BylawsBylaw No. 1000Land useAdopted 2009In force, as amended
Subdivision and Development Servicing Bylaw
Subdivision and development in Langford must meet City requirements for arranging, designing and building highways and services, with the aim of supporting orderly development suited to its intended use and in harmony with the environment. The bylaw is organized into schedules covering procedures and fees, general requirements, earthworks, roads, drainage, sewage, water, utilities, irrigation, construction standards, drafting, parks and trails, and boulevard landscaping.
Who it affects: It applies to landowners and applicants proposing subdivision or development in the City of Langford.
Key rules
The parts residents most often run into. The PDF is the official text.
- Applies to all Langford lands, except applications made before the bylaw came into force and completed within 12 months of adoption.
- Subdivision approval or a building permit requires the owner to provide required works and services on the adjacent highway, up to its center line.
- Final subdivision approval requires Construction Acceptance or a Works and Services Agreement with the City.
- A servicing agreement requires security equal to 100% of the estimated works and services cost, certified by a Professional Engineer.
- During the one year warranty period, developers must remedy defects and provide security of 10% of the actual works and services cost.
At council
11 matters about this bylaw
- AdoptedSep 28, 2026 – Oct 5, 2026
Subdivision servicing standards update
The update changes the infrastructure standards developers must meet when subdividing land or building projects, including road cross-sections, stormwater, landscaping and irrigation. It aligns requirements with current city transportation plans and technical standards.
Three readings given Sep 28, 2026; bylaw adopted Oct 5, 2026.
- May 2, 2016 – Mar 3, 2025
Subdivision and servicing fees
This bylaw updates fees connected with subdivision and development servicing. The latest recorded amendment changes the fee schedule, but the provided history does not specify the amounts or individual fees affected.
Three readings given to the latest fee amendment Mar 4, 2025; adoption is not recorded.
- AdoptedMay 6, 2024 – May 9, 2024
Subdivision and servicing standards
The changes add engineering, safety and design requirements for subdivision and servicing work, including retaining walls, slopes and bridges. Developers will need to meet these standards when building infrastructure, helping address safety and technical risks.
Amendment adopted May 9, 2024.
- Oct 23, 2023
2181 Bear Mountain Parkway road turnaround
A subdivision proposal at 2181 Bear Mountain Parkway includes 11 duplex lots and one multifamily lot, served by a roughly 150-metre road ending in a permanent two-point turnaround instead of a cul-de-sac. The requested variance raises questions about emergency access and road design.
Referred for more information and alternative layouts Oct 23, 2023; no later decision provided.
- Jun 21, 2021 – Jul 17, 2023
Subdivision and development servicing bylaw
The bylaw makes omnibus servicing and technical changes to the city’s requirements for subdivisions and development. The provided report does not specify the individual changes.
Listed for adoption Jul 17, 2023; no adoption decision is recorded in the provided history.
- Jun 6, 2022 – Jun 20, 2022
Development servicing fee schedule
The bylaw would amend the fee schedule for subdivision and development servicing. These fees apply to servicing connected with development, but the record does not specify the revised amounts or how costs would change.
Three readings listed June 6, 2022; adoption listed June 20, 2022, but not confirmed in the record.
- AdoptedMay 21, 2019 – Jun 4, 2019
Subdivision and servicing fee schedule
This bylaw amends the fee schedule for subdivision and development servicing. The available record does not specify which fees changed or by how much.
Amendment adopted June 4, 2019.
- Mar 18, 2019
Subdivision servicing bylaw amendments
The matter concerns a package of amendments to the city’s subdivision and development servicing rules. The history does not provide details of the changes, so their effect on residents or development projects is unclear.
First, second and third readings given Mar 18, 2019; adoption not recorded.
- May 1, 2017
Centre Mountain servicing variance
The proposal would let portions of seven Sooke Road properties be subdivided from land planned for Centre Mountain’s business park without frontage improvements or immediate sewer connections. Some properties include existing homes; delaying sewer connections could affect those homes, while the requested flexibility could help subdivision proceed.
Staff directed to prepare notices for a bylaw variance May 1, 2017; the variance is not recorded as finalized.
- AdoptedFeb 6, 2017 – Feb 20, 2017
Development servicing standards update
These omnibus changes update the City’s servicing requirements for subdivision and development, including current standards, drawings and technical references. They affect the infrastructure and plans required when land is subdivided or developed.
Amendment adopted Feb 20, 2017; a six-month effectiveness report was also requested.
- AdoptedMar 21, 2016 – Apr 4, 2016
Street lighting servicing standards
The amendment updates street-lighting requirements and related drawings in the city’s subdivision and development servicing rules. It specifies LED fixtures for overhead street lights, with an exception for high-pressure sodium fixtures.
