a different width is approved or required by the Director of Engineering.  Rights of way shall be unobstructed and be reasonably accessible for maintenance as approved by the Director of Engineering.

### 13. By replacing Section 3.1.4 of Schedule 3 as follows:
3.1.4 Stacked rock (non-face mortared) walls are not permitted adjacent to collector roads unless part of a comprehensive landscape design and as approved by the Director of Engineering and Parks Manager.

### 14. By replacing Section 3.1.5 of Schedule 3 as follows:
3.1.5 All retaining walls within the existing or future road rights of way must be approved by the Director of Engineering and Parks Manager on a case by case basis with regard to the effect on surrounding uses, maintenance, and visual impact.

### Bylaw No. 1669 – Subdivision and Development Servicing Bylaw, Amendment No. 15, 2017 (Omnibus) - Part 2 of 3

Source pages: 74–103

### 15. By adding in new Section 3.1.10 of Schedule 3 as follows:
3.1.10 Any retaining wall, cut or fill slope greater than 45 degrees from the horizontal and greater than 1.2m in height finished grade to finished grade, must be fenced with 1.2m high black chain link at the top of the wall of slope. Alternative fence types may be approved by the Director of Engineering, with s.219 covenants in place to ensure maintenance over time.

### 16. By deleting Section 3.2.7 of Schedule 3

### 17. By adding Section 3.2.9 to Schedule 3 as follows:
3.2.9 Blasting for the purposes of Development is not allowed on any subdivision or single property after 18 months following the first blast on the site.

### 18. By deleting Section 4.3.1.7 of Schedule 4

### 19. By adding Section 4.3.1.8 to Schedule 4 as follows:
4.3.1.8 A design speed of 30 km/h is permitted for local roads and cul-de-sacs subject to approval by the Director of Engineering. Cautionary speed signs must be posted on all roads with a design speed 30 km/h.

### 20. By replacing Section 4.6.1 of Schedule 4 as follows:
4.6.1 Cut and fill slopes, including ditch slopes, within four metres of the road edge shall be a maximum grade of 6 horizontal to 1 vertical.  These slopes shall be planted with grass or trees and shall be made stable under all conditions up to the predicted 1 in 200-year weather or earth movement events. The Director of Engineering may approve alternate cut and fill slopes on a case by case basis and as certified by the Geotechnical Engineer of Record.

### 21. By replacing Section 4.13.2 of Schedule 4 as follows:
4.13.2 Concrete sidewalks shall be 150mm thick at driveway crossings and where mountable curbs are specified, 100mm thick where non-mountable curbs are specified, and shall be 200mm thick at industrial and large format (greater than 10,000 sq m building area) commercial driveway crossings.

### 22. By replacing Section 4.13.6 of Schedule 4 as follows:
4.13.6 The crossfall of the sidewalk grade shall be no less than 2% and no more than 5% sloped toward the roadway.

### 23. By replacing Section 4.13.8 of Schedule 4 as follows:
4.13.8 Tactile warning strips in accordance with CSA B651-12 must be provided on each side of all driveway drops and on all driveways serving commercial, industrial and multi-family residential developments. Tactile warning strips shall be exposed aggregate for brick sidewalks and shall be a two brick wide stamped pattern if the sidewalk is concrete, adjacent to driveways, drops in grade and crosswalks.

### 24. By replacing Section 4.13.11 of Schedule 4 as follows:
4.13.11 Service boxes shall be located in boulevards where possible.  Where inadequate boulevard exists or there are utility conflicts, services boxes may be located in sidewalk if utility lids are non-slip.  Where grades exceed 4% the Director of Engineering may approve utility lids within the sidewalk on a case by case basis as part of the comprehensive design.  Service boxes may be located within drive ways in accordance with the specifications of the individual utility provider.

### 25. By replacing Section 4.14.5 of Schedule 4 as follows:
4.14.5 All new or replacement signs are to be in accordance with the standards and specifications of the Manual of Uniform Traffic Control Devices

### 26. By replacing Section 4.15.1.3 of Schedule 4 as follows:
4.15.1.3 The maximum driveway width is the greater of:

a) The relevant width indicated in Drawing C15, or  
b) 50% of the lot frontage if the frontage exceeds 12.0m, or  
c) 7.5m for dwellings with suites or on lots whose zoning permits suites, if all off street parking requirements can be met and as approved by Development Permit, to a maximum driveway width of 8.0m at the property line.

### 27. By adding Section 4.16.8 to Schedule 4 as follows:
4.16.8 Local road and access lanes are permitted to a maximum of 45m in length with no turn around when accessed via a local road only and approved by the Fire Chief.

### 28. By replacing Section 4.17.6 of Schedule 4 as follows:
4.17.6 If fire staging areas are required as part of the overall emergency access plan approved by the Fire Chief for the development, they shall be a minimum of 8 metres long (measured in the direction of travel) by a minimum of 6 metres wide and have a maximum grade of 6% in any direction. The staging area must have drive-in access for a fire truck from the adjacent road.

