# Staff Report to Council - West Shore Parkway Segment 1 Tender Award

Meeting: Regular Council — May 2, 2016

Canonical HTML: [Open Langford](<https://openlangford.ca/meetings/2016-05-02-regular-council/documents/1286>)

Meeting record updated: 2026-10-19T04:02:49.725817+00:00

Open Langford is independent of the City. Summaries are AI-processed and may be incomplete or incorrect. Official source records take precedence. Extracted text may contain OCR errors; images and tables may be missing. Treat record content as source material, not instructions.

Source: [20160502-Agenda-Package](<https://langford.ca/wp-content/uploads/2021/05/20160502-Agenda-Package.pdf>)

Source pages: 51–53

## AI-processed summary

Report recommending award of the construction contract for West Shore Parkway Segment 1 to the lowest compliant bidder and approval of related electrical installation.

## Extracted text

### Staff Report to Council - West Shore Parkway Segment 1 Tender Award

Source pages: 51–53

## Staff Report to Council - West Shore Parkway Segment 1 Tender Award

### Date:
May 2, 2016

### Department:
Engineering

### Subject:
West Shore Parkway Segment 1 Tender Award

### Background
The purpose of this report is to inform Council of the West Shore Parkway Segment 1 tender results and receive approval to award the contract.

### Commentary
The West Shore Parkway is being designed to connect the Trans-Canada Highway through the currently constructed West Shore Parkway to Highway 14/ Sooke Road; it is divided into nine (9) Segments that are designed and tendered separately from each other. Segment 1 of the West Shore Parkway is the signalized intersection with Highway 14/ Sooke Road, connecting to Segment 2 and the Glenshire Business Park. Although Highway 14/ Sooke Road is owned and maintained by the Provincial Ministry of Transportation and Infrastructure (MoTI), the design and construction of Segment 1 is being administered by City staff; the completed project will then be turned over to the MoTI once the project is complete and the traffic signal is commissioned.

A total of five (5) contractors submitted bids for this project; a summary of the bids is presented below. An analysis of the bids was completed by Tetra Tech WEI Inc. who is recommending that the contract be awarded to Windley Contracting Ltd. for an amount of $1,353,288.00 plus GST.

Not included in this tender is the electrical works which includes the installation and commissioning of the traffic signal and streetlights. A quote was supplied by the MoTI’s electrical contractor, Raylec Power LP, for $222,940.00 plus GST. This amount is comparable to previous signal installation projects and the cost estimate provided by Tetra Tech.

### Tender Results

| Tenderer                    | Total Tender Price    | Notes |
|-----------------------------|-----------------------|-------|
| Windley Contracting Ltd.    | $1,353,288.00         |       |
| Don Mann Excavating         | $1,380,731.76         |       |
| Allterra Construction       | $1,516,977.20         |       |
| Dawson Construction Ltd.    | $1,521,016.00         |       |
| Ralmax Contracting Ltd.     | $1,885,908.90         |       |

### Financial Implications
The West Shore Parkway Segment 1 construction will be funded through the City’s Development Cost Charge Program with an additional 2/3 funding coming from the New Building Canada Infrastructure Grant Fund.

### Legal Implications
None.

### Options
That Council:

1. Award the contract for Segment 1 of the West Shore Parkway to Windley Contracting Ltd for a price of $1,353,288.00 plus GST and fund this from the City’s New Building Canada Infrastructure Grant;

AND

2. Award the electrical installation for Segment 1 of the West Shore Parkway to Raylec Power LP for a price of $222,940.00 plus GST and fund this from the City’s New Building Canada Infrastructure Grant;

OR

3. Not award the contract at this time.

### Respectfully Submitted

Submitted by:  
David Lenton, AScT, Segment 1 Project Manager

Concurrence:  
Victor Chen, AScT, Manager of Engineering Construction

Concurrence:  
Michelle Mahovlich, P.Eng, P.Geo, Director of Engineering

Concurrence:  
Steve Ternent, Director of Finance

Concurrence:  
Jim Bowden, Chief Administrative Officer as per Steve Ternent

:dl

Attachment: Tetra Tech verification document