Amendment adopted Apr 4, 2016.
Full textShowHide
Subdivision and Development Servicing Bylaw No. 1000 Consolidated to 17 March 2025 Table of Contents Bylaw .............................................................................................................................................................. i List of Amendments ..................................................................................................................................... vii Schedule 1 Procedures and Fees ........................................................................................................ 1-1 Table 1-1 Applications and Fees ................................................................................... 1-7 Schedule 2 General requirements ...................................................................................................... 2-1 Schedule 3 Earthworks ....................................................................................................................... 3-1 Schedule 4 Road Design and Construction ......................................................................................... 4-1 Table 4-1 Road Classifications ...................................................................................... 4-2 Table 4-2 Street Name Blade Replacement Requirements Standards ...................... 4-10 Table 4-3 Road and Streetlighting Standards for Bear Mountain .............................. 4-17 Schedule 5 Storm Water Management .............................................................................................. 5-1 Schedule 6 Sewage Collection and Disposal ...................................................................................... 6-1 Table 6-1 Sewage Flow Design Criteria ........................................................................ 6-3 Table 6-2 Population Equivalent Table ........................................................................ 6-3 Table 6-3 Main Pipe Parameters .................................................................................. 6-3 Table 6-4 Sewer Pipe and Fittings ................................................................................ 6-3 Table 6-5 Manhole Distance ........................................................................................ 6-4 Schedule 7 Sewage Lift Stations ......................................................................................................... 7-1 Table 7-1 Control Kiosk Specifications ......................................................................... 7-8 Table 7-2 Wiring Specifications for Control Kiosk ....................................................... 7-9 Table 7-3 Digital Inputs for Control Kiosk .................................................................. 7-10 Table 7-4 Digital Outputs for Control Kiosk ............................................................... 7-11 Table 7-5 Analog Inputs for Control Kiosk .................................................................. 7-11 Table 7-6 Conductor Color Code for Control Wiring .................................................. 7-16 Table 7-7 Control Wiring Labelling Conventions ........................................................ 7-16 Table 7-8 Terminal Block Part List .............................................................................. 7-16 Schedule 8 Water Supply ................................................................................................................... 8-1 Schedule 9 Electricity and Telecommunications ................................................................................ 9-1 Schedule 10 Irrigation Standards ....................................................................................................... 10-1 Table 10-1 Inspection Requirements ........................................................................... 10-6 Schedule 11 Supplements to MMCD .................................................................................................. 11-1 Schedule 12 Drafting Standards ......................................................................................................... 12-1 Schedule 13 Parks and Trails Construction ........................................................................................ 13-1 Table 13-1 Design Criteria and Standards for Trail Width and Surfacing..................... 13-1 Table 13-2 Trail Gradient Standards ............................................................................ 13-2 Table 13-3 Trail Construction Standards ...................................................................... 13-2 Schedule 14 Boulevard Landscape Standards .................................................................................... 14-1 Table 14-1 Tree Replacement ..................................................................................... 14-5 Table 14-2 Artificial Turf Product Specification ........................................................... 14-6 Table 14-3 Soil depth requirements ............................................................................. 