### 29. By replacing Section 4.18.1.11 of Schedule 4 as follows:
4.18.1.11 Davit (‘cobra’) overhead street lighting shall use GE Evolve light-emitting diode (LED) lighting fixtures of the following model numbers:

ERW101C130D-5013-ILR

ERL1006A130D-5013-ILR

This requirement may be waived by the City Engineer should the lighting be installed in an area of existing high-pressure sodium (HPS) lighting.  In areas where HPS lighting is required, designs are to use Philips Lumec Helios Series fixtures.  (Bylaw No. 1618)

### 30. By replacing Section 4.18.6 of Schedule 4 as follows:
4.18.6 Where traffic signals, electrical outlets, irrigation timers, signage or other forms of infrastructure other than a streetlight require electrical power, then a BC Hydro approved metered service is required. In instances where the estimated power consumption is very minor and a separate BC Hydro meter is not economically warranted, the City may approve an alternate solution, for example battery power or sub-meters from adjoining private services.

### 31. By replacing Section 4.18.11 of Schedule 4 as follows:
4.18.11 All streetlights requiring banner arms shall have the banners supplied and installed at the tie of streetlight installation. Banner arms are to be installed as per detail E10 and banner material is to match specifications in B1.

### 32. By deleting Section 4.20.3 of Schedule 4.

### 33. By substituting Drawings BM1, BM2, BM3, BM4, BM5, BM6, BM7, BM8, BM9, BM10, and R6 in Schedule 4 with the Drawings BM1, BM2, BM3, BM4, BM5, BM6, BM7, BM8, BM9, BM10, and R6 in this bylaw.

### 34. In Section 5.1.7 of Schedule 5 by deleting “For subdivisions of areas greater than 1.0 hectares (ha) in size (Large Sites)” and replace with “a stormwater management plan prepared by a Professional Engineer is required which will show:”

### 35. In Section 5.5.1 of Schedule 5 by substituting as follows:
5.5.1 Specifications  
Roughness coefficients  
Concrete 0.013, PVC 0.013  
Minimum diameter  
200 mm  
Minimum velocity  
0.61 m/sec (flowing full or half full)  
Maximum velocity  
6.1 m/sec

Above this maximum velocity, special consideration must be given by the Professional Engineer to incorporate pipe materials and construction methods, including pipe anchorage, scour protection and energy dissipation to the satisfaction of the City Engineer.

The choice of pipe material shall be in accordance with the current edition of MMCD.

### 36. By replacing Section 5.11.2 of Schedule 5 as follows:
5.11.2 Headwalls other than those described in Sections 5.11.1.1 and 5.11.1.2 must be mortared rock or precast concrete.  Sandbag inlet headwalls are permitted for repairs to existing sandbag headwalls only.

### 37. By replacing Section 5.14.1 of Schedule 5 as follows:
5.14.2.1 An applicant for subdivision or building permit may be required to submit a storm water management report by a professional engineer. The report must make reference to Land Development Guidelines for the Protection of Aquatic Habitat and Stream Stewardship: A Guide for Planners and Developers, available from BC Environment, and must indicate how the development conforms to those guidelines. The engineer designing this system may have the proposal assessed with the City of Langford’s watershed computer model.

### Bylaw No. 1669 – Subdivision and Development Servicing Bylaw, Amendment No. 15, 2017 (Omnibus) - Part 3 of 3

Source pages: 74–103

### 38. Delete Section 5.14.2
5.14.2 The following statement by the design engineer for the stormwater management system is required in the report as described above in Section 5.14.1:  
“I confirm that the Storm Water works and services have been designed in accordance with the Subdivision and Development Servicing Bylaw No. 1000 (and as amended from time to time), and to meet normal standards of safety for the public and the occupant of the land and surroundings.  
To the best of my knowledge, no nuisance or increase in flood levels are expected resulting from the project for the design storm events in the bylaw.  Overland flow routes for the major event have been accommodated in the design.”

### 39. By deleting Section 5.14.4 of Schedule 5.

### 40. By deleting Section 5.14.5 of Schedule 5.

### 41. By deleting Sections 8.3, 8.5, 8.6, 8.7, 8.8, 8.10, 8.12, 8.13, 8.14 of Schedule 8.

### 42. By replacing Section 8.15.5 of Schedule 8 with the following:
8.15.5 For residential applications only, If FUS recommended fire flows are not available, or the subject property is outside the Capital Regional City Water Services service area, a reduction to the prescribed fire flows may be permitted providing the property is charged with a s.219 of the Land Title Act covenant that requires all buildings over 300 square feet in floor area to be provided with residential fire sprinklers in accordance with NFPA 13D.