14-8 Schedule 15 Schedule 15……………………………………………………………………………………………………………….15-1 Page i CITY OF LANGFORD Subdivision, Development and Servicing Bylaw Number No. 1000 WHEREAS Council may appoint a person to be called an Approving Officer to exercise the jurisdiction conferred on him by the Land Title Act or the regulations or any other Act or regulations; AND WHEREAS the Approving Officer appointed by the City of Langford has established procedures for examining proposed subdivisions which information is available to the public; AND WHEREAS the Council may by bylaw impose subdivision application fees pursuant to Section 931 of the Local Government Act; AND WHEREAS Council may by bylaw regulate and require the provision of works and services in respect of the subdivision or development of land, pursuant to Section 938 of the Local Government Act; NOW THEREFORE the Council of the City of Langford in open meeting assembled enacts as follows: 1.0 TITLE 1.1 This Bylaw may be cited as the “Langford Subdivision and Development Servicing Bylaw No. 1000, 2009”. 2.0 APPLICATION 2.1 The provisions of this Bylaw apply to all lands within the area incorporated as the City of Langford. This Bylaw does not apply to any subdivision or building permit for which application was made prior to the date of coming into force of this Bylaw provided that such application is completed within 12 months of adoption of Bylaw 1000. 2.2 The purpose of this Bylaw is to regulate the subdivision and development of land and the arrangement, design and construction of highways, works and services, in order to: (a) Promote orderly, efficient, economical and aesthetically pleasing development. (b) Ensure that subdivisions and developments are developed in harmony with the environment and are suited to the use for which they are intended. 2.3 This Bylaw should be used in conjunction with the Schedules to this bylaw, Langford Zoning Bylaw, 1999 (No. 300) and the Langford Official Community Plan Bylaw, 2008 (No. 1200). Users of this Bylaw are advised that they should also be knowledgeable of the requirements of other applicable enactments including without limitation the: (a) Land Title Act; (b) Local Government Act; (c) Community Charter (d) Strata Property Act and Bare Land Strata Regulations; (e) Agricultural Land Commission Act; Page ii (f) Real Estate Act; (g) Land Survey Act; (h) Forest Land Reserve Act; (i) Waste Management Act; (j) Highway Act; (k) Builders Lien Act; (l) Water Act. 2.4 As a condition of a) The approval of a subdivision, or b) The issuance of a Building Permit The owner of the land is required to provide works and services in accordance with the standards established in this bylaw, on that portion of a highway immediately adjacent to the site being subdivided or developed, up to the center line of the highway 3.0 SEVERABILITY 3.1 No provision of this Bylaw depends for its validity on any other provision and if any section, subsection, clause, sub-clause or phase of this Bylaw is for any reason held to be invalid by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Bylaw. 4.0 DEFINITIONS In this Bylaw, Deleted. (Bylaw No. 1494) “Acceptance of Substantial Performance” means the Director of Engineering’s acceptance in writing of the Engineer of Record’s issuance of Substantial Performance of the approved Works and Services as defined by the Master Municipal Construction Documents (MMCD) (latest edition). (Bylaw No. 1669) “Applicant” means a person applying for approval of a subdivision or development, whether as the owner or as agent for the owner. “Approved Product List” means the product list established by the City Engineer from time to time for the purposes of this Bylaw. (Bylaw No. 1817) “Approving Officer” means the Approving Officer appointed pursuant to the Land Title Act for the City of Langford. “Blast or Blasting” means the use of explosives for the purpose of moving, displacing or breaking rock or other material; Page iii “Blaster” means the person, firm or corporation engaged by the Owner to conduct Blasting and includes an agent, contractor or employee of the Blaster; “Boundary Adjustment” means an adjustment in existing boundaries between legally defined parcels of land that does not create additional parcels. “Building Code” means the British Columbia Building Code, latest edition. “Cal” or “caliper” means the diameter of the tree trunk measured 15 cm from the ground level or from the top of the root ball in the case of a tree grown in a nursery. (Bylaw No. 1494) “Capital Regional District Water Services (CRDWS)” includes any organization assuming the responsibility for the retail water supply in Langford. “City” means the City of Langford. “City Engineer” means the Director of Engineering. (Bylaw 1926) “City of Langford Supplements” are supplements to the Master Municipal Construction Documents (MMCD), latest edition. “Community Plan” means the Langford “Official Community Plan Bylaw No. 1200, 2008” and as amended. “Completion” - for the purpose of assessing applications, means a Servicing Agreement has been executed or a pre-construction meeting has been held with City representatives. “Construction Acceptance” means the City’s acceptance of the construction of Works and Services provided by a Developer pursuant to this Bylaw, subject to the obligation of the Developer to remedy defects and deficiencies becoming apparent during the Warranty Period. (Bylaw No. 1494) “Contractor” is the person, firm or corporation under contract with the City or developer to provide labour, equipment and materials for the execution of the works. “Core Area” as defined in Zoning Bylaw 300. “Cul-de-sac” means a highway of which one end is designed to be permanently closed to motor vehicles, or which is terminated by a natural feature and which provides a vehicular turning area. “Deep Sewers” means those installed at greater than 3.0 metres below finished grade. “Developer” means the owner or authorized agent engaged in the process of subdividing or developing the subject property. “Development” means any improvement to residential, commercial, industrial, institutional or municipal lands, highways and rights-of-way, including the construction, alteration or repair of a building pursuant to a building permit. Page iv “Diameter at Breast Height (DBH)” is measure at 1.3 m from natural grade on the highest side of tree. For DBH of multi-stem trees that stem out below 1.3 m, each stem shall be considered its own tree requiring assessment and replacement. “Director of Engineering” means the person appointed by the City as the Director of Engineering and Public Works or any employee authorized to act on that person’s behalf. (Bylaw 1926) “Director of Parks” means the person appointed by the City as the Director of Parks, Recreation and Facilities (also known as the Manager of Parks or Parks Manager) or any employee authorized to act on that person’s behalf. (Bylaw 1926) “Engineer or Geoscientist of Record” or “Record Engineer” or “Record Geoscientist” means a Professional Engineer or Geoscientist engaged by a Developer to provide certifications required by this Bylaw, a Statement of Conditions, a Development Permit or a Building Permit. (Bylaw 1513) “Final Acceptance” means the City’s acceptance of Works and Services provided pursuant to this Bylaw at the end of the warranty period with all defects and deficiencies remedied to the satisfaction of the City Engineer. (Bylaw No. 1494) “Final Approval” means the Approving Officer’s signature on the final plan of subdivision. (Bylaw No. 1669) “Highway” includes a street, road, lane, bridge, viaduct and any other way open to the use of the public, but does not include a right-of-way on private property, other than an access route in a bare land strata plan that, in the opinion of the City Engineer must be designed to City standards in the interest of public safety and emergency access. “Landscape Retaining Wall” means a retaining wall that is not a Structural Retaining Wall. (Bylaw 1513 “Lane” means a Highway which provides a secondary means of vehicle access to one or more Parcels of land. (Bylaw 1513) “Maintenance Period” means a period of one year starting from the date of Constructional Acceptance – Landscaping (CA-L), unless a greater period is specified in this Bylaw in relation to deficiencies and replacement. During this period, the Developer must maintain all offsite horticultural (i.e. trees, shrubs, sod etc.) and non-horticultural (i.e. irrigation, pavers, benches etc.) elements as approved in design drawings. “Medical Health Officer” means the Medical Health Officer for the Vancouver Island Health Authority. “Municipal Sewer System” means the network of pipes and infrastructure placed so as to receive and direct sewage from two or more parcels of land to a treatment facility, which is owned and operated, by municipal government or City. Page v “Parcel” means any lot, block or other area in which real property is held or into which real property is subdivided, but does not include a highway or portion thereof and includes the remainder of a parcel. “Potable Water” means water, which is approved for drinking purposes by the Medical Health Officer pursuant to the Health Act. “Professional Engineer” or “Consulting Engineer” means a person who is registered or licensed and in good standing in the Province of British Columbia as such under the provisions of the Engineers and Geoscientists Act. “Professional Geoscientist” means a person who is registered or licensed as such and is in good standing under the provisions of the Engineers and Geoscientists Act. (Bylaw 1513) “Right-of-Way” means land or any interest in land acquired for the purpose of: (a) public rights of passage with or without vehicles; or (b) erecting and maintaining any pole-line; or (c) laying, placing and maintaining drains, ditches, pipes, transmission lines or wires for the conveyance, transmission or transportation of water, electric power, forest products, oil or gas or both oil and gas or solids as defined in the Pipeline Act; or (d) the transmission or disposal of sanitary sewage, storm water or drainage; (e) the operation and maintenance of any other undertaking of the City; and shall include a statutory right-of-way as defined in the Land Title Act. “Road” means the portion of a highway constructed for vehicular traffic. “Statement of Conditions” means the letter issued by the Approving Officer for the City to a land owner or agent that outlines the legal, servicing and procedural conditions that must be met prior to obtaining subdivision approval. “Structural Retaining Wall” means a wall that is structurally independent from a building or structure but is required to support the building or structure, or a wall that supports a road. (Bylaw 1513) “Subdivision” means the division of land into two or more parcels, whether by plan, descriptive words or otherwise, and includes boundary adjustments. “Subdivision Approval” means approval of the subdivision of land granted by the Approving Officer when all relevant requirements of this bylaw, the Land Title Act and any other relevant bylaws and legislation have been fulfilled. “Substantial Performance” means the stage of construction completion when all Works and Services as certified by the Engineer of Record, are capable of completion or correction and are ready for use or being used for the purpose intended. (Bylaw No. 1669) Deleted. (Bylaw No. 1494) Page vi “Walkway” means an area of land improved primarily for the use of pedestrian traffic. "Warranty Period" means a period of one year starting from the date of Substantial Performance, unless a greater period is specified in this Bylaw in relation to particular Works or Services, during which the Developer must remedy any defects in materials or workmanship and other deficiencies that become apparent in the Works and Services. (Bylaw No. 1669) “Works and Services” means construction such as roadways, lanes, gas, drainage, water and sewer systems, earthworks and slope stabilization, sidewalks, walkways, boulevards, landscaping, street lighting and underground wiring, and includes works and services whether on highways, rights of way or common property, to be provided for in a subdivision or development of land under this bylaw. “Works and Services Agreement” means an agreement between the City and the owner in accordance with s. 940 of the Local Government Act that works and services will be completed to service a subdivision or development by a date specified in the agreement and that sufficient security has been provided to the City to secure the construction of those works, “Zone” means a zone established by the “Langford Zoning Bylaw, 1999 (No. 300)” and as amended from time to time. REPEAL “City of Langford Subdivision Servicing Bylaw No. 500 and all amendments thereto are hereby repealed. READ a first time this 1st day of February, 2010. READ a second time this 1st day of February, 2010. READ a third time this 1st day of February, 2010. ADOPTED this 15th day of February, 2010. ___________________ _____________________ MAYOR ADMINISTRATOR Page vii City of Langford Subdivision and Development Servicing Bylaw No. 1000 List of Amendments to Bylaw No. 1000 Amendment Bylaw Number Date Adopted 1 s.944 Delegation Bylaw – Delegate the Power of Exemption of Minimum Frontage Requirements to the Approving Officer 1321 21 Feb 2011 2 Minor adjustments to improve the usability of the bylaw 1292 7 Mar 2011 3 Redefine the definition of Development 1352 19 Sep 2011 4 Replacing Section 6.1.1 and adding a map as Appendix A as Figure 6.1 within Section 6.1 1361 3 Oct 2011 5 To amend the definition of “Development” and replacing Section 6.1. 1376 19 Nov 2012 6 To delegate the power of exemption of minimum frontage requirements to the Approving Officer 1459 18 Feb 2013 7 Housekeeping issues, sanitary servicing clarification and addition of Schedule 14 for landscaping 1494 20 Jan 2014 8 Add definitions to Section 4.0, Replace Section1.1.2.3, Replace Section 2.1.1, Replace Section 3.1.3, Replace Section 3.1.5, Remove drawings R13 to R16 from Schedule 4 and add Drawing R18 and R19, Replace Table 4.1, Add a new paragraph to the end of Section 5.1.1, Remove Figure 6.1, Replace the phrase “Strata Title conversion of an existing two-family dwelling” to “a strata subdivision of a two family dwelling, Replace text below Section 6.1.2.1 ii, Delete Section 9, Replace Section 9.3, Delete Section 9.6 and Replace Section 9.7. 1513 28 May 2014 10 Replacing Table 1-1 “Applications and Fees” 1539 20 Oct 2014 11 Amending Section 1.12.1 and replacing Sections 6.4.5 and 9.3 1555 7 Apr 2015 12 Replacing Sections 4.11.4, 4.15.1.3, 4.15.1.5, and Drawing C15 1574 15 Jun 2015 13 Replacing Sections 4.18.1, 4.18.1.5, 4.18.3, 4.18.13.1.5, adding Section 4.18.1.11, amending Schedule 11, and replacing Drawings E3, E4, and E7 in Section 11 1618 4 Apr 2016 14 Replacing Table 1-1 “Applications and Fees” in Schedule 1 Procedures and Fees 1635 16 May 2016 15 Omnibus Amendment. 1669 20 Feb 2017 16 Replacing Table 1-1 “Applications and Fees” in Schedule 1 Procedures and Fees. 1707 8 June 2017 17 Replacing the phrase "six month" in Section 1.5.1 with "twelve month, Replacing the phrase "six month" in Section 1.5.1.3 with "twelve month, adding section 1.5.1.4, inserting section 1.8 Air Space Parcel Subdivision and renumbering subsequent sections accordingly and Replacing Table 1-1 “Applications and Fees” in Schedule 1 Procedures and Fees. 1783 16 July 2018 18 Omnibus Amendment. 1817 1 Apr 2019 19 Replacing Table 1-1 “Applications and Fees” 1849 4 June 2019 20 Replacing Table 1-1 “Applications and Fees” 1901 29 June 2020 21 Withdrawn 1947 N/A 22 Replacing Table 1-1 “Applications and Fees” 1967 19 July 2021 23 Replacing Table 1-1 “Applications and Fees” 2046 20 June 2022 24 Housekeeping Amendments 2103 17 July 2023 25 Housekeeping Amendments and Amendments to Schedules 3 & 4 1926 9 May 2024 Page vii 27 Replacing Table 1-1 “Applications and Fees” 2120 17 Mar 2025 /Th PRESIDING COUNCIL MEMBER CORPORA FFICER CITY OF LANGFORD BYLAW NO. 2120 A BYLAW TO AMEND THE SUBDIVISION AND DEVELOPMENT SERVICING BYLAW The Council of the City of Langford, in open meeting assembled, enacts as follows: A. City of Langford Subdivision and Development Servicing Bylaw No. 1000 is amended as follows: 1. By replacing Table 1 — 1 "Applications and Fees" in Schedule 1 Procedures and Fees with the table attached. B. That the fees automatically be adjusted effective May 1 of each year by the annual percentage change in the All Items Consumer Price Index (CPI) for Greater Victoria for the then most recently ended calendar year as published by Statistics Canada or successor in function. C. This Bylaw may be cited as "Subdivision and Development Servicing Bylaw, Amendment No. 24, (Fee Schedule), Bylaw No. 2120, 2025". [Should have been Amendment No. 27, 2025 (Fee schedule)] READ A FIRST TIME this 3" day of March, 2025. READ A SECOND TIME this 3rd day of March, 2025. READ A THIRD TIME this 3rd day of March, 2025. ADOPTED this 17th day of March, 2025. SCOTT GOODMANSON MAYOR Molise Miles Deputy Corporate Officer PROCEDURES AND FEES Schedule 1 - 1 SCHEDULE 1 PROCEDURES AND FEES 1.1. Application for the Approving Officers Statement of Conditions for the Approval of a Subdivision. 