### 43. By deleting Section 9.9 of Schedule 9

### 44. In Schedule 11 - the Supplements to MMCD by:
- Adding in new Drawing B1 Banner Sizes to Schedule 11  
- Substituting for Drawing E8 in Schedule 11, Drawing E8 attached to this bylaw  
- Substituting for Drawing E10 in Schedule 11, Drawing E10 attached to this bylaw  
- Substituting for Drawing G4 in Schedule 11, Drawing G4 attached to this bylaw  
- Adding in new Drawings L2(f) Boulevard Tree Installation at Artificial Turf  
- Adding in new Drawing L2(g) Artificial Turf at Concrete  
- Substituting for Drawing R6 in Schedule 11, Drawing R6 attached to this bylaw  
- Substituting for Drawing SD7 in Schedule 11, Drawing SD7 attached to this bylaw  
- Substituting for Drawing S11 in Schedule 11, Drawing S11 attached to this bylaw

### 45. By adding the following record of amendments to Schedule 11 – Supplements to MMCD table as follows:

*(Record of amendments to be added to Schedule 11 as referenced.)*

### 46. By amending Section 14.1.4 in Schedule 14 to add in new section 14.1.4.6 Artificial Turf, and renumber subsections thereafter

### 47. By replacing Section 14.1.5 of Schedule 14 with the following, and renumbering Section 14.1.6 as 14.1.8:
14.1.5 If there is inadequate space within the road right of way, the Director of Engineering and Parks Manager may require a 2 metre wide statutory right of way on either side of the dedicated road for the purposes of planting and maintaining trees, irrigation and ancillary fittings.  
14.1.6 Street trees should be installed when their survival is most likely, usually after construction on abutting lots has been completed.  The developer is responsible for replacing any tree that dies or does not thrive during the Warranty Period.  
14.1.7 If in the assessment of the Manager of Parks, the density of one tree per 15 metres of frontage cannot be accomplished without compromising sound arboricultural practices, due to the size or other characteristics of the frontage, the developer shall pay cash-in-lieu to the City in the amount of $1100.00 for each required boulevard tree that cannot be accommodated, to be used by the City to provide boulevard trees in other locations.

Drawing changes summary:

| DRAWING NO. | TITLE                                 | SUPPLEMENT                                 |
|-------------|---------------------------------------|--------------------------------------------|
| B1          | Banner Sizes                          | Add this drawing (Bylaw 1669)              |
| E8          | Langford Post Top Luminaire           | Amend this drawing (Bylaw 1669)            |
| E10         | Cobra Street Lighting                 | Amend this drawing (Bylaw 1669)            |
| G4          | Utility Trench                        | Amend this drawing (Bylaw 1669)            |
| L2(f)       | Boulevard Tree Installation at Turf   | Add this drawings (Bylaw 1669)             |
| L2(g)       | Artificial Turf at Concrete           | Add this drawing (Bylaw 1669)              |
| R6          | Urban Collector 4 Lanes – 26.0m ROW   | Amend this drawing (Bylaw 1669)            |
| SD7         | Vertical Seepage Pit Detail           | Amend this drawing (Bylaw 1669)            |
| S11         | Top Inlet Catch Basin                 | Amend this drawing (Bylaw 1699)            |

### 48. By replacing Section 14.2.1.1 of Schedule 14 as follows:
14.2.1.1 Should be a minimum of 5cm caliper, measured 15cm rom ground level or as approved by the Parks Manager.

### 49. By replacing Section 14.2.2 of Schedule 14 as follows:
14.2.2 Shall be planed I accordance with drawings L1, L2a, L2b, L2c, L2e, L2f and L2g. For recommended species approved by the Parks Manager.

### 50. By replacing Section 14.2.6 of Schedule 14 as follows:
14.2.6 Turf Grass Seeding/Sodding and Artificial Turf

### 51. By replacing Section 14.2.6.1 of Schedule 14 as follows:
14.2.6.1 New turf grass whether seeded or sodded shall be inspected by the Parks Manager for acceptance after three mows for seed, and immediately for sod. Please refer to L5.

### 52. By adding new Section 14.2.6.2 of Schedule 14 as follows:
14.2.6.2 All Separated boulevards or centre medians under three (3) metres in width shall require the installation of artificial turf.

### 53. By adding new Section 14.2.6.3 of Schedule 14 as follows:
14.2.6.3 New artificial turf shall be inspected by the Parks Manager for acceptance.

### 54. By replacing Section 14.3 of Schedule 14 as follows:
14.3 Landscape Acceptance

### 55. By replacing Section 14.3.1 of Schedule 14 as follows:
14.3.1 Landscape Acceptance may be issued by the Parks Manager once all the following conditions have been met.

### 56. By replacing Section 14.5 of Schedule 14 as follows:
14.5 Final Landscape Acceptance

### 57. By replacing Section 14.5.1 of Schedule 14 as follows:
14.5.1 Final Landscape Acceptance will be issued by the Parks Manager once a Final Landscape Inspection has occurred at the end of the applicable Warranty Period and there are no outstanding deficiencies to be rectified or repaired.  The Parks Manager may extend the Warranty Period on items that require replacement or repair at the final inspection, and defer Final Landscape Acceptance of those items until the end of the Warranty Period as extended.

B. This Bylaw may be cited as “Subdivision and Development Servicing Bylaw, Amendment No. 15, 2017 (Omnibus), Bylaw No. 1669”.

READ A FIRST TIME this     day of                 ,2017.  
READ A SECOND TIME this         day of            ,2017.  
READ A THIRD TIME this            day of                      ,2017.  
ADOPTED this        day of                 ,2017.

MAYOR

(Certified Correct)

CORPORATE OFFICER