1.1.1. Any property owner or other person wishing to subdivide land must obtain a statement from the Approving Officer of the complete conditions which must be fulfilled in order to obtain approval of a subdivision and shall pay an application fee plus an additional fee for each parcel proposed to be created in addition to the number of existing parcels. 1.1.2. The application shall be accompanied by: 1.1.2.1. DELETED (Bylaw No. 1292); 1.1.2.2. Copies of all rights of way, easement and covenant documents pertaining to the subject property; 1.1.2.3. One (1) paper copy and a digital PDF drawing of the proposed subdivision; (Bylaw No. 1669) 1.1.2.4. Legal description; 1.1.2.5. The location and setbacks of all existing structures; 1.1.2.6. The location of protected areas, elements and / or natural areas; 1.1.2.7. All road frontages with existing road names; 1.1.2.8. Size and dimensions of existing and proposed lots; 1.1.2.9. Existing water bodies and water courses; 1.1.2.10. Topographic information at 0.5m contour lines; 1.1.2.11. Registered Covenants pertaining to existing rights of way or easements; 1.1.2.12. A letter of authorization from the owner if an agent is acting on their behalf. 1.1.3 In considering a subdivision (application for Statement of Conditions, or request for Final Approval or at any time during), the Approving Officer may request that additional information be provided by a registered professional in regards to natural and or geotechnical hazards, both on-site and off-site, which may impact the subdivision (as noted in s.86 of the Land Title Act). These may include but are not limited to: avalanche, debris torrent, earthquake, erosion, flooding, fire, rock fall, land slippage and unstable soils and tsunami. PROCEDURES AND FEES Schedule 1 - 2 1.1.3.1 The registered professional preparing the reports noted in Section 1.1.3 shall provide a statement in that report that the report in question may be relied upon by the City for the purpose of confirming the feasibility of the subdivision. 1.1.4 All reports that relate to the feasablility of any lands within or adjacent to the project are being prepared by the registered professional and to be provided to the City. 1.1.5 The design engineer that is providing their professional seal and signature in regards to the works must ensure that any reports and reviews (including geotechnical work) shall be provided. The work must also be identified on the plans and coordinated with a registered professional of that field. This shall include all private lands, municipal works and lands, and adjacent lands that have been directly or indirectly impacted by the subdivision as necessary. 1.2. Referrals 1.2.1. The City will forward referrals to all relevant City departments and external agencies whose input is required by law or required in the opinion of the Approving Officer regarding the application for subdivision approval. Should the agency require a fee for this referral, the City will provide this information to the applicant. The applicant will be responsible for paying the applicable fees to that agency at that time. The City will not process payments to other agencies. 1.3. Boundary Adjustments 1.3.1. Where the proposed subdivision is a boundary adjustment the appropriate application fee is required in accordance with Table 1. 1.4. Revision to the Layout 1.4.1. If, in the opinion of the Approving Officer, the subdivision layout has changed substantially so that additional referrals and a new Statement of Conditions is necessary, or the Statement of Conditions has expired without application for an extension, the existing file will be closed and a new application and fees will be required. 1.5. Extensions 1.5.1. If the applicant cannot apply for approval of the subdivision within one calendar year from the date of issuance of the Approving Officer’s Statement of Conditions, the applicant may request one twelve month extension and pay the extension fee in accordance with Table 1. (Bylaw No. 1783) 1.5.1.1. The applicant may be subject to new bylaw requirements or fees after one year of the initial application even if an extension has been granted. 1.5.1.2. If no request for extension has been made prior to the expiration of the Statement of Conditions, the applicant must apply for a new Statement of Conditions. PROCEDURES AND FEES Schedule 1 - 3 1.5.1.3. If, in the opinion of the Approving Officer the delay in subdivision approval is due to unreasonable delays on the part of the City, the extension may be granted beyond the twelve month period. (Bylaw No. 1783) 1.5.1.4. Despite subsection 1.5.1, the Approving Officer may consider issuing more than one extension if, in the opinion of the Approving Officer, work has substantially progressed towards completion during the period of the current extension and is reasonably expected to achieve subdivision approval prior to the expiry of the newly requested extension. (Bylaw No. 1783) 1.6. Phased Strata 1.6.1. Applications for approval of a phased strata plan must be accompanied by a fee in accordance with Table 1. 1.7. Bare Land Strata Conversion to Fee Simple Lots 1.7.1. For a Bare Land Strata plan that amends the plan to create fee simple lots, the fee to examine the plan shall be in accordance with Table 1, Unit fees for Pre-Design Meeting of a Subdivision. 1.8. Air Space Parcel Subdivision. (Bylaw No. 1783) 1.8.1. Applications for approval of an Air Space Parcel Subdivision must be accompanied by a fee in accordance with Table 1. (Bylaw No. 1783) 1.9. Pre-Design Meeting 1.9.1. Any applicant intending to construct works or services required for the approval of a subdivision or development shall arrange for a pre-design meeting and pay, at the request for the meeting, an administration fee and a fee for each parcel to be created in addition to the number of existing parcels. 1.10. Works and Services for Subdivision or Development. 1.10.1. All construction drawings required for subdivision or land development that require the review of the City Engineer for approval to construct on site works and services, shall be accompanied by a fee in accordance with Table 1 of this Bylaw. 1.10.2. The applicant shall submit one (1) copy of drawings for those Works and Services prepared by a Professional Engineer for approval by the City Engineer. See Schedule 12 for Drafting Requirements. (Bylaw No. 1669) 1.10.3. Concurrent with the submission of construction drawings, any Professional Engineer engaged by the applicant must provide the City with a letter that: PROCEDURES AND FEES Schedule 1 - 4 1.10.3.1. The Professional Engineer’s scope of engagement shall include, but is not limited to, assurance of the completeness of the design, certification and submission of construction drawings, coordination of engineering sub-consultants and Record drawings and certification that the design and construction of all Works and Services substantially meet Bylaw 1000 requirements. (Bylaw No. 1669) 1.10.3.2. States the following: “I a Professional Engineer qualified and eligible to practice in the Province of British Columbia, hereby certify that the following works as set out on the drawings submitted currently with this letter have been designed to good engineering standards and in substantial accordance with the latest edition of Subdivision and Development Servicing Bylaw No. 1000, and the Master Municipal Construction Documents (MMCD – latest edition), adopted by the City of Langford.” (Signature) (Bylaw No. 1669) 1.10.3.3. States that the Professional Engineer will advise the City Engineer of any severance of engagement during the course of design and construction. 1.10.3.4. Sets out construction cost estimates for the Works and Services, certified by the Record Engineer. (Bylaw No. 1669) 1.10.3.5. States that the Professional Engineer will provide Storm Water Management declarations as outlined in Section 5.14. 1.10.4. Any construction of works and services required under this Bylaw prior to approval to construct by the City Engineer is at the owner’s risk. 1.10.5. Boulevard, street tree and irrigation design shall be provided by the professional Engineer or other recognized professional. Any street enhancements within a City right of way or easement shall require design by a recognized professional unless otherwise dictated by the City Parks Manager. 1.11. Acceptance of Civil Works and Services by the City. (Bylaw No. 1669) 1.11.1. The City will not issue Construction Acceptance of Civil Works and Services that are to be owned and maintained by the City until the Works and Services have been approved and installed, and: (Bylaw No. 1669) 1.11.1.1. The Record Engineer has certified Substantial Performance and concurrently identifies all defects and deficiencies in the Works and Services and any outstanding items; and (Bylaw No. 1669) 1.11.1.2. An application is made by the Record Engineer to the Director of Engineering to acknowledge Substantial Performance. (Bylaw No. 1669) PROCEDURES AND FEES Schedule 1 - 5 1.11.2. Upon being satisfied with the application and certifications of the Record Engineer, the Director of Engineering will issue, in writing, an Acknowledgement of Substantial Performance. (Bylaw No. 1669) 1.11.3. Upon Acknowledgement of Substantial Performance the City will add the Works and Services to the City’s maintenance contract. (Bylaw No. 1669) 1.11.4. The developer shall remedy any defects or deficiencies and complete all uncompleted work identified at time of Acknowledgement of Substantial Performance and shall provide to the City, in addition to the security required by Section 1.15.1, security in the amount of 2 times the amount estimated by the Record Engineer as the cost of remedying defects and deficiencies and completing the Works and Services. The return of this security is conditional upon correction of defects and deficiencies and completion of the Works and Services. Security may be in the form of cash or a letter of credit. (Bylaw No. 1669) 1.11.5. Any defects or uncompleted work identified at time of Acknowledgement of Substantial Performance shall be completed within 2 months (or other period as agreed with the Director of Engineering), failing which the City may perform the work and recover its cost from the security. Construction Acceptance by the City will not be issued until all deficient matters are addressed to the satisfaction of the Director of Engineering. (Bylaw No. 1669) 1.11.6. Geotechnical certification required by Schedule 3 of this bylaw shall be submitted prior to Acknowledgement of Substantial Performance. (Bylaw No. 1669) 1.11.7. The developer shall provide to the Director of Engineering within 2 months of Acknowledgement of Substantial Performance: (Bylaw No. 1669) 1.11.7.1. One AutoCAD and one PDF copy of the Record drawings. (Bylaw No. 1669) 1.11.7.2. As-constructed inventory sheet, supplied by the City, to be completed and submitted to the City as a signed and sealed document by a Professional Engineer. (Bylaw No. 1669) 1.11.7.3. Acceptance by the appropriate utility of all utilities installed within road rights of way. (Bylaw No. 1669) 1.11.7.4. Electrical declaration from the provincial safety authority. (Bylaw No. 1669) 1.12. Application for Subdivision Approval 1.12.1. Any applicant intending to apply for final approval of a subdivision shall pay the appropriate application fee. 1.12.2. If the Approving Officer’s signature has expired and the plans require re-approval due to delays beyond the control of the City, a fee must be paid in accordance with Table 1. PROCEDURES AND FEES Schedule 1 - 6 1.12.2.1. Final approval of the subdivision will not be granted to the applicant by the Approving Officer unless the City has issued Construction Acceptance, or the applicant has entered into a Works and Services Agreement with the City. Subivision plans submitted for final subdivision approval must be accompanied by: (Bylaw No. 1494) A state of title certificate current within seven days of final approval application; All executed legal documentation as required by the Approving Officer, complete with priority agreements if necessary; Deleted. (Bylaw No. 1669) Approved road names included on the plan (Road names must be approved by the Fire Department and in accordance with City street naming policies); One Auto CAD digital copy to NAD83 coordinates, referenced to two monuments; One PDF copy of the subdivision plan; 1.11.4 The owner must provide proof that property taxes are up to date prior to final approval. 1.13. Works and Services Agreements 1.13.1. In the event that an owner of land wishes to obtain approval of a subdivision or issuance of a building permit prior to the construction and installation of works and services required by this bylaw, the owner may enter into a servicing agreement with the City. All Works and Services Agreements may be executed by the City of Langford Council. (Bylaw No. 1555) 1.13.2. A Works and Services Agreement will only be considered after approval has been given for Construction of Works. 1.13.3. Any owner intending to enter into a servicing agreement pursuant to this section must provide to the City a letter of credit, or cash equal to 100% of the cost of the works and services required, the estimate of which is to be certified by a Professional Engineer, and must provide a date for the completion of the works and services for the purposes of s.940 of the Local Government Act. The security shall be returned to the owner upon Construction Acceptance by the City, less any amount retained as security for the owner’s obligations during the Warranty Period. (Bylaw No. 1494) 1.14. Deleted. (Bylaw No. 1669) 1.14.1. Deleted. (Bylaw No. 1669) PROCEDURES AND FEES Schedule 1 - 7 1.14.2. Deleted. (Bylaw No. 1669) 1.15. Warranty Period and Security 1.15.1. During the Warranty Period, the developer shall remedy all defects and deficiencies becoming apparent in the Works and Services, and shall provide upon Acknowledgement of Substantial Performance by way of cash or a letter of credit, security in the amount of 10% of the actual cost of the Works and Services as certified by the Record Engineer, to ensure performance of the Developer’s obligations during the Warranty Period, which shall be returned to the Developer upon Final Acceptance. (Bylaw No. 1669) 1.15.2. The actual cost of the Works and Services for the purposes of Section 1.15.1 shall be certified by a Professional Engineer and approved by the City. (Bylaw No. 1494) 1.15.3. The City may draw upon the Warranty Bond in whole or in part at any time prior to the expiration of the one year warranty period for repairs pertaining to the installation of the works and services, if the developer fails to do so within a reasonable time period as stipulated by the City Engineer. 1.15.4. Should a deficiency be noted at any time during the one-year warranty period, the warranty provider will be notified and given 30 days to repair the deficiency to City standards. After acceptance of the repair, the City may elect to extend the warranty period for the repaired item for up to one year. 1.15.5. The one year warranty bond shall be returned at final acceptance. Table 1 – 1: Applications and Fees Section Application Type Fee Unit Fee 1.1.1 Application for the Approving Officer’s Statement of Conditions (Residential Lots) $580 Plus, $200 per new lot created 1.1.1 Application for the Approving Officer’s Statement of Conditions (Commercial or Industrial) $690 Plus, $500 per new lot created 1.3.1 Boundary Adjustment $970 Plus $250 per each additional lot line to be adjusted 1.4.1 Application for a revised Statement of Conditions (when applied for within one year of original application), which may include an extension $970 Plus, $200 per amendment 1.5.1 Extension of a Statement of Conditions $340 12-month extension 1.5.1 Signature Expiration (or re-signat
The bylaw continues in the official